Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
SUMMAR !" #E$%ER &ill $o. %escri'tion
Page $o.
A(ount )RM*
DESIGN OPTION I
1f
Footing Works
FW/1
0.00
2
Provisional Sum
PS/1
40,000.00
40,000.00 Allow for and detail here if re!uired, for "onvinien"e "onvinien"e in #ri"ing$ items or e%#enditure not #ri"ed elsewhere in these &ills of !uantities 'onsultation Fee
2,000.000
#otal Esti(ated Cost
(
&ill $o. %escri'tion
Page $o.
+2,000.00
A(ount )RM*
DESIGN OPTION II
1#
Piling Works
PW / )
)),*+4.+0
2
Provisional Sum
PS/1
20,000.00
+),*+4.+0 Allow for and detail here if re!uired, for "onvinien"e "onvinien"e in #ri"ing$ items or e%#enditure not #ri"ed elsewhere in these &ills of !uantities 'onsultation Fee
#otal Esti(ated Cost
2,-2.2+
(
-,-+/.2
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
TOTAL COST IF CONSIDER SUM OPTION I AND OPTION II:
,-+/.2
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
3.1 F3356 W378S A P739S3A$ o
:es"ri#tion
;nit
7ate
Amount
F3356 W378S 7>F37'>: S5; '3'7>5> W378 7einfor"ed "on"rete grade 40 as s#e"ified
>%"avate and "onstru"ted #ad footing using "on"rete grade 40 as s#e"ified in foundations.
FW/)
m)
+00
0.00
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang #o Su((ar3 !f #ender4
FW/4
0.00
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
3. 2 P739S3A S;? F37 F3356 W378 o
:es"ri#tion
;nit
7ate
Amount
P739S3A S;?S 5he following Provisional Sums #rovided shall &e e%#ended as dire"ted &= the Su#erintending 3ffi"er or dedu"ted in whole or in #art if not e%#ended '356>'@ F;: A
Allow a Provisional Sum of 7inggit ?ala=sia 5wet= 5housand 3nl= 7? 40,000.00$ as a "ontigen"= fund
PS/+
40,000
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang #o Su((ar3 !f #ender4
PS/
40,000.00
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
3.1 P6 W378S A P739S3A$ o
:es"ri#tion
;nit
7ate
Amount
P6 W378S 6>>7A@ P6 F37?A53
A
Allow for handling and maintaining #iling frame, #lant, tools and an"illar= e!ui#ments for the #ro#er e%e"ution of the whole #iling works in"luding all ne"essar= movement a&out the site as often and whenever ne"essar= staging, #latform and an= idling and standing time, et"
tem
+,000.00
Piling Plants and >!ui#ment Allow for the #rovision of trans#orting to the site, handling, assem&ling, dire"ting, dismanling and removal off site after "om#letion all ne"essar= #iling frame, #lant, tools and an"illar= e!ui#ments for the #ro#er e%e"ution of #iling works
tem
20,000.00
PW/
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang #o Collection4
2+,000.00
3.1 P6 W378S A P739S3A$ o
:es"ri#tion
;nit
7ate
Amount
P6 P7>'AS5 P7>S57>SS>: '3'7>5> SP; P>S F37 >>9A5>: WA5>7 5A8 F3;:A53 Pre"ast #restressed "on"rete s#un #iles 6rade 0 as s#e"ified, in"luding all ne"essar= formwork reinfor"ement and lifting toggle )00mm diameter #reliminar= s#un #iles '
12m long nitial #ile, "om#lete with head and shoe
no
2
*1.2
1,+2.40
:
Pile e%tension e%"eeding ).0m length
m
12
++.
.20
>
Bandle, trans#ort, #it"h and drive
m
)
10.0
)0.00
F
Pile Coints fillet weld
no
2
2*.
+.20
6 'utting off to#s to re!uired levels and #re#aring heads reinfor"ement for "on"rete #lug
no
2
4.+
-+.00
B
no
1
no
2
1000
2,000.00
B
?aintain oad 5est on )00mm diameter #restressed "on"rete s#un #ile as s#e"ified !R Pile :riving Anal=sis 5est on )00mm diameter #restressed "on"rete s#un #ile as s#e"ified
0.00
)00mm diameter working s#un #iles
12m long nitial #ile, "om#lete with head and shoe
no
)
*1.2
2,)4).0
D
Pile e%tension e%"eeding ).0m length
m
1*
++.
1,000.*0
8
Bandle, trans#ort, #it"h and drive
m
+4
10.0
+40.00
Pile Coints fillet weld
no
)
2*.
*+.*0
? 'utting off to#s to re!uired levels and #re#aring heads reinfor"ement for "on"rete #lug
no
)
4.+
142.+0
no
?5 or P:A 5est on )00mm diameter #restressed "on"rete s#un #ile as s#e"ified
PW/*
0.00
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang 3 >%"avate and "onstru"ted #ile "a# using "on"rete
m)
24-.0
0.00
#o Collection4
*,*+4.+0
3.1 P6 W378S A P739S3A$ o
Amount 'olle"tion P6 W378S
PW/-
PW/1
2+,000.00
PW/2
*,*+4.+0
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
#o Su((ar3 !f #ender4
PW/10
)),*+4.+0
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang
3. 2 P739S3A S;? F37 P6 W378 o
:es"ri#tion
;nit
7ate
Amount
P739S3A S;?S 5he following Provisional Sums #rovided shall &e e%#ended as dire"ted &= the Su#erintending 3ffi"er or dedu"ted in whole or in #art if not e%#ended '356>'@ F;: A
Allow a Provisional Sum of 7inggit ?ala=sia 5wet= 5housand 3nl= 7? 20,000.00$ as a "ontigen"= fund
PS/11
20,000
Construction of 1.02 Million Liter Elevated Reservoir and Associated Works at Penang #o Su((ar3 !f #ender4
PS/12
20,000.00