Questions on Practical / Book of Specification Use the information below to answer question 1 – 9 A welding procedure is being qualified for the welding of A709 grade 36 plates for cyclically loaded structures. Assuming this structure was for the construction of high way bridge. The welding process is SMAW, and the welding configuration is a single V-groove weld with a steel backing. The thickness of the test plate is 15.9 inches. The plate is welded in the vertical position. 1) What is the required electrode classification for this qualification? a. E70XX b. ER70S-X c. E6XT-X d. a and b 2) What is the required preheat and interpass temperature for this Procedure? a. 225 F minimum to 107C maximum b. 300 F minimum to 150C maximum c. 150 F minimum to 107C maximum d. 225 F minimum to 107C minimum e. None of the above 3) For what thickness will this Procedure be qualified if the required tests are successfully passed? a. Unlimited b. 1/8 to 2T inches c. 1/8 to unlimited d. Both a and b e. Both b and c 4) Assuming ASTM A514 and A517 was qualified replacing A709 grade 36 steel. What shall be the required visual inspection criteria to be performed on the completed weld? a. The visual inspection shall be performed not less than 48 hours after completion of the weld, in order to check for the susceptibility of these steels to underbead (delayed) cracking b. The visual inspection shall be performed not less than 48 hours after completion of the weld, in order to permit any weld porosity present at the time of welding to clear up c. The visual inspection shall be performed in less than 48 hours after completion of the weld, because during these period the weld is said to be solidified
PEAM Integrated Welding Academy Limited.RC:1147177
d. The visual inspection shall be performed not less than 48 hours after completion of the weld, in order to provide time for the quality personnel to leave the area for Xray personnel e. None of the above 5) If the welder who performs this procedure qualification test is also qualified, in what position that individual qualified for production welding? a. F,OH groove in plate b. F,H,OH fillet in plate c. F fillet in pipe d. None of the above e. All of the above 6) What test specimens are required for this qualification test? a. 2 reduced section tensiles, 2root bends, 2 face bends b. 2 reduced section tensiles, 4 side bends c. 2 reduced section tensiles, 2root bends, 2 face bends, 2 macro etch specimens d. 2 reduced section tensiles, 2root bends, 2 face bends, 4 side bends e. None of the above 7) What F – number(s) apply to the proper filler metal for this qualification? a. 1 and 6 b. 2 and 6 c. 1 and 4 d. 4 only e. 1 only 8) In the welding procedure qualification above, what is the required and acceptable NDT method to be used to verify the soundness of the weld? a. VT b. UT only c. RT only d. RT or UT e. None of the above 9) If this same welding procedure is qualified on 16 inches schedule 160 pipe, for what range of diameters and wall thicknesses is this procedure considered qualified? a. Diameter 16” and over; wall thickness from 3/8 to unlimited b. Diameter 16” and over; wall thickness over 3/8 c. Diameter 16” and over; wall thickness unlimited d. Diameter 16” and over; wall thickness from 1/8 to 1/2 e. None of the above
PEAM Integrated Welding Academy Limited.RC:1147177
Use the information below to answer question 11 – 20 The Senior Welding Engineer of PEAM integrated welding academy limited has specified a welding procedure specification for her new structural project. The procedure is being qualified for the welding of ASTM A36 steel plate. This procedure was used to qualified individual welder, using SMAW process. The welding engineer also specified B-U2 single V-groove weld configuration with a steel backing, 1/8 root opening, 1/8 root face, 60 degree groove angle. Assuming each individual welder was tested on 25.4mm thickness test plate at 3G position. 10) For what thickness is this qualification valid a. Unlimited b. Also qualifies for welding fillet welds on material of unlimited thickness c. a & b d. 5/16” to ¾” e. None of the above 11) What test specimens are required a. 2 side bends tests b. 1 face bend and 1 root bend c. 1 T-joint break d. 2 side bends and 2 root bends e. None of the above 12) Of the following, which electrode classification is considered to be best suited for this qualification a. E7018 b. E7028 c. E6010 d. a & c e. None of the above 13) Assuming the same welder had an existing qualification on 2 inch schedule 80 pipe. The pipe materials are API 5L Grades X42 and X52; SMAW welding process in horizontal fixed (5G) position. For what range of diameters is this qualification valid a. 4 or smaller b. 4 or larger c. ¾” through 4” d. Test diameter and below e. All diameters 14) What test specimens are required in question 13 above a. 2 face bends and 2 root bends b. 1 face bend and 1 root bend c. 2 face bends, 2root bends and 2 reduced section tensiles
PEAM Integrated Welding Academy Limited.RC:1147177
d. 2 side bends and 2 reduced section tensiles e. 4 side bends 15) What is required preheat and interpass temperature for this joint (in question 13 above) 16) What F-number(s) apply to the proper filler metal for this qualification(in question 13 above) 17) What will be the required filler specification for this qualification (in question 13 above) 18) If the welder who performs this qualification test passed, in what positions is that individual qualified for production welding 19) Where should the designation E8015-X be place on procedure qualification record a. Line 1 b. Line 2 c. Line 13 d. Line 24 e. None of the above 20) Where should the designation FCAW be place on procedure qualification record a. Line 5 b. Line 20 c. Line 35 d. Line 2 e. None of the above 21) The designer has specified the joint B-U2a-GF for the welding of two structural members. If the specified groove angel is 30 degree, and the root opening is 3/16 for the initial groove preparation. What is the range of groove angle permitted as fit up for this joint a. (25 to 40) degree b. (15 to 35) degree c. 1/16 in to 3/16 in d. 1/16 in to 1/8 in e. None of the above 22) The designer has specified the joint B-U2-GF for the welding of two structural members. If the specified range of root face as (0 to 1/8 in) for the initial groove preparation of (0 to 1/8 in). What is the range of root face permitted as detail for this joint a. 0 to 3/16 in b. 1/16 in to 3/16 in
PEAM Integrated Welding Academy Limited.RC:1147177
c. 1/16 in to 1/8 in d. 1/8 in to 3/16 in 23) The designer has specified the joint B-U2a-GF for the welding of two structural members. What is the specified root opening for prequalified joint, using the gas shielded FCAW process a. ¼ in b. 3/8 in c. 3/16 d. Not specified 24) The designer has specified the joint B-U2a-GF for the welding of two structural members. What is the acceptable welding processes for the joint a. FCAW b. PAW c. EBW d. GTAW e. None of the above