with concrete design of beams, columns and footings with seismic and wind design
Full description
documentDeskripsi lengkap
Full description
Documentación en español de la hoja de cálculo Spreadsheet.
Soal SpreadsheetFull description
Descripción completa
Descripción completa
Full description
Depth Conductor
Pharrell Williams
K13 SpreadsheetDeskripsi lengkap
Full description
tactical missile design spread sheet
spreadsheetFull description
Martin Berkham's Leangains spreadsheet he used with clients. this is his actual personal spreadsheetFull description
Spreadsheet Untuk Akuntansi 2013Deskripsi lengkap
IN-PLACE CONDUCTOR / WELLHEAD / CONNECTION ANALYSIS TOOL -- Version 1.1 Well Name:
Example #1
Configuration Fixed Point Below Mudline 30.0 ft Wellhead Stick Up Above Mudline 30.00 ft LMRP/BOP Height ft 51 Conductor Specification OD Wall Thickness Grade Include secondary conductor? Include surface casing?
36.0 2.00 70 YES YES
in in ksi
Enter Vessel offsets (%) vs Shear loading at top conductor Vessel offset (%)
Shear load (kips)
0% 2% 4% 6% 8% 10%
10.0 30.0 50.0 70.0 90.0 110.0
Secondary Conductor Specification OD 28.0 in Wall Thickness 0.750 in Grade ksi 52 Surface Casing Specification OD in 22 Wall Thickness 1.000 in Grade ksi 80 Minimum Factor of safety - Pipe Minimum Factor of safety - Connection Other information Enter angle of rotation at top of BOP (bottom flex joint) Enter rotational stiffness of bottom flex joint Enter axial force at top of conductor (force from Riser) Wellhead Bending Strength
Example #1 Factor of Safety for Pipe Body vs % of Vessel Offset for 36 in OD;2 in Wall; X-70 Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft Secondary Conductor Included?: YES Surface Casing Included?: YES Conductor Secondary Conductor Surface Casing
Example #1 Factor of Safety for Pipe Body vs % of Vessel Offset for 36 in OD;2 in Wall; X-70 Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft Secondary Conductor Included?: YES Surface Casing Included?: YES Conductor Secondary Conductor Surface Casing
Example #1 Factor of Safety for Connection vs % of Vessel Offset for 36 in OD;2 in Wall; X-70 Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft Secondary Conductor Included?: YES Surface Casing Included?: YES Elastic Plastic
5.00
4.00
3.00
2.00
1.00
0.00 0%
1%
2%
3%
4%
5%
6%
7%
Vessel Offset (% of Water Depth)
8%
9%
10%
Total M om e n t o n W e llhe ad (kip -ft)
Example #1 Wellhead Analysis Stick-Up: 30 ft; Fixed Point Below Mudline: 30 ft; LMPR/BOP Length: 51 ft Secondary Conductor Included?: YES Surface Casing Included?: YES