Construction Cost Estimate
SN 1 2 3 4 5 6 7 8 9
Material Bricks Sa Sand Crush Steel Cement Mud Shuttering Shuttering for Roof Ti Tiles for Front Grills
10 Glass 11 Lamination
12 ChipBoard
13 Pl P ly
14 W ood
15 16 17 18 19 20 21 22 23 24
Gate Fl Flooring Ba Bathrooms flooring Doors (16) Civi Civill Work Work Elecri Elecrifica ficatio tion n Sanita Sanitatio tion n Pain Paintt Carp Carpen ente ter r Glas Glass s Work Work
Requirement Bricks 20 / sq ft Sand 1 Truck/ 167 Sq. ft Crush 0.6 Cubic feet / sq ft Steel 1.35 kg / sq ft Cement 1 Bag / 3.07 sq ft
Rate / Unit (in Rs.)
10 Marla
5000/ per Thousand 5000 /Truck (350 cub ft) 10000 3 ton @ 60000 340/ Bag
Quantity 40,000 12 6 2,700 651
65.03 Sqm for 10 Marla 425/ Sq m Grills 160 sq ft for 5 Marla; 160 Sq ft for 150/ Sq ft 7 Marla and 280 sq ft for 10 Marla Glass 140 sq ft for 5 Marla; 140 sq ft for 30/ Sq ft 7 Marla and 250 sq ft for 10 Marla Lamination 12 sheets for 5 Marla House; 1025/ Sheet 16 Sheets for 7 Marla and 18 for 10 Marla Chip Board 66 sheets for 5 Marla 700/ Sheet House; 74 Sheets for 7 Marla and 74 sheets for 10 Marla Ply 12 sheets for 5 Marla House; 17 210/ Sheet Sheets for 7 Marla and 19 sheets for 10 Marla House W ood 242 Sq ft for 5 Marla; 296 Sq ft for 15/ Sq Ft 7 Marla and 296 Sq ft for 10 Marla House 150 /Sq ft For the whole covered area 35/ Sq ft for 4 bathrooms 450/ Sq m 80/ Sq ft
Total Cost
Material Labour @ 200 per sqft Land
10 Marla 721,498 400,000 2,100,000
200,000 3,421,498
Miscellaneous Total Per Sqr Feet Cost (Labour+Material)