type of pavement for ports and guide for using the type of pavement for the port terminal and roads from:- 1-Asphalt 2-concrete paver 3-RCC roller compact concrete 4-Slip paver concrete …Full description
QATAR QATA R SHELL SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
D
B
16.03.2008
Ready For Construction
SB
UA
ZG
RFC
C
A
26.01.2008
Ready For Construction
SB
UA
MC/ZG
RFC
B
O
27.11.2007
Issued for Review
IU
UA/IO
MC/ZG
IFR
25.11.2007
Issued for Internal Review
IU
UA/IO
MC/ZG
IIR
Date
Description
A GAMA Rev.
Project Rev
No.
No.
Prepared Checked Approved By By By ORIGINATOR
Status
QSGTL PEARL PROJECT C2 ASU Construction Works
INSPECTION INSPECTION AND TEST PLAN PLA N ROADS & PAVING WORKS(FSI) S. GAMA QATAR
E. Not used
I: INSPECTION / TEST Item
1
2
3
4
5
Activity
Fill Material a) Classification of Soil b) Particle Size Distribution c) Optimum Moisture Content Water a) Chlorides b) Sulphates c) Ph d)Total Solids
Excavation (FSI)
Fill (In – situ) (FSI)
Soil density (compaction) and layer thickness
6
CBR (optional)
7
Final Elevation Checks
T-4.234.580 Rev. B
Characteristic to be Verified
3
Every 1000 m /MT
Date / REV.
X. CONTRACTOR QC
R: DOCUMENT REVIEW
C. COMPANY
S: SURVEILANCE
Control Procedure Reference
Responsible Party
a) Soil condition of excavated bottom b) Excavation completed and approved for next activity a) Visual inspection prior backfilling and scarifying the top 150 mm of sub grade b) Area free of deleterious material prior to backfilling c) Adjacent below ground structure correctly coated and protected in accordance with project specification
H: HOLD POINT. W: W:
WITNESS X
C
A
Lab Reports
I
R
S
I
BS 6068 and BS3148
Source Approval
R
R
R
I
Site Engineer
Latest Project drawings for required bottom levels and condition