Donner Company – Case Study Outline
1. How does Donner compete?
2. What would I see if you took me on a tour of the Donner production facilities? Let’s follow a typical 8-board panel through the process. What are the steps involved and how long will each take? [see flowchart]
3. What design decisions did Plummer make in setting up the process represented in the flowchart? What operating decisions must be made on a daily basis?
Technology choice. What are the economics of the decisions of when to use CNC router vs. punch press? Micronic vs. manual drill?
Dry film photoresist photoresist capacity capacity analysis. What is the capacity if given an order size of 8 boards? What is the bottleneck?
panel prep lam & exp develop
set up time run time per order per order 5 min 0.2 min 20 min 2.0 min 20 min 0.2 min
total time per order
daily capacity in orders
daily capacity in boards
What if the order size were 80 boards or 800 boards? order size in boards 8 boards 80 boards 800 boards
order size in panels 1 / order 10 / order 100 / order
lam & exp process time 22 min 40 min 220 min
daily capacity in orders
daily capacity in boards
Capacity is not an absolute number, but is dependent on factors such as: _______________, _______________, _______________, _______________, _______________. _______________.
Labor times, as well as capacity, depend not only on the size of the order, but the mix of other products in the shop at the same time, their priorities, and on what equipment is available.
4. What happens when a customer wants an order? What does each person do? [see information flow chart]