Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles
Page Page 1 of 6
Electrical Notes & Articles Sharing Abstracts,Notes on various Electrical Engineering Topics.
Calculate IDMT over Current Relay Setting (50/51) OCTOBER OCTOBER 11, 2013 27 COMMENTS COMMENTS (HTTPS://E (HTTPS://ELECT LECTRICA RICALNOTE LNOTES.WOR S.WORDPRES DPRESS.CO S.COM/2013 M/2013/10/11 /10/11/CAL /CALCULAT CULATE-IDM E-IDMTTOVER-CURRENT-RELAY-SETTING-5051/#COMMENTS) ◾ ◾ ◾
◾ ◾
◾
Calculate setting of IDMT over Current Relay for following following Feeder and CT Detail Feeder Detail: Detail: Feeder Load Current 384 Amp, Feeder Fault current Min11KA and Max 22KA. CT Detail: CT installed on feeder is 600/1 Amp. Relay Error 7.5%, CT Error 10.0%, CT over shoot 0.05 Sec, CT interrupting Time is 0.17 Sec and Safety is 0.33 Sec. IDMT Relay Detail: IDMT Relay Low Current setting: Over Load Current setting is 125%, Plug setting of Relay is 0.8 Amp and Time Delay (TMS) is 0.125 Sec, Relay Curve is selected as Normal Inverse Type. IDMT Relay High Current setting :Plug : Plug setting of Relay is 2.5 Amp and Time Delay (TMS) is 0.100 Sec, Relay Curve is selected as Normal Inverse Type
Calculation of Over Current Relay Setting: (1) Low over over Curren Currentt Settin Setting: g: (I>) (I>) ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾
Over Load Current (In) = Feeder Load Current X Relay setting = 384 X 125% =480 Amp Required Over Load Relay Plug Setting= Over Load C urrent (In) / CT Primary Current Required Over Load Relay Plug Setting = 480 / 600 = 0.8 Pick up Setting of Over Current Relay (PMS) (I>)= CT Secondary Current X Relay Plug Setting Pick up Setting of Over Current Relay (PMS) (I>)= 1 X 0.8 = 0.8 Amp Plug Setting Multiplier (PSM) = Min. Feeder Fault Current / (PMS X (CT Pri. Current / CT Sec. Current)) Plug Setting Multiplier (PSM) = 11000 / (0.8 X (600 / 1)) = 22.92 Operation Time of Relay as per it’s Curve Operating Time of Relay for Very Inverse Curve (t) =13.5 / ((PSM)-1). Operating Time of Relay for Extreme Inverse Curve (t) =80/ ((PSM)2 -1). Operating Time of Relay for Long Time Inverse Curve (t) =120 / ((PSM) -1). Operating Time of Relay for Normal Inverse Curve (t) =0.14 / ((PSM) 0.02 -1). Operating Time of Relay for Normal Inverse Curve (t)=0.14 / ( (22.92)0.02-1) = 2.17 Amp Here Time Delay of Relay (TMS) is 0.125 Sec so Actual operating Time of Relay (t>) = Operating Time of Relay X TMS =2.17 X 0.125 =0.271 Sec Grading Time of Relay = [((2XRelay Error)+CT Error)XTMS]+ Over shoot+ CB Interrupting Time+ Safety Total Grading Time of Relay=[((2X7.5)+10)X0.125]+0.05+0.17+0.33 = 0.58 Sec Operating Time of Previous upstream Relay = Ac tual operating Time of Relay+ Total Grading Time Operating Time of Previous up Stream Relay = 0.271 + 0.58 = 0.85 Sec
(2) High over over Curr Current ent Sett Setting: ing: (I>> (I>>)) ◾ ◾ ◾
Pick up Setting of Over Current Relay (PMS) (I>>)= CT Secondary Current X Relay Plug Setting Pick up Setting of Over Current Relay (PMS) (I>)= 1 X 2.5 = 2.5 Amp Plug Setting Multiplier (PSM) = Min. Feeder Fault Current / (PMS X (CT Pri. Current / CT Sec. Current))
Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾
Page 2 of 6
Plug Setting Multiplier (PSM) = 11000 / (2.5 X (600 / 1)) = 7.33 Operation Time of Relay as per it’s Curve Operating Time of Relay for Very Inverse Curve (t) =13.5 / ((PSM)-1). Operating Time of Relay for Extreme Inverse Curve (t) =80/ ((PSM)2 -1). Operating Time of Relay for Long Time Inverse Curve (t) =120 / ((PSM) -1). Operating Time of Relay for Normal Inverse Curve (t) =0.14 / ((PSM) 0.02 -1). Operating Time of Relay for Normal Inverse Curve (t)=0.14 / ( (7.33)0.02-1) = 3.44 Amp Here Time Delay of Relay (TMS) is 0.100 Sec so Actual operating Time of Relay (t>) = Operating Time of Relay X TMS =3.44 X 0.100 =0.34 Sec Grading Time of Relay = [((2XRelay Error)+CT Error)XTMS]+ Over shoot+ CB Interrupting Time+ Safety Total Grading Time of Relay=[((2X7.5)+10)X0.100]+0.05+0.17+0.33 = 0.58 Sec Operating Time of Previous upstream Relay = Ac tual operating Time of Relay+ Total Grading Time. Operating Time of Previous up Stream Relay = 0.34 + 0.58 = 0.85 Sec
Conclusion of Calculation: ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾ ◾
Pickup Setting of over current Relay (PMS) (I>) should be satisfied following Two Condition. (1) Pickup Setting of over current Relay (PMS)(I>) >= Over Load Current (In) / CT Primary Current (2) TMS <= Minimum Fault Current / CT Primary Current For Condition (1) 0.8 > =(480/600) = 0.8 >= 0.8, Which found OK For Condition (2) 0.125 <= 11000/600 = 0.125 <= 18.33, Which found OK Here Condition (1) and (2) are satisfied so Pickup Setting of Over Current Relay = OK Low Over Current Relay Setting: (I>) = 0.8A X In Amp Actual operating Time of Relay (t>) = 0.271 Sec High Over Current Relay Setting: (I>>) = 2.5A X In Amp Actual operating Time of Relay (t>>) = 0.34 Sec
You May Like • 1.
FILED UNDER UNCATEGORIZED About Jignesh.Parmar Jignesh Parmar has completed M.Tech (Power System Control), B.E(Electrical) from Gujarat University. He has more than 13 years experience in Power Transmission-Power Distribution-Electrical energy theft detection-Electrical Maintenance-Electrical Projects (Planning-Designing-coordination-Execution). He is Presently associate with one of the leading business group as a Deputy Manager at Ahmedabad,India. He is Freelancer Programmer of Advance Excel and design useful Excel Sheets of Electrical Engineering as per IS,NEC,IEC,IEEE codes. He is technical Author for Electrical Mirror and Electrical India Magazines. He is Technical Blogger and Familiar with English, Hindi, Gujarati, French languages. He wants to Share his experience & knowledge and help technical enthusiasts to find suitable solutions and updating themselves on various Engineering Topics. ʺ
ʺ
ʺ
ʺ
27 Responses to Calculate IDMT over Current Relay Setting (50/51) elango.k says:
Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles
Page 3 of 6
October 11, 2013 at 4:32 pm Hello sir- what is the use of low over current(>i) setting and high over current setting(>>i), sir i requesting you to post some notes on this topic thankyou Reply engelect says: October 12, 2013 at 11:01 pm dear elango, Just sharing my knowledge, Always remember that we must limit ENERGY (thermal) of fault. Since it is energy it is always consist of Power (P) which equal with current (I) and co nsist of t (time). low over current is to limit thermal withstand of electrical equipment. Whereas high over current setting is to limit short circuit withstand. short circuit withstand is not only dealing with thermal but it is also dealing with electromagnetic force withstand of an electrical equipment, such as busbar, bus duct, etc. Faster clearing big fault (it is dealing high current setting) then we secure our structure of busbar/busduct to prevent system catastrophic. Setting high over current setting shall be wise to distinguish between real short circuit and starting current. Reply elango.K says: October 16, 2013 at 3:03 am Hello sir, I am not clear with this explanation, can you explain with some example. thankyou elango.k says: October 11, 2013 at 4:36 pm Hello sir- what is the use of low over current(>i) setting and high over current setting(>>i), sir i requesting you to post some notes on this topic thankyou Reply vilas says: October 13, 2013 at 12:41 pm DEAR SIR CAN U PL GIVE EXAMPLE OF IDMT RELAY SETTING CALCULATION FOR 132/33 KV 25 MVA TF WITH ONE I/C & 3 FEEDERS OF 200 A EACH WITH RELAY SELECTION CURVE Reply Naresh Kumar says: October 24, 2013 at 11:29 am Dear Sir, What is the size of 3-core,11KV cable required for 1000 KVA, 11/.415 KV transformer.By simple calculation for HT side current of 52 AMP, 3 core, 25 SQ mm cable will suffice. But i have noticed that at some places 180 SQ. mm cable being used.Does HT cable selection is related with fault level and HT cable at 11 kv should not be used less than 150 Sq. mm. Pl. provide your valuable comments on HT cable selection for transformers. Thanks. Naresh. Reply Jignesh.Parmar says: October 24, 2013 at 2:45 pm For HT Cable one important criteria which need to be consider is Short circuit level. Normally 11KV S.C level is 20 to 25KA at it varies according to Electricity provider company.. and normally 150 Sq.mm Cable S.C falls in 17 to 20KA. For HT cable you have to consider S.C level of utility first than Current carry capacity of Cable. Reply Naresh Kumar says: October 25, 2013 at 9:57 am Thanks. nagendra mathur says: November 5, 2013 at 11:03 am Please let me know the details of selection of Neutral grounding resistance. What should be nGR value for a 20 MVA, 132/6.6 KV Trnsformer, primary side fault 40 MVA for 1 sec
Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles
Page 4 of 6
Reply Shakeel Ahmad says: November 15, 2013 at 7:30 am Dear Jignesh, what is the best location of REF and SBEF CTs on Transformer side? i have 100 0kVA Transformer and we are planning to mount the CTs either in LV cable box, REF on 1C630 Neutral Cable and SBEF on 1C240 Earth Cable OR Below LV cable box in Enclosure. Your suggestion please.. Reply elango.k says: December 1, 2013 at 4:47 pm Hello sir- what is the use of low over current(i>) setting and high over current setting(i>>i), sir i requesting you to post some notes on this topic thankyou Reply kamlesh says: December 17, 2013 at 8:51 am why we can not maintain of power factor one. if we mantaitain 1 and above what is problem in transformer and power. Reply P.Koteswar Rao says: December 30, 2013 at 12:06 pm Dear Sir, Please advice regarding df / dt relay minimum and maximum setting details. We are using ABB make, REF type relay for 11kv grid feeder. We are going to synchronize 30MW,11kv DG with this grid breaker. Power failure time, I wish to isolate grid feeder. Please advice. Reply Suraj Ram says: January 2, 2014 at 10:03 am sir can you please give an example how do understand it on breaker trip curve or Time current curve Reply Prabakaran says: January 5, 2014 at 4:54 am Sir, thank u for your notes on Normally inverse curve. By the same way plz give the formula for Extermly inverse curve. Reply sartajalam says: January 26, 2014 at 2:19 pm sir,i need testing procedure of over current relay. Reply jagdish ghogare says: February 17, 2014 at 9:54 am Dear parmar Sir can i get your phone number so that i can take some help from you Reply Murali krishnan says: February 25, 2014 at 4:19 pm Dear Jignesh, please advise where we can find the min fault level data. Reply Rohaida says: May 8, 2014 at 6:56 am Dear Sir, Your “Electrical Thumb Rules-(Part-8)” is referred. The details: Feeder Fault current Min11KA and Max 22KA.
Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles
Page 5 of 6
I’m working on Overcurrent relay setting of Primary Transformer Protection (2000KVA with 6% impedance) with 200/5 CT ratio. Can you guide me on how to calculate min & max fault current. Reply Bernard Farrugia says: December 2, 2014 at 10:37 am Why in the standard IDMT td(I) calculation you haven’t divided by Beta i.e. by 2.97? as regulated by the IEC… Thanks Reply Prageesh says: February 4, 2015 at 6:33 pm Dear Sir, In an excellent manner you have explain 50/51N relay setting. Can you please guide to set the 87 relay for 110/33KV, 50MVA, 50Hz transformer. Reply mukund harne says: February 25, 2015 at 1:40 pm The details provided are really very useful. Reply Aamir Javaid Malik says: April 25, 2015 at 9:54 am Dear Sir, In your example for ‘calculating setting of IDMT over-current rely’ mentioned above, kindly guide me how would you prevent relay tripping from transformer inrush current when feeder breaker is switched on. You may assume any capacity of transformer installed in the outgoing feeder in above example. Reply jegatheshwaran says: May 11, 2015 at 4:38 pm Sir, I would like to known how relay can be wiried and implemented and settings and how its configured in relay panel. And i had a doubt, this realy implementation and configuration and setting are different from one another?????? If it’s different plz give the notes to get the idea about t hat please sir Thank you……. Reply Muthukumaran says: May 21, 2015 at 8:55 am operating time of low current operating time is higher than high current setting Reply Pradnya says: July 11, 2015 at 6:46 pm Respected sir, For IDMT relay having CT ratio 300:1, load current 470A, maximum fault current is 2380A and minimum fault current is 720A, then how to select upper and lower boundaries on TMS & Plug setting of relay. Kindly guide me sir, looking forward for your positive reply. Reply kader says: July 16, 2015 at 8:35 am please clarify 0.14 / ( (7.33)0.02-1) = 3.44 Amp , how? Reply
Calculate IDMT over Current Relay Setting (50/51) | Electrical Notes & Articles
Page 6 of 6