CSWIP 3.1 Beginners can use this pdf for exam. CSWIP 3.1 Practical Pipe Examples AND VERY HELPFUL FOR THE TEST. I PERSONALLY REFERRED THIS PDF FOR MY OWN EXAM AND I SCORED 81%. EVERY B…Description complète
CSWIP 3.1 Beginners can use this pdf for exam. CSWIP 3.1 Practical Pipe Examples AND VERY HELPFUL FOR THE TEST. I PERSONALLY REFERRED THIS PDF FOR MY OWN EXAM AND I SCORED 81%. EVERY B…Full description
Descrição completa
CSWIP PRACTICALFull description
Health and safetyFull description
Full description
TransportationFull description
Cswip Slide
Descripción completa
CSWIP Reviewer
QUESTION ANSWERFull description
QUESTION ANSWER
CSWIP Exam Tips
Atração MentalDescrição completa
CSWIPDescrição completa
1
Descripción completa
Full description
PipeFull description
CSWIP 3.1 Welding Inspection
Practical Pipe Inspection TWI Training & Examination Services Course Reference WIS 5 Course notes section reference 23 World Centre for Materials Joining Technology
Pipe Inspection Examination Remember in the CSWIP 3.1 Welding Inspectors examination your are required to conduct a practical examination of a pipe test weld, complete a thumb print sketch and a final report on your findings
Time allowed 1 hour and 45 minutes Use your own code i.e. API 1104
Pipe Inspection Points 1) Use a pencil for the arrow lines, but make all written comments and measurements in ink only 2) Report everything that you can observe 3) Do not forget to compare and sentence your report 4) Do not forget to date & sign your report 5) Make any observations, such as recommendations for further investigation for crack-like imperfections. World Centre for Materials Joining Technology
Pipe Inspection Examination After you have observed an imperfection and determined its type, you must be able to take measurements and complete the thumb print report sketch The first thumb print report sketch should be in the form of a repair map of the weld. (i.e. All observations are Identified Sized and Located) The thumb print report sketch used in CSWIP exam will look like the following example.
Pipe final Inspection Report After you have completed your thumb print report sketch of your test pipe the next step is to complete your final report again the report must be completed in ink (no pencil). The report must be completed to your thumb print sketch, do not leave any boxes empty, every box must be completed or dashed out. You must also make any comments you feel are necessary regarding any defects observed. The report form used in CSWIP will look like the following example. World Centre for Materials Joining Technology
Pipe final Inspection Report Root EXTERNAL DEFECTS
Defects Noted
Defect Type
Accumulative Total 2
Code or Specification Reference Maximum Allowance 3
Misalignment
2mm
3mm
Excessive Root Penetration
4mm
------------
Incomplete Root Penetration
50mm
Lack of Root Fusion
Section/ Table No 4
Accept/Reject 5
7.2
Accept
Not specified
Accept
25mm
9.3.1
Accept
20mm
25mm
9.3.4
Accept
Root Concavity
2mm depth
1mm
9.3.6
See Notes ***
Root Undercut
0.5mm
0.8mm
9.3.11
Accept
Cracks/Crack-like defects
NONE
------------
9.3.10
Accept
Slag inclusions
70mm long
None
7.8.2
Reject
Porosity
1.5mm ∅
2mm ∅
9.3.9.3
Reject
Laps/Laminations
NONE
------------
----------
Accept