JOB SAFETY ANAL YSIS Descript ion of Work: STEAM STEAM BLOWING BLOWING Location: Item Acti vit y Potential Hazard Hazard
Hazard Hazard Contro ls Secure necessary permit. A qualified /certified work permit receiver to obtain work permit from an authorized issuer prior to start the job, complies with all instruction specified in the permit. Ensure work permit procedure is followed as per SEPCO approved work permit procedure (Ref # SES-PGB-HS-PRO0008). Inspect the work work location before before issuance of work work permit Only trained and experienced experienced personal will will perform this job Goggles Helmet Insulating and non- slip shoes Fluorescent protective and work clothing Hearing protection Clean work area before starting.Make sure areais well lit. Secure and tighten all parts before starting.Use proper tool accessories.Check accessories.Check and replace any broken or damaged parts Ensure tools and equipment used for the task have been parked and stored properly in safe and designated storage areas.
1
Secure necessary permit
Work permit issued incorrectly
Issuing permit without site inspection
2
Require for PPE
Personnel protect
3
Clear and clean the work area
Equipment damage and personnel injury
4
Equipment check
Injury to personal due to damage tools and equipments
5
Pump operation
Nosie hazard Leakage from flanges Injury due to unprotected rotating parts
Only authorized operator shall operate the equipment All tools and equipments should be in good condition and must be properly
Fire and Electrocution
Ensure that guards are provided for all the rotating parts of the machine/equipments.
Adequate
numbers of fire extinguishers shall be provided in the area.All cables or extension cords shall be secured with GFCI and power tools shall be properly inspected. Wear goggles or any eye protection. Provide sufficient water cooler and encourage consuming more salt with food or giving Hydrolyte solution. Suitably amend working hours by giving more rest in peak hot summer. Use the talk tool keep communication in case to happen the accident . Full body harness is mandatory above 1.8m and 100% tie off shall be observe
Hearing protection is required. Signage shall be posted at the noisy area for the awareness. Ensure that process lines are leak tested
Working in High Temperature Heat Stress Sun Burn if applicable Sun stroke Working in hight Accident fall
6
7
8
Reinstatement
Close work permit
Damage of equipments due to misalignment of pump and moto If the permit is not properly closed, hazard could remain at the jobsite.
Reinstatements shall be done by the trained and authorized person only. Constant monitoring by the responsible person is mandatory while commencing the task. Inform the permit issuer to close the work permit, conduct a joint site inspection and write the date, time and name.
: Work permit procedure (Ref # SES-PGB-HS-PRO-0008).
Special Instructions:
Obtain and follow Work Permit(s) prior to start the job. Proper material storage at site area. Work must be supervised for each process. Proper House- keeping is required on a daily basis. Lifting tools, in good condition. Portable electric tools are in good working condition. Appropriate barricades and safety signs must be posted around the work site. All team members must visit the job site and understand fully the scope of work. All workers working at the job shall be briefed about the JSA to make sure that they all are aware of the JSA.
CAUTION: Al l p ers on s as so ci ated wi th the jo b s hal l ab id e by th e JSA . The J SA s tan ds can cel led on ce c on di ti on s c hange at the job site. The team shall stop all work and revisit the JSA. Prepared by: