Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
A.P. REVISED STANDARD DATA
PART-III
BUILDINGS & ELECTRICAL ITEMS
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
PREAMBLE
1. The existing AP Standard data for various constructions items are based on observations mad
several decades back, mostly utilising eployment of machinery was at the barest minimum. Th Board of Chief engineers have been adopting almost the same data, duly modifying the rates
labour; materials, hire charges of limited machinery, every year. The advent of constructi machinery and its usage in construction industry has changed the structure and methodology
data formulation & rate structure and hence, the present estimation of work item rates are n
reflecting ground reality. The CWC(Ministry of Irrigation) has also recommended that ”whe
standard or schedule of rates are revised or where is necessary to do so, the primary guidin principle should be escalation in labour and material cost and not on trend of rates quoted
contractors”. But the above recommended principle is not being followed by the Board of Chi Engineers in Andhra Pradesh.
2. Government, in GO 7326 (GAD-GPM& AR) Dated 26-10-05, has observed that the age o
“Standard data” requires revision and updation with ref erence to the latest machinery an
contemporary practices and has constituted a High Level Committee to advise on updating an
revision of standard data and schedule of rates. The work has been taken up by CGG and SPIU
irrigation. The secretary (Irrigation ) is the member- convener of the committee Accordingly th
data has been revised adopting the procedures and guidelines given by CWC, Report o
“committee “committee on cost control of river valley Projects, BIS specifications, specifications, NHAI, MORTH, MORD, CPW and Government of Karnataka and revised data and formulated schedule of rates for
infrastructure Departments (I&CAD, R&B, PR and PH). The team of senior engineers interacte
with the S.R Committee of Karnataka on implementation and improvements needed. For irrigatio
works the data pattern as adopted by Karnataka has been considered considered and for other Departmen
Master your semester with Scribd 3. Sequence followed in revision of standard data is, & The New York Times
the data adopted by MORTH,MORD and NHAI etc., is adopted
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
(a) The first step is the revision and formulation of standard data for each wo Special offer for students: Only $4.99/month. component
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
It was proposed to examine the recommendations on important parameters, to refer to high lev
committee, for their specific recommendations for adoption, as they are common to a
departments. The committee made in depth study on the methodology and systems followed b
the reputed National organizations and other States States and made detailed deliberations with HO and representatives of Builders Association of India and
made
recommendations to
Government, on adoption of such parameters in A.P.
5. The Chief Secretary held a detailed discussions on 04-07-2007,with the Secretaries of th Departments and Heads of Departments.
B. GUIDELINES 1) The Revised Standard Data is formulated under four Parts which are applicable to all th Engineering Departments and other Organisations.
PART -1: Irrigation& CAD (Dam and Allied Works, Canals And Allied Works, Canal C.
Works, Tunnels and Allied Works, Preliminary and Maintenance Works, Hydrau Gates and allied works and Leads and Lifts applicable to all Departments PART -2: Roads and Bridges PART -3: Buildings including Electrical Works
PART -4: Drinking Water Supply and Public Health (ONLY FOR WORKS DONE BY MANUA MEANS)
2)
Brief description of item of work. :
Brief description of the item of work to cover all important aspects of the work included in the
the Data . On reading the item description, the user should should be in a position to assess the vario cost components involved in the work.
3)
Data for assessing quantities :
The data reflects various assessments / assumptions made in arriving at the quantities
Master your materials, semester with Scribd machinery, labour and other in-puts. In caseRead of plants and equipment Free Foron 30this Days Sign up to vote title the output main plant is worked out and the requirement of all other inputs and & The New York Times Useful Notassessed useful to match th Cancel anytime.
Special offer for students:output Only $4.99/month. of the main plant. Cycle time of operations is the criteria for assessing the output
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
hours for the purpose of equipment planning and utilisation. The daily out-put is computed du considering the actual available working time and feed back from the field.
For gate and hoist works it is the general practice to specify the quantity of work
terms of number of sets of embedded parts / gates. The requirement of machinery and wor
force for cutting, bending, fabrication, erection, painting etc., is assessed to commensurate wit the task involved. The data for gates and E.M. Parts is arrived per Ton quantity.
The data for Hoists and Gantry Gantry Cranes is worked out on the basis of capacity in tonnag
4) The lead and lift charges provided in PART-I (B) are generally applicable and common to
Departments. Any item is not covered in this part, the rates as provided in the data of th relevant works may be adopted in preparation of estimates.
5) The basic material inputs needed for all works are listed and incorporated in the data. Th
requirements are analyzed and the specifications adopted shall confirm to Standards published b the BIS.
The labour and material rates will be communicated by the Board of Chief engineers.
Unless otherwise specified, all material rates shall be inclusive of all taxes, duties, levie royalty/seigniorage, transportation and handling costs up to project area.
For sand, gravel , murum, murum, stones , course aggregates aggregates etc, the rates are to be fixed f
delivery at Quarry, adding seigniorage ( royality) charges, loading charges by machinery manual means and idle hire charges of machinery machinery
(as per table under chapter
conveyance or lead and lift charges”), as applicable.
For earth/ soil for embankment works from borrow areas, which is not included in th
material list of schedule of rates, seigniorage charges are to be added separately
applicable. Master your semester with Scribd Read Free For 30 Days Sign up to vote this title For steel, Cement, AC sheets, GI sheets, Hume pipes, wood andon stone slabs, the rates ar & The New York Times Useful Not useful to be taken prevailing at major commercial centre near project area. The lead charges,
Special offer for students: Only $4.99/month.
applicable are to be added in preparing estimates.
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
However, If more than one area allowances, such as those for (1) Municipalities (
Agency / Tribal areas (3) Industrial areas are applicable for a particular situation, only th maximum out of the allowable percentages is to be allowed.
7) HIRE CHARGES OF MACHINERY: MACHINERY:
The machinery and /or group of machinery for items of works and their output has bee
worked based on the availability of machinery generally in the market and working in the t
field successfully, duly considering cycle time, idle time, operator efficiency, type of work etc
The hire charge of a machinery / equipment is worked out based on the guidelin published by CWC and BIS codes.
For the other machinery not covered by the list, the R&B and other users may adopt hi charges as recommended by the MORTH.
8) Lead Charges
The high level committee has recommended to adopt, for conveyance by head load,
minimum lead of 50 meters and additional lead up to 150 meters in the intervals of 5 meters. Beyond 150 meters lead ,only machinery rates are to be adopted.
The basic item rates provided in the schedule of rates include 50 m or 1 km as initial le
and no lead charges shall be allowed where the source of material is within the initi
lead specified in item rate. Additional lead charges shall be allowed for the le exceeding initial lead specified in the item rate.
The lead charges per unit quantity for conveyance of the materials are worked out,an included in the schedule of rates in increment of 50 m for head load and in increment 1 km for mechanical mode.
The rates for lead charges by head load upto 150 meters and by machinery up to 5 k Master your semester with Scribd Read Free Foron 30 Days Sign to vote this title shall be cumulative and inclusive of lead charges forup preceding lead. For lead beyond & The New York Times Useful Not useful km the lead charges shall be worked out on per km basis.
Special offer for students: Only $4.99/month. 9) Loading and Unloading charges for Materials
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
The data includes initial lift charges of 3 meters ,for materials conveyance by head loa
Additional leads in the interval of 1.0 meters are worked out, as additional labour inp and incorporated in the chapter on” Lead and lifts” .
Where the conveyance / lifting of material is done by mechanical means, lift charges sha not be considered, as the cycle ti me of operation of the machine includes li fts involved.
The data and rates for for lift charges is cumulative and are inclusive of rates for precedi lifts also.
11) Wastage of Materials
Cement : No wastage allowance is recommended towards the quantity of ceme
used in works, as the wastage is already included in the input and in major wor bulk quantities are used.
steel : The wastage of steel @ 2.5% is allowed for gates and allied structures. F RCC works the wastage is @2.5% for the reinforcement rods above 36mm did
@ 5% for rods below 36mm dia. including overlaps, if they are not welded. If weldi
is adopted for the reinforcement rods even for below 36mm dia, 2.5% of wastage only recommended.
12) Provision for rate for water:-
The Committee has recommended not considering the water charges in the Irrigatio Project works. But, it may be considered in specific cases as per the site conditions.
13)
In respect of RCC works the rate for cement concrete for 1 cum is worked separately f
all grades based on Indian Standards. The rate for ton is calculated separately and to be adde separately in the estimates of RCC works as a separate item.
Master your Departments semester with Scribd and data is worked out accordingly. & The New York Times 1. All soils
14) Soil classification : The Committee recommended to allow uniform classification of soils for a Read Free Foron 30this Days Sign up to vote title
2. Marshy soil Special offer for students: Only $4.99/month.
3. ordinary rock ( not requiring blasting),
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
High Level Committee has recommended to add 14% plus 4% towards VAT or
applicable on item rate towards overheads labour including importation and amenities contractor profits, which inclu des various items recommended in MORTH.
This also includes 4% of VAT and should be exhibited separately. In th
agreements, it should be mentioned that it will be reimbursed as per actuals.
provisions allowed in Go Ms. No. 94, I & CAD, Dt. 1-7-03, need not be added separately.
The overhead charges include the following elements:
Site accommodation, setting up plant, access road, water supply, electricity and gener site arrangements.
Office furniture, equipment and communications
Expenditure on:
Corporate office of contractor
site supervision
Documentation and “as built” drawings
Mobilisation/ de-mobilisation of resources
Labour camps with minimum amenities and transportation to work sites.
Light vehicles for site supervision including administrative and managerial requirement
Laboratory equipment and quality control including field and laboratory testing.
Minor T & P and survey instruments and setting outworks, including verification of lin dimensions, trial pits and bore holes, where r equired.
Watch and ward
Traffic management during construction
Expenditure on safeguarding environment
Sundries
Financing Expenditure Master your semester with Scribd Sales/ Turn overtax & The New York Times
Work Insurance/ compensation Special offer for students: Only $4.99/month. 17) EXCISE DUTY ON SUPPLIES :
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
For the purpose of computation of excise duty to be included in the rate analysis th
machinery and labour components may apportioned at 75 % for central fabrication ya
and 25 % for field erection and commissioning. Therefore, 75 % of the machinery an
labour components may be considered for assessing the extent of excise duty to b added in the rate analysis.
18) DEWATERING & DESILTING:
The High level committee considering the local conditions of rainfall / seepage h
recommended towards de-watering and de-silting at 3 percent percent on the relevant wo component for which dewatering is required.
It is also proposed as per CWC guidelines; to keep a condition in the agreements shall b
incorporated, to fix a ceiling of 5% in extreme cases, with the specific approval of chi engineer/Government.
19) Computerization of Data:
A software program is developed by the SPI Unit(Irrigation), which facilitates automat
changes and generation of unit rates, based on basic input rates of Labour, materials materials and capi cost of machinery.
A soft ware tool is also developed for auto preparation of estimates based on in pu
quantities.
Other Departments are also advised to d evelop such program.
20) For each chapter separate additional details are incorporated for clarity. USER GUIDELINES OF REVISED STANDARD DATA
Master your i)semester with Scribd Please select the item of work, as given in Index Code, view the relevant Read Free For 30 Days Signand up to vote on this title data. & The New York Useful Not useful(without involv ii) TheTimes common data items like, lead, lift, conveyance and manual excavation Cancel anytime.
Special offer for students: Only $4.99/month. contracting agencies) is applicable to all Departments (volume-1)
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA – USER GUIDE
ROLE OF CENTRAL COMPETENT COMPETENT AGENCY FOR SCHEDULE OF RATES ( BOARD OF CHIEF ENGINEERS)
a) The Board Of Chief Engineers under the chairman ship of Engineer-in-chie (administration) I&CAD Department is the competent competent authority to finalise and recommend the Schedule Schedule Rates applicable for all engineering engineering Departments. The board has to assess and incorporate only the thr basic inputs required to generate unit work work item rates as below.
Basic rates of labour : Wages of labour commonly required in execution of works has to be arrived and incorporated in th schedule of rates ( Basic Input Of Labour Wages), without adding extra towards area allowances ( li municipality allowance, tribal area and ghat road allowances etc, which which shall be added to the rates whe applicable in the form of separate separate percentage as explained in the preceeding preceeding paras. The rates shall be t prevailing daily rates in the State and shall not be less than the minimum wages fixed by th t Government from time to time. Materials rates:
The basic input material rates common to all departmental works are listed out an incorporated (in the chapter “Basic “Basic inputs”) inputs”) The material specifications specifications adopted shall shall confirm confirm Standards published by the BIS The Prevailing market rates for all basic input materials shall be obtaine from the major commercial centers near the project areas. Average of the rates, ignoring freak rates, sh be reckoned as the prevailing market rate. Unless otherwise specified, specified, all material rates shall be inclusi of all taxes, duties, duties, levies, royalty, transportation and handling costs up to project area. For sand, grav murrum, stones , aggregates etc, the rates are For delivery at Quarry Quarry including seigniorage, loadi charges and idle hire charges. For steel, Cement, AC sheets, sheets, GI sheets, Hume pipes, wood and stone slab the rates prevailing at major commercial centre near project area has to be adopted.
Use rate of machinery: The third parameter for incorporation in the Basic Inputs, is the use rate of machinery. To arrive at the use rate of machinery, the inputs to be incorporated are The list and capital cost of machinery required required to be used in the construction activity, The ra has to be obtained from major manufacturers and outlet sources and the rate shall be the current mark price inclusive of all taxes, duties and freight charges. The prevailing fuel charges of petrol and diesel are ascertained and average rate adopted Borrow rate of interest as fixed by the Government/competent authority be indicated. For the other machinery not covered by the list, the R&B and other users may may adopt h charges as recommended by the MORTH Read Free Foron 30this Days Sign up to vote title
Master your semester with Scribd & The New York Times Useful Not useful b) The Chairman, Board of Chief Engineers or competent authority Special offer for students: Only $4.99/month.
Cancel anytime.
appointed by the Government, Government, based on the approved approved basic inputs, inputs, load the above three ba parameters in the software program. The unit rate of all works including hire charges of all machinery w
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
STANDARD DATA BOOK
MORTH AP Revised StandardDataBook Standard Data
Search document
– BUILDING
WORK ITEMS
– BASIC
APPRO
Basic approach and General conditions and assumptions for the preparation of Standard Book for Building Works.
The Basic approach for the preparation of Standard Data for Building works is indicated as under
1. Description of Items: The description of items is given briefly and linked with the rele specifications in AP Standard Specifications.
2. Use of Machinery: For concrete work mixing is proposed with machinery as we
manually. For laying concrete, lifting is proposed with either by winches or machi Manual means have been proposed for all other items.
3. Working Conditions: The inputs for the Data have been analyzed for the average wo conditions prevailing in the state. 4. Over Heads : This is assumed to include interalia the following elements: i.
Site accommodation, setting up plant, access road, water supply, electricity and gen site arrangements
ii.
Office furniture, equipment and communications
iii. Provision towards expenditure on: (a) Corporate office of contractor (b) Site supervision (c) Documentation and "as built" drawings
Master your semester with Scribd iv. Mobilisation / de-mobilisation of resources . & The New York Times
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Special offer for students:v.Only $4.99/month. Labour camps with minimum amenities required as per labour laws and transporta
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
STANDARD DATA BOOK
MORTH AP Revised StandardDataBook Standard Data
Search document
– BUILDING
WORK ITEMS
– BASIC
APPRO
ix. Watch and ward x.
Arraignment for Traffic and Traffic Management during construction.
xi. Provision towards safeguarding environment xii. Sundries xiii. Financing expenditure of the Contractor xiv. Work Insurance / compensation.
4.1 Sales/Turnover Tax / VAT: Allow 4% and which should be exhibited separatel agreements it should be mentioned that it wil l be reimbursed as per actuals.
5. Contractor’s Profit : It is considered to allow 14% towards over head charges (Item 4) Contractor Profits put together. 6. General :
a) The AP Standard Specifications shall be followed with relevant BIS Specification various materials and construction work.
b) The sources of all materials and samples of materials are required to be approved b Engineer-in- Charge before starting of the work. c)
For reinforced steel both HYSD and TMT bars continuing to IS 1786 and MS bars up mm dia as per IS 432 – Part 1 have been considered.
d) The Data includes inputs for testing of soil, materials and works. e) The contractor shall arrange and to provide and maintain an adequate equipped Read Free Foron 30this Days Sign up to vote title
Master your semester with Scribd laboratory. & The New York Times
Useful Not useful Cancel anytime. f) Quality Control of Works shall be governed by relevant AP Standard Specifications Special offer for students: Only $4.99/month.
with BIS Specifications.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
STANDARD DATA BOOK
MORTH AP Revised StandardDataBook Standard Data
Search document
– BUILDING
WORK ITEMS
– BASIC
APPRO
7. Basic Inputs :
Standard Data Book is based on the requirements of basic inputs of materials, labour
machineries machineries for various items. items . The rates for labour, material and usage charges charges of mach
for the area where the project is located are to be ascertained from local authorities/enqu
to prepare Schedule of Rates for the area. The basic rates of materials, such as, s
boulders, stone for masonry, stone ballast, stone dust, moorum, gravel, lime, man sludge, quarry sweep, kankar, bricks, brick ballast, crushed slag, etc. at quarry / crusher shall be fixed by the Board of Chief Engineers yearly (effective from 1
st
June to 31
However, the basic rate of materials hand broken / machine broken, crushed aggreg
shall be based on Analysis in Chapter 1 of Roads & Bridges. The cost of materials sh
include the cost at source and the cost of their carriage (as per Schedule of rates arriv Chapter 1 of Roads & Bridges for conveyance, loading and unloading charges) upto the site. 8. Labour
The labour wages should be as per rates fixed by the Board of Chief Engineers keeping
minimum wages fixed as per Minimum Wages Act. Skilled labour include mason, carpe blacksmith, mechanics and other trades. 9. Materials :
Quantities of materials considered in the rate analysis are approximate for the purpo
estimation and include normal wastages. Actual consumption would depend on mix desig The rates of material should include basic cost at locations of stone crushers/factory/rail
Master your and semester with Scribd cost of its carriage to the site of work/plant including unloading and stac Read Free Foron 30this Days Sign up toloading, vote title & The New York Times Useful Not useful Credit for Dismantled Material: The dismantled materials should be examined and a rea Cancel anytime.
Special offer for students: Only $4.99/month. assessment made for credit for such materials, which can be utilized for works or auctio
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
STANDARD DATA BOOK
MORTH AP Revised StandardDataBook Standard Data
Search document
– BUILDING
WORK ITEMS
– BASIC
APPRO
11. Concrete Items : For Concrete Work, the Grades of Concrete covered by Data Book is in accordance to IS
2000. The nominal mix of concrete shall be used upto M 20 Grade only. For RCC Work, M Grade nominal mix may be used in exceptional cases of Remoteness. The design mix invariably used for M 20 and above Grades of Concrete as per IS 456 : 2000. The
accounts for inputs of Material by Weight and use of ordinary mixture or ordinary mixer
weight batch arrangement. The Hire charges for vibrators are included in overhead cha 10% extra cement may be provided for concreting under water, where ever required. requirement of cement concrete work is r equired to be provided separately.
12. Plants and Equipment : The usage charges for machines include ownership charges, co
repair and maintenance including replacement of tyres and running and operating cha
which includes crew, fuel and lubricants. The hire charges shall be worked out based on Guidelines issued CWC for machinery covered in CWC Guidelines. 13. Measurement and Rates
Measurement of various items and their units shall be as defined in the respective Cla
of AP Standard Specifications. The rates for various items of work shall include all sub i defined in the respective Clauses of AP Standard Specifications. 14. Privileged Document
The Standard Data Book is for Department use only. It should not be produced in any cou law as reference/ authority and to that extent it is a privileged document.
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Andhra Pradesh Standard Data BUILDINGS Index-code
BLD-CSTN1 BLD-CSTN1-1
BLD-CSTN1-2
BLD-CSTN1-3
Sl No 1
Description
Unit
Quantity
2
3
4
kg. cum cum
1440.00 1.05 1.05
Rate Rs. 5
Amoun Rs. 6
MORTARS 1
Cement Mortar (1 : 1)
2
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 1.5)
3
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 2)
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand Special offer for students: Only $4.99/month. B. MACHINERY
Master your semester with Scribd & The New York Times
day
0.20
kg. cum cum
960.00 1.05 1.05
day
0.20
kg. Read Free For720.00 30this Days Sign up to vote on title
cum 1.05 Not useful Cancel anytime. cum
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN1-5
BLD-CSTN1-6
BLD-CSTN1-7
5
Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 4)
6
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 5)
7
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Cement Mortar (1 : 6)
Unit : 1cum A. MATERIALS: Cement Sand (including 5% wastage) Seigniorage charges for sand B. MACHINERY - Nil C. LABOUR: Man mazdoor for mixing mortar Grand Total Special offer for students: Only $4.99/month. BLD-CSTN8 Cement Mortar (1 : 8)
Master your semester with Scribd & The New York Times
– BUILDING
day
0.20
kg. cum cum
360.00 1.05 1.05
-
-
day
0.20
kg. cum cum
288.00 1.05 1.05
WORK I
day
0.20
kg. cum cum
240.00 1.05 1.05
-
Read Free Foron 30this Days Sign up to vote title
day Useful
0.20useful Not Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN2
BLD-CSTN2-1
– BUILDING
WORK I
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). 9
Ordinary Soil-Manual Means-Upto 3 m depth Unit = cum Taking output = 10 cum a) Labour Mate
day
-
Mazdoor (Unskilled)
day
3.64
b&c) Overheads & Contractors Profit Cost for 10 cum = a +b+c Rate per cum = (a+b+c)/10 Note : 1. Cost of dewatering may be added, where required, up to 5 per cent o labour cost. Assessment for dewatering shall be made as per site site conditions. BLD-CSTN2-2
10
Ordinary soils-Mechcanical Means-Upto 3 m depth Unit = cum Taking output = 240 cum a) Labour Mate
day
-
Mazdoor (Unskilled)
day
8.32
hour
6.00
b) Machinery Hydraulic Excavator 1 cum bucket capacity c&d) Overheads & Contractors Profit
Cost for 240 cum = a +b+c+d Master your semester with Scribd Rate per cum = (a+b+c+d)/240 Read Free Foron 30this Days Sign up to vote title Note : 1. Cost of dewatering upto 5% of a+b be added, where & The New York Times Useful usefulrequired, up to may Not
Cancel anytime. 10 per cent of labour cost. Assessment for dewatering shall be made as per site shall conditions.
Special offer for students: Only $4.99/month.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Rate per cum = (a+b+c+d)/210
Note : Cost of dewatering upto 5 per cent cent of (a+b) may be added, where requir Assessment for dewatering shall be made as per site conditi ons. BLD-CSTN2-4
12
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth Unit = cum Taking output = 10 cum a) Labour Mate
day
-
Mazdoor (Unskilled)
day
5.20
b&c) Overheads & Contractors Profit Cost for 10 cum = a +b+c Rate per cum = (a+b+c)/10
Note : Cost of dewatering upto 5 per cent of labour cost may be added, where required as per site condition. BLD-CSTN2-5
13
Ordinary rock (not requiring requiring blasting)Mechanical Means-Upto 3 m depth Unit = cum Taking output = 180 cum a) Labour Mate
day
-
Mazdoor (Unskilled)
day
6.24
hour
6.00
b) Machinery Hydraulic Excavator 1 cum bucket capacity c&d) Overheads & Contractors Profit Cost for 180 cum = a +b+c+d Rate per cum = (a+b+c+d)/180
Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per cent of labour cost. Assessment for dewatering shall shall be made as per site conditions.
Master your semester with Scribd & The New York Times
Read Free Foron 30this Days Sign up to vote title
BLD-CSTN14 Hard rock (requiring blasting)-Upto 3 m Special offer for students: Only $4.99/month. 2-6
depth
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Gelatin 80%
– BUILDING
kg
3.50
Nos.
14.00
Mate
day
-
Mazdoor (Unskilled)
day
5.20
hour
6.00
Detonator electric
WORK I
d&e) Overheads & Contractors Profit Cost for 10 cum = a +b+c+d+e Rate per cum = a+b+c+d+e)/10 Note : 1. Cost of dewatering @ 5 per cent of (a+b) may be added, where required as per site condition. BLD-CSTN2-7
15
Hard rock (blasting prohibited)-Upto 3 m depth Unit = cum Taking output = 10 cum a) Labour
b) Machinery Air compressor 210 cfm / 250 cfm with 2 jack hammers of pneumatic breaker at 1 cum per hour c) & d) Overheads & Contractors Profit Cost for 10 cum = a+b+c+d Rate per cum = a+b+c+d)/10 Note : Cost of dewatering up to 5 per cent of (a+b) may be added, where required as per site conditions. Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire Read Free Foron 30this Days Sign up to vote title charges of T & P etc., complete for finished Useful Not useful item of work. (APSS NO. 309 & 310) Cancel anytime.
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month. BLD-CSTN-
16
Sand filling
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Taking output = 6 cum a) Labour Mate
day
-
Mazdoor (Unskilled)
day
3.12
b) & c) Overheads & Contractors Profit Cost for 6 cum = a+b+c Rate per cum = (a+b+c)/6
Note : Cost of transportation of good quality earth earth has not been included. Only labour for carrying carted earth with a lead of 50 m to the foundation pits has been taken in the rate. The cost of carted earth/ sand may be worked out separately if the same is not available from the adjoining area. BLD-CSTN3 BLD-CSTN3-1
CONCRETE, DAMP REINFORCEMENT 18
PROOF
COURSE
&
Plain Cement concrete Grade M20 - Nominal Mix using 20mm metal with hand mixing Unit : 1cum A. MATERIALS: Cement Coarse aggregate 20mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A B. LABOUR: st Mason 1 class
Kg cum cum cum cum
400.00 0.90 0.45 0.90 0.45
day
0.10
Mazdoor (unskilled) day Water (including for curing) kl Grand Total Note : For Nominal Mix : Considering table 9 IS 456 : 2000, the quantity of cement needed is 405 kgs / cum. Hence proposed 400 kgs of cement for cum of CC M20 BLD-CSTN3-2
19
2.36 1.20
Plain Cement concrete Grade M10 - Nominal Mix upto Plinth level
Master your semester with Scribd using 40mm metal using concrete mixer Unit : 1cum & The New York Times A. MATERIALS: Special offer for students: Only $4.99/month.
Cement
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful Kg
220.00
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN3-3
BLD-CSTN3-4
20
21
22
– BUILDING
WORK I
PCC Grade M15 - Nominal mix 1:2.5:5 (Hand mixing) Unit = 1cum A) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate Water (including for curing) B) Labour Mason (1st Class) Mazdoor (Unskilled) Grand Total Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. LABOUR: st Mason 1 class
BLD-CSTN3-5
Mazdoor (unskilled) Grand Total Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.
Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Special offer for students: Only $4.99/month. Water (including for curing)
Master your semester with Scribd & The New York Times
kg cum cum cum cum kl
275.00 0.48 0.54 0.27 0.09 1.20
day day
0.10 2.36
kg cum cum cum cum kl
162.00 0.90 0.45 0.90 0.45 1.20
day
0.10
day
2.36
kg 162.00 cum 0.90 Read Free For 30this Days Sign up to vote on title cum 0.45 Useful Not cum 0.90useful Cancel anytime. cum 0.45 kl 1.20
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN3-7
24
cum cum cum cum kl
0.90 0.45 0.90 0.45 1.20
day
0.10
Mazdoor (unskilled) Grand Total Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level.
day
2.36
kg cum cum cum cum kl
129.60 0.90 0.45 0.90 0.45 1.20
hour
1.00
day
0.10
day
1.39
C. LABOUR: st Mason 1 class
BLD-CSTN3-8
25
– BUILDING
Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. LABOUR: st Mason 1 class
Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Mazdoor (unskilled) Grand Total Plain Cement concrete (1:6:10) using 40 mm metal with hand mixing upto Plinth level
Unit = 1cum A. MATERIALS: Cement Coarse aggregate 40 mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) Special offer for students: Only $4.99/month. B. LABOUR: st Mason 1 class
Master your semester with Scribd & The New York Times
kg 129.60 cum 0.90 cum 0.54 cum 0.90 Read Free Foron 30this Days Sign up to vote title cum 0.54 Useful Not kl anytime. 1.20useful Cancel day
0.10
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity C. LABOUR: st Mason 1 class
BLD-CSTN3-10
27
Mazdoor (unskilled) Grand Total Plain Cement concrete - Nominal Mix (1:3:6) using 40mm metal with hand mixing Unit : 1cum A. MATERIALS: Cement Coarse aggregate 40mm Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. LABOUR: st Mason 1 class
BLD-CSTN3-11
28
Mazdoor (unskilled) Grand Total Plain Cement concrete (M 20) Nominal Mix using 40mm metal using concrete mixer
– BUILDING
hour
1.00
day
0.10
day
1.39
Kg cum cum cum cum kl
220.00 0.90 0.45 0.90 0.45 1.20
day
0.10
day
2.36
Unit : 1cum A. MATERIALS: Cement Kg 330.00 Coarse aggregate 40mm graded cum 0.90 Fine aggregate (Sand) cum 0.45 Seigniorage charges for C.A cum 0.90 Seigniorage charges for F.A cum 0.45 Water (including for curing) kl 1.20 B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) hour 1.00 Read Free For 30this Days Sign up to vote on title capacity
Master your semester with Scribd & The New York Times C. LABOUR: st Special offer for students: Only $4.99/month. Mason 1 class
Mazdoor (unskilled)
Not useful Cancel anytime.
Useful
day
0.10
day
1.39
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Water (including for curing) B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity C. LABOUR: st Mason 1 class
BLD-CSTN3-13
30
Mazdoor (unskilled) Grand Total R.C.C. M-20 Nominal Mix
– BUILDING
kl
1.20
hour
1.000
day
0.100
day
1.390
WORK I
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. A
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) A. MATERIALS: 20mm HBG graded metal cum 0.900 Sand cum 0.450 Cement Kgs 400.000 B. LABOUR: 1st Class Mason day 0.133 2nd Class Mason day 0.267 Mazdoor (Both Men and Women) day 3.600 C. MACHINERY Read Free Foron 30this Days Sign up to vote title Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) hour 1.000 Not useful Useful Cancel anytime. capacity
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Vibrator hire charges
hour
1.000
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
C
31
– BUILDING
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
hour
1.000
Vibrator hire charges Water (including for curing) BASIC COST per 1 cum RCC SLABS, BEAMS A. MATERIALS: 20mm HBG graded metal Sand Cement B. LABOUR: 1st Class Mason 2nd Class Mason Mazdoor (Both Men and Women) C. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
hour kl
1.000 1.200
cum cum Kgs
0.900 0.450 400.000
day day day
0.067 0.133 2.500
hour
0.267
hour kl
0.267 1.200
Vibrator hire charges Water (including for curing) BASIC COST per 1 cum DESIGN MIX CONCRETE (WEIGH BATCH at SITE)
Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication Read Free Foron 30this Days Sign up to vote title charges for finished item of work (APSS No. 402)with minimum cement content as per IS Useful Not useful Cancel anytime. code from standard suppliers approved by Special offer for students: Only $4.99/month. the department including pumping,
Master your semester with Scribd & The New York Times
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
2nd Class Mason Mazdoor (Both Men & Women) C. MACHINERY Weigh Batcher Hire charges (Machine mixing) charges
BLD-CSTN3-15
B
Vibrator hire charges Water (including for curing) BASIC COST per 1 cum COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
– BUILDING
day day
0.267 4.600
hour
1.333
hour Kl
1.333 1.200
cum cum
0.80 0.40
day day day
0.167 0.167 5.600
hour
1.333
hour kl
1.333 1.200
WORK I
ANY GRADE OF MIX A. MATERIALS: 20mm HBG graded metal Sand B. LABOUR: 1st Class Mason 2nd Class Mason Mazdoor (Both Men & Women) C. MACHINERY Weigh Batcher Hire charges (Machine mixing) charges
BLD-CSTN3-16
C
Vibrator hire charges Water (including for curing) BASIC COST per 1 cum RCC SLABS, BEAMS
ANY GRADE OF MIX A. MATERIALS: 20mm HBG graded metal cum 0.80 Sand cum 0.40 B. LABOUR: 1st Class Mason day 0.067 2nd Class Mason day 0.133 Mazdoor (Both Men & Women) day 3.077 C. MACHINERY Read Free Foron 30this Days Weigh Batcher Hire charges (Machine mixing) hour 0.308 Sign up to vote title charges Useful Not useful
Master your semester with Scribd & The New York Times Vibrator hire charges Special offer for students: Only $4.99/month.
Water (including for curing)
Cancel anytime.
hour kl
0.308 1.200
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
hour hour
0.222 0.222
Concrete Pump
day
0.222
C. LABOUR: st Mason 1 class
day
0.056
day
0.056
day
0.917
cum cum cum cum kl
0.80 0.40 0.80 0.40 1.20
hour hour
0.444 0.444
day
0.444
day
0.111
day
0.222
day
1.556
Mason 2
class
Mazdoor (unskilled) Grand Total Note : Wherever concrete is carried out using batching plant, transit mixer, concrete pump, then Admixtures @ 0.4% of weight of cement may be added for achieving desired slump of concrete. If concentrated Admixture is proposed, only 0.04% of weight of Cement shall be used. BLD-CSTN3-18
E
– BUILDING
Batching plant at 20 cum per hour Transit mixer 4cum capacity for lead upto 1km
nd
WORK I
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS Unit : 1cum A. MATERIALS: Coarse aggregate 20mm graded Fine aggregate (Sand) Seigniorage charges for C.A Seigniorage charges for F.A Water (including for curing) B. MACHINERY Batching plant at 20 cum per hour Transit mixer 4cum capacity for lead upto 1km Concrete Pump C. LABOUR: st Mason 1 class nd
Mason 2
class
Master your semester with Scribd Grand Total BLD-CSTNF RCC SLABS, BEAMS & The New York Times 3-19 Mazdoor (unskilled)
Special offer for students: Only $4.99/month. Unit : 1cum
A. MATERIALS:
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
STANDARD DATA BOOK
Mazdoor (unskilled) day Note : Quantity of cement proposed for various design mixes is for estimating purpose only. Actual quantity of cement will be as per approved mix design. Similarly quantity for coarse and fine aggregates is for estimating purpose and the exact quantity shall be as per the mix design. Nominal mix of grades M20 is to be used with adequate supervision and quality control requirements. For Design mix concrete, allow Cement as follows (for estimate purpose only) :
BLD-CSTN3-20
32
Search document
– BUILDING
WORK I
0.433
Grade
Kgs
M 20 M 25 M 30 M 35 M 40
350 380 400 420 430
Damp proof course 40mm thick with cement concrete (1:2:4 Nominal mix), using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials, materials, including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer) Unit = 25 sqm A. MATERIALS: Cement kgs 320.00 Coarse aggregate 12mm cum 0.90 Fine aggregate (sand) cum 0.45 Seigniorage charges of coarse aggregate cum 0.90 Seigniorage charges of sand cum 0.45 0 .45 Form work L.S. B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) hour 1.00 Read Free Foron 30this Days Sign up to vote title capacity
Master your semester with Scribd & The New York Times C. LABOUR: st Special offer for students: Only $4.99/month. Mason 1 class
Not useful Cancel anytime.
Useful
day
0.1
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Cement Coarse aggregate 12mm Fine aggregate (sand) Seigniorage charges of coarse aggregate Seigniorage charges of sand Form work B. MACHINERY Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity C. LABOUR: st Mason 1 class
BLD-CSTN4-1
34
Mazdoor (unskilled) D. Grand Total for 20 sqm Rate per Sqm = D/20 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded Unit = MT (a) Material HYSD bars including 5 per cent for overlaps and wastage Binding wire (b) Labour for cutting, bending, shifting to site, tying and placing in position
35
– BUILDING
kgs cum cum cum cum L.S.
320.00 0.90 0.45 0.90 0.45 0 .45
hour
1.00
day
0.1
day
1.98
MT
1.05
kg
6.00
Blacksmith / Bar bender day 2.00 Mazdoor (Unskilled) day 6.40 Sundries on Material Rate per t = a+b+c+d Supplying, fitting and placing HYSD bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and above, where welding Read Free Foron 30this Days Sign up to vote title required to be done compulsorily.
Master your semester with Scribd & The New York Times Unit = t Special offer for students: Only $4.99/month.
(a) Material
Not useful Cancel anytime.
Useful
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN4-2
36
– BUILDING
WORK I
Rate per t = a+b+c+d Supplying, fitting and placing TMT TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded. Unit = t (a) Material TMT bars including 5 per cent for overlaps and wastage
37
t
1.05
Binding wire (b) Labour for cutting, bending, shifting to site, tying and placing in position
kg
6.00
Blacksmith / Bar bender Mazdoor (Unskilled) (c) Overheads on (a+b) (d) Contractor’s profit on (a+b+c) Rate per t = a+b+c+d Supplying, fitting and placingTMT bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and above, where welding required to be done compulsorily.
day day
2.00 6.40
t
1.025
Welding Electrodes @ 5 per joint (14 joints / ton)
each
70.000
Welding Charges (Hire charges of Welding Machine)
Hr
10.00
Unit = t (a) Material TMT bars including 2.5 per cent for wastage
Binding wire kg 6.00 (b) Labour for cutting, bending, shifting to Read Free Foron 30this Days site, tying and placing in position Sign up to vote title
Master your semester with Scribd Welder & The New York Times Blacksmith Special offer for students: Only $4.99/month.
Mazdoor (Unskilled)
2.50useful Not Cancel anytime.
day Useful
day day
2.00 6.40
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
(b) Labour for cutting, bending, shifting to site, tying and placing in position
BLD-CSTN5 BLD-CSTN5-1
Blacksmith / Bar bender Mazdoor (Unskilled) (c) Overheads on (a+b) (d) Contractor’s profit on (a+b+c) Rate per t = a+b+c+d BRICK WORK, HONEY - COMBWORK 39
Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class n
Mason 2
40
class
Mazdoor (unskilled) Grand Total Note : For Bricks 2.4 % wastage taken. Brick Masonry Masonry in CM (1:4) with Bricks traditional size 23 x 11 x 7 cms 2nd class Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
Master your semester with Scribd Mason 2 class & The New York Times Mazdoor (unskilled) nd
41
kg Nos
96.00 512.00
cum cum
0.20 0.20
day
0.24
day
0.56
day
1.89
kg Nos
72.00 512.00
cum cum
0.20 0.20
day
0.24
day
0.56
Read Free Foron 30this Days Sign up to vote title
Special offer for students: Only $4.99/month. Grand Total BLD-CSTN-
2.00 6.40
Brick Masonry in CM (1:3) with Bricks with traditional size 23 x 11 x 7 cms 2nd class Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class
BLD-CSTN5-2
day day
Brick Masonry Masonry in CM (1:5) with Bricks
useful Not Cancel anytime. day 1.89
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN5-4
42
Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class nd
Mason 2
43
– BUILDING
WORK I
Grand Total Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class
BLD-CSTN5-5
class
Mazdoor (unskilled) Grand Total Brick Masonry Masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd Class Unit = 1cum A. MATERIALS: Cement Bricks traditional size 23 x 11 x 7 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class n
Mason 2
class
kg Nos
48.00 512.00
cum cum
0.20 0.20
day
0.24
day
0.56
day
1.89
kg Nos
36.00 512.00
cum cum
0.20 0.20
day
0.24
day
0.56
Mazdoor (unskilled) day 1.89 Grand Total Note : 1. When Mortar mix is changed as CM 1:4, 1:5, 1:6 and 1:8, proportionate quantity of cement has to be substituted. No change in other data. 2. When First class Modular Bricks are used provide 570 nos bricks of size 19 x 9 x 9 cms. Brick Masonry in CM (1:3) with Modular Read Free Foron 30this Days Sign up to vote title Bricks 19 x 9 x 9 cms 2nd class
Master your semester with Scribd BLD-CSTN44 5-6 & The New York Times Unit = 1cum Special offer for students: Only $4.99/month. A. MATERIALS: Cement
Not useful Cancel anytime.
Useful kg
100.60
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
kg Nos
75.60 520.00
Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
cum cum
0.21 0.21
day
0.24
day
0.56
day
1.89
kg Nos
60.48 520.00
cum cum
0.21 0.21
day
0.24
day
0.56
day
1.89
kg Nos
50.40 520.00
cum cum
0.21 0.21
Mason 2
BLD-CSTN5-8
46
class
Mazdoor (unskilled) Grand Total Brick Masonry in CM (1:5) with Modular Bricks 19 x 9 x 9 cms 2nd class Unit = 1cum A. MATERIALS: Cement Bricks modular size 19 x 9 x 9 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class nd
Mason 2
BLD-CSTN5-9
47
– BUILDING
Cement Bricks modular size 19 x 9 x 9 cms 2nd class
n
class
Mazdoor (unskilled) Grand Total Brick Masonry in CM (1:6) with Modular Bricks 19 x 9 x 9 cms 2nd class Unit = 1cum A. MATERIALS: Cement Bricks modular size 19 x 9 x 9 cms 2nd class Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
Master your semester with Scribd Mason 2 class & The New York Times nd
Mazdoor (unskilled) Special offer for students: Only $4.99/month. Grand Total
day 0.24 Read Free Foron 30this Days Sign up to vote title
day Useful
0.56useful Not Cancel anytime.
day
1.89
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN5-11
49
– BUILDING
WORK I
Grand Total 11.5 cm wide Brick masonry masonry for superstructure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials. unit:10sqm A. MATERIALS: Country bricks, second class traditional size 23x11x7cm
nos
565.000
Cement Sand Seigniorage charges for sand B. LABOUR: st Mason 1 class
kg. cum cum
106.000 0.220 0.220
day
0.600
day
0.600
nd
Mason 2
BLD-CSTN5-12
50
class
Mazdoor (unskilled) day 2.750 Add water charges 1% 1.00% Grand Total Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished Read Free Foron 30this Days Sign up to vote title item of work as per SS 509
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month. Ground Floor :
A. MATERIALS:
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN5-13
51
Cement Sand Seigniorage charges for sand B. LABOUR: st Mason 1 class nd
Mason 2
class
Mazdoor (unskilled) Add water charges 1% Grand Total Note : Compressive strength of individual 2 Brick shall not be less than 70 kg / cm 52
– BUILDING
WORK I
Exposed brick masonry for super structure on ground floor in cm (1:6) using wire cut bricks or moulded bricks including making horizontal and vertical grooves 10mm Wide 12mm deep, cost of all materials, seigniorage charges, labour and all operations, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials unit:1cum A. MATERIALS: Wire cut bricks or moulded bricks size 19x9x9cm
BLD-CSTN5-14
nos
520.000
kg. cum cum
48.00 0.20 0.20
day
0.57
day
0.57
day
2.54 1.00%
Nos.
525.00
cum
0.24
Brickwork in arches in cement mortar 1:4 complete including centering and shuttering excluding pointing and plastering as per drawing and technical specifications Clauses 606 and 1205.1 MORD Unit = cum a) Material Wire cut bricks or moulded bricks size 19x9x9cm
Cement mortar (1:4) Master your semester with Scribd b) Labour Mazdoor (Unskilled) & The New York Times Mason (1st Class)
Special offer for students: Only $4.99/month.
Read Free Foron 30this Days Sign up to vote title
c) Add for centering and shuttering @ 110% of (a+b)
day 1.88 Not useful Cancel anytime. day 2.00
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN5-16
BLD-CSTN5-17
54
55
a) Material Brick 2nd class 23 x 11 x 7 Cement mortar (1:5) b) Labour Mazdoor (Unskilled) Mason (1st Class) Mason (2nd Class) White Washing 2 Coats Grand Total Honey Comb work with Bricks of Modular Size and Plastered One Coat 10 mm. thick Cement Mortar 1:5 including White Washing 2 Coats Unit = cum a) Material Brick 2nd class 19 x 9 x 9 Cement mortar (1:5) b) Labour Mazdoor (Unskilled) Mason (1st Class) Mason (2nd Class) White Washing 2 Coats Grand Total Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
– BUILDING
Nos. cum
750.00 0.67
day day day LS
6.60 2.41 6.21 LS
Nos. cum
790.00 0.67
day day day LS
6.60 2.41 6.21 LS
Ground Floor Unit = 1 cum Read Free Foron 30this Days A. MATERIALS: Sign up to vote title No of blocks required for one cum of Useful Nos 110.000 Not useful Cancel anytime. Masonry
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Cost of Cement Mortar (1:6)
cum
0.100
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
cum
0.89
Bond Stones Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
cum cum cum
0.16 0.16 0.16
day
1.05
day
2.45
n
class
Man mazdoor day Woman mazdoor day Grand Total Note : When Mortar mix is changed as CM 1:3, 1:4, 1:5, 1:6 and 1:8, proportionate quantity of cement has to be substituted. No change in other data. BLD-CSTN6-2
57
58
WORK I
3.50 2.80
CRS Masonry in CM (1:2) 1st Sort Unit = 1cum A. MATERIALS: Cement Coursed Rubble Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
BLD-CSTN6-3
– BUILDING
Cut Stone Roughly dressed to shape at quarry
Mason 2
kg cum 7Nos.
201.60 0.94 0.16
Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: st Mason 1 class
cum cum cum
0.28 0.28 1.10
day
2.50
Mazdoor (unskilled) Grand Total CRS Masonry in CM (1:3) 1st Sort
day
2.32
Unit = 1cum A. MATERIALS: Cement kg 134.40 Coursed Rubble Stone cum 0.94 Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 7Nos. 0.16 Read Free Foron 30this Days Sign up to vote title 0.16cum
Master your semester with Scribd & The New York Times Fine aggregate (Sand) Special offer for students: Only $4.99/month. Seigniorage charges for F.A
Seigniorage charges for Stone
Not 0.28useful Cancel anytime.
Useful cum
cum cum
0.28 1.10
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN6-5
60
BLD-CSTN6-6
61
– BUILDING
Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: st Mason 1 class
cum cum
0.28 1.10
day
2.50
Mazdoor (unskilled) Grand Total CRS Masonry in CM (1:6) 1st Sort
day
2.32
kg cum 7Nos.
67.20 0.94 0.16
Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: st Mason 1 class
cum cum cum
0.28 0.28 1.10
day
2.50
Mazdoor (unskilled) Grand Total CRS Masonry in CM (1:6) 2nd Sort
day
2.32
kg cum cum
76.80 0.94 0.16
cum cum cum
0.32 0.32 1.10
day
1.50
Unit = 1cum A. MATERIALS: Cement Coursed Rubble Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Unit = 1cum A. MATERIALS: Cement Coursed Rubble Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: st Mason 1 class
Master your semester with Scribd Mazdoor (unskilled) day 2.32 Read Free Foron 30this Days Sign up to vote title Grand Total & The New York Times Useful Not useful Note : When Mortar mix is changed proportionate Cancel anytime.
Special offer for students: Only $4.99/month. quantity of cement has to be substituted. No change in other data.
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Mazdoor (Unskilled) C. Add for centering and shuttering @ 100 % of (a+b)
day
– BUILDING
WORK I
2.43
Grand Total Note : 1) In case cement mortar 1:3 is used, proportionate rate is to be adopted. 2) The addition for centering and sluttering at (c) above is for arch above 6 m span. For lesser span length the addition shall be 80 per cent for span above 4 m length and 50 per cent for spans less than 4 m. BLD-CSTN6-8
63
Ashlar Arch Work in Cement Mortar (1:4) Unit = 1cum A. MATERIALS: Cement Cut Stone Roughly dressed to shape at quarry Bond Stones of Cutstone quality Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class nd
Mason 2
BLD-CSTN6-9
64
class
Mazdoor (unskilled) Centering Charges Grand Total Rubble Arch Work in Cement Mortar (1:4) Unit = 1cum A. MATERIALS: Cement Seleted Stone of sizes as per specification (including Bond Stones)
Fine aggregate Master your semester with(Sand) Scribd Seigniorage charges for F.A & The New York Times B. LABOUR: st
Mason 1 class Special offer for students: Only $4.99/month. nd
Mason 2
class
kg cum
57.60 0.89
cum cum
0.16 0.16 0.16
day
5.05
day
2.45
day LS
6.30
kg cum
100.80 1.15
cum
0.28
Read Free Foron 30this Days Sign up to vote title cum 0.28
Not useful Cancel anytime.
Useful
day
0.90
day
2.10
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Coarse sand 20 mm aggregate 10 mm aggregate b) Labour Mason (1st Class) Mazdoor (Unskilled) c) Machinery Concrete mixer 0.4/0.28 cum capacity d) Add for cost of centering and shuttering as per the rates worked out on relevant data items
– BUILDING
cum cum cum
0.45 0.54 0.36
day day
0.20 2.15
hour
0.40
t cum cum cum
0.38 0.45 0.54 0.36
day day
0.20 2.15
hour
0.40
WORK I
Grand Total BLD-CSTN6-11
66
RCC Grade M 25 (Design mix) a) Material Cement Coarse sand 20 mm aggregate 10 mm aggregate b) Labour Mason (1st Class) Mazdoor (Unskilled) c) Machinery Concrete mixer 0.4/0.28 cum capacity d) Add for cost of centering and shuttering as per the rates worked out on relevant data items
Grand Total Note : The additional cost of centering and shuttering @ 50 per cent of cost of material and labour shall hold good for arch spans of 6 m and above. For lesser length of spans, the corresponding additional cost can be taken as 40 per cent for spans above 4 m length and 30 per cent for spans less than 4 m. BLD-CSTN67 RR Masonry in CM (1:6) Master your semester with Scribd 6-12 Unit = 1cum & The New York Times A. MATERIALS:
Special offer for students: Only $4.99/month.
Cement
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful kg
79.20
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
A. MATERIALS: Cement CR Stone Rough Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum Fine aggregate (Sand) Seigniorage charges for F.A Seigniorage charges for Stone B. LABOUR: st Mason 1 class
BLD-CSTN6-14
69
59.40 0.44 0.50 0.16
cum cum cum
0.33 0.33 1.10
day
1.20
Seigniorage charges for Stone B. LABOUR: st Mason 1 class nd
Mason 2
70
WORK I
2.00
Dry Stone Masonry for Retaining Walls Unit = 1cum A. MATERIALS: Rough Stone Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
BLD-CSTN6-15
– BUILDING
kg cum cum cum
Mazdoor (unskilled) day Grand Total Note : When Mortar mix is changed proportionate quantity of cement has to be substituted. No change in other data
class
Mazdoor (unskilled) Grand Total Dry Stone Masonry for Well steining
Unit = 1cum A. MATERIALS: Rough Stone Bond Stones Seigniorage charges for Stone B. LABOUR: st Special offer for students: Only $4.99/month. Mason 1 class
Master your semester with Scribd & The New York Times nd
cum cum
1.04 0.16
cum
1.20
day
0.33
day
0.77
day
1.10
cum 1.04 cum 0.16 Read Free Foron 30this Days Sign up to vote title cum 1.20
Not useful Cancel anytime.
Useful
day
0.45
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
nd
Mason 2
BLD-CSTN7 BLD-CSTN7-1
class
Mazdoor (unskilled) Grand Total POINTING 72
73
Mazdoor (unskilled) Grand Total Flush Pointing with CM (1:3) to RR Masonry Unit = 10 sqm A. MATERIALS: Cement Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: nd Mason 2 class
BLD-CSTN7-3
74
Mazdoor (unskilled) Grand Total Raised Pointing with CM (1:3) to RR Masonry Unit = 10 sqm A. MATERIALS: Cement Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: nd Mason 2 class
Master your semester with Scribd & The New York Times Mazdoor (unskilled) 75
day
2.10
day
2.00
kg cum cum
14.40 0.03 0.03
day
0.50
day
0.74
kg cum cum
14.40 0.03 0.03
day
0.50
day
0.74
kg cum cum
28.80 0.06 0.06
Read Free Foron 30this Days Sign up to vote title
Special offer for students: Only $4.99/month. Grand Total BLD-CSTN-
– BUILDING
WORK I
Flush Pointing with CM (1:3) to Brick / CRS Masonry Unit = 10 sqm A. MATERIALS: Cement Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: n Mason 2 class
BLD-CSTN7-2
Raised and cut pointing
coursed
Ashlar
day
0.50
useful Not Cancel anytime. day 0.74
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN8 BLD-CSTN8-1
proportionate quantity of cement substituted. No change in other data. PLASTERING 76
has
77
Mazdoor (unskilled) Grand Total Plastering with CM (1:4), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:4) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
BLD-CSTN8-3
78
– BUILDING
WORK I
be
Plastering with CM (1:3), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:3) Seigniorage charges for F.A B. LABOUR: st Mason 1 class
BLD-CSTN8-2
to
Mazdoor (unskilled) Grand Total Plastering with CM (1:5), 12 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortor (1:5) Seigniorage charges for F.A B. LABOUR: st Mason 1 class Mazdoor (unskilled) Grand Total Plastering with CM (1:6), 12 mm thick
BLD-CSTN79 Master your semester with Scribd 8-4 Unit = 10 sqm & The New York Times A. MATERIALS: Special offer for students: Only $4.99/month.
Cement Mortor (1:6)
cum cum
0.15 0.15
day
0.60
day
0.96
cum cum
0.15 0.15
day
0.60
day
0.96
cum cum
0.150 0.150
day
0.60
day
0.96
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
cum
0.15
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN8-6
81
Mazdoor (unskilled) Grand Total Plastering with CM (1:4), 15 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:4) Seigniorage charges for F.A B. LABOUR: n Mason 2 class
BLD-CSTN8-7
82
Mazdoor (unskilled) Grand Total Plastering with CM (1:4), 20 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:4) Seigniorage charges for F.A B. LABOUR: nd Mason 2 class
BLD-CSTN8-8
83
Mazdoor (unskilled) Grand Total Plastering with CM (1:3), 20 mm thick Unit = 10 sqm A. MATERIALS: Cement Mortar (1:3) Seigniorage charges for F.A B. LABOUR: nd Mason 2 class
– BUILDING
day
0.96
cum cum
0.19 0.19
day
0.60
day
0.96
cum cum
0.210 0.21
day
0.94
day
1.60
cum cum
0.210 0.21
day
0.94
Mazdoor (unskilled) day Grand Total Note : When Mortar mix is changed proportionate quantity of cement has to be substituted
Unit = 10 sqm
WORK I
1.60
Master your semester with Scribd BLD-CSTN84 Plastering with CM 2 coats, 20 mm thick, Read Free Foron 30this Days Sign up to vote title 8-9 base coat in CM (1:6), 16mm thick and top & The New York Times Useful Not useful coat in CM (1:4), 4mm thick with Dubara sponze finishing. Special offer for students: Only $4.99/month.
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Note : When Mortar mix is changed proportionate quantity of cement has to be substituted BLD-CSTN8-10
85
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing. Unit = 10 sqm A. MATERIALS: Base Coat in CM(1:5), 8 mm thick Cement Fine aggregate (Sand) Top Coat in CM(1:3), 4 mm thick Cement Fine aggregate (Sand) Seigniorage charges for F.A B. LABOUR: st Mason 1 class nd
Mason 2
class
kg cum
31.70 0.11
kg cum cum
19.20 0.04 0.15
day
0.63
day
1.47
Mazdoor (unskilled) day Grand Total Note : When Mortar mix is changed proportionate quantity of cement has to be substituted BLD-CSTN8-11
86
3.90
RCM FACIA WORKS RCM facia 5cm thick in CM (1:3) for for drop walls, walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903) Unit - 10 sqm A) MATERIALS Read Free Foron 30this Days Sign up to vote title Rabbit wire mesh (1.0 M panna for 0.6 M sqm 13.30 Useful Not useful Cancel anytime. drop)
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Cement Mortar 1:3 for 25 mm thick for making
cum kg
0.25
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN8-12
87
– BUILDING
WORK I
20 mm thick rough cast exterior cement plaster on walls upto height of 10 metres above ground level consisting of 10 mm thick backing coat of 1 : 3 cement mortar (1 cement : 3 sand) and 10 mm thick finishing coat of 1 : 3 cement mortar (1 cement : 3 coarse aggregate of size 6 mm to 10 mm) including arrises, chamfers and/or rounded angles not exceeding 80 mm in girth. Details of cost for 10 sq.m Materials :Cement mortar 1:3 (1 cement: 3 sand) Cement mortar 1:3(1 cement: 3 coarse aggregate of size 6 mm to 10 mm) Cement Coarse aggregate of size 6 mm -10 mm Mazdoo (unskilled) for mixing mortar with coarse aggreagate 6 - 10 mm
cum
0.110
kg cum day
52.800 0.110 0.020
Labour for backing coat and finishing coat Plaster work :— Mason, llnd class day 1.710 Mazdoo (unskilled) day 3.270 Extra labour for scooping : — Mason, llnd class day 0.250 Mazdoor (male) day 0.250 Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m BLD-CSTN88 Rough cast exterior cement plaster on walls 8-13 upto a height of 10 metres above ground level with a mixture of sand and gravel or crushed stone graded from 6 mm to 10 mm nominal size dashed over and including fresh plaster in two coats, backing coat 10 mm cement plaster 1 : 3 (1 cemen" : 3 sand) and finishing coat 10 mm cement plaster with Read Free Foron 30this Days Sign up to vote title cement mortar 1:3 (1 cement: 3 sand) mixed Not useful with 10% finely grounded hydrated lime by Useful Cancel anytime. volume of cement including arrises, chamfers Special offer for students: Only $4.99/month. and/or rounded angles not exceeding 80 mm
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Labour for backing coat and finishing coat Plaster work :—
BLD-CSTN8-14
BLD-CSTN8-15
89
90
Mason, llnd class Mazdoo (unskilled) Add labour for dashing crushed stone Mason 1st class Mazdoo (unskilled) Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m (b) Dark coloured finish using ordinary cement and pigment Details of cost for 10 sq.m. Same rate as per (a) above item () Add cost of colour Add for water charges @ 1 % Add for contractor's profit and overheads Cost for 10 sq.m. Cost per sq.m (c) Light coloured finish using white cement and pigment Details of cost for 10 sq.m. Same rate as per (a) above item () Add cost of light colour Add for water charges on cost of colour @ 1 %
day day
1.710 3.270
day day
0.500 1.000
kg
6.000
kg
6.000
Add for contractor's profit and overheads on cost of colour and water charges Cost for 10 sq.m. Cost per sq.m BLD-CSTN91 Pebble dash exterior plaster on walls upto a 8-16 height of 10 metres above ground level with a mixture of washed pebble or crushed stone graded from 6 mm to 12 mm nominal size dashed over and including fresh cement plaster in two coats, backing coat 10 mm Read Free Foron 30this Days Sign up to vote title cement plaster 1 : 3 (1 cement : 3 sand) and Useful Not useful finishing coat 10 mm cement plaster 1 : 3 (1 Cancel anytime. Special offer for students: Only $4.99/month. cement : 3 sand) mixed with 10% finely grounded hydrated lime by volume of
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN8-17
92
Labour for pebble dashing Mason llnd class Mazdoor (unskilled) Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m Plain Cement Mortar Bands : 20 mm thick plain cement mortar bands in cement mortar 1 : 4 (1cement : 4 sand) upto 300 mm in width
– BUILDING
day day
0.500 0.610
cum
0.023
day day
0.300 0.350
cum
0.023
day day
0.300 0.350
WORK I
(a) Flush Band :Details of cost for 10 metres long and 10 cm wide band Materials :Cement mortar 1 :4 Labour :— Mason llnd class Mazdoor (unskilled) Add for water charges @ 1 % Cost for 10 metres long and 10 cm wide band
93
Cost per cm width x metre long b) Sunk band :Details of cost for 10 metres long and 10 cm wide band Materials :Cement mortar 1 :4 Labour :— Mason llnd class Mazdoor (unskilled) Add for water charges @ 1 % Cost for 10 metres long and 10 cm wide band
Cost per cm width x metre long 94 C) Raised Band :Materials :Cement mortar 1 :4 Labour :— Mason llnd class Special offer for students: Only $4.99/month. Mazdoor (unskilled)
Master your semester with Scribd & The New York Times
Read Free Foron 30this Days Sign up to vote title cum 0.023
Not useful Cancel anytime.
Useful
day day
0.380 0.430
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book Venkat Apdss printing
Save
Embed
Share
Print
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
96
97
BLD-CSTN8-19
98
Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m Sunk band :Details of cost for 10 sq.m Materials :Cement mortar 1 :4 Labour :— Mason llnd class Mazdoor (unskilled) Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m Raised band Details of cost for 10 sq.m Materials :Cement mortar 1 :4 Labour :— Mason llnd class Mazdoor (unskilled) Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m Moulded Cement Mortar Bands 15 mm 15 mm thick moulded cement mortar band in cement mortar 1 : 4 (1cement: 4 sand)
– BUILDING
cum
0.224
day day
2.500 3.000
cum
0.224
day day
3.000 3.500
WORK I
Details of cost for 10 metres long and 10 cm wide band Materials :Cement mortar 1 :4 cum 0.023 Labour :— Mason llnd class day 0.870 Mazdoor (unskilled) day 0.920 Add for water charges @ 1 % Cost for 10 metres long and 10 cm wide band Read Free Foron 30this Days Sign up to vote title Cost per cm width x metre long FLOORING Useful Not useful
Master your semester with Scribd & The New York Times BLD-CSTN9 Only $4.99/month. Special offer for students: BLD-CSTN-
99
Flooring with polished shahabad stones ...
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Polished Shabad Stone… mm thick
Cement for CM (1:8) proportion for base coat Cement for slurry Cement for jointing Sand for CM (1:8) proportion Seigniorage charges of sand B. LABOUR: st Mason 1 class n
Mason 2
BLD-CSTN9-2
class
Mazdoor (unskilled) Add water charges 1% Grand Total 100 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, . Unit = 10 sqm A. MATERIALS: Rough Cuddapah/Shabad stones (40 mm thick) (0.457 x 0.457 m) Cement for CM (1:8) proportion for base coat Cement for CM 1:3 proportion for pointing Sand for CM (1:8) proportion Sand for CM (1:3) proportion Seigniorage charges of sand B. LABOUR: st Mason 1 class
Master your semester with Scribd Mason 2 class & The New York Times Mazdoor (unskilled) nd
Special offer for students: Only $4.99/month. Add water charges 1% Grand Total
– BUILDING
sqm kg.
11.00 21.60
kg. kg. cum cum
33.00 20.00 0.12 0.12 0. 12
day
3.10
day
1.10
day
0.86
sqm
10.50
kg.
21.60
kg. cum cum cum
9.60 0.12 0.02 0.14 0 .14
day
0.960
day
2.240
Read Free Foron 30this Days Sign up to vote title
useful Not day 3.30 Cancel anytime.
Useful
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-3
101
– BUILDING
WORK I
Flooring with polished polished marble marble slab... slab... mm thick set over base coat of cement mortar (1:6) 20 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, . Unit = 10 sqm A. MATERIALS: Marble slab of size… mm….thick…. mm Cement for CM (1:8) proportion for base coat Cement for slurry for bedding White Cement for pointing Sand for CM (1:6) Seigniorage charges of sand B. Machinery Machine for rubbing of floor C. LABOUR: st Mason 1 class nd
Mason 2
class
sqm kg.
10.50 48.00
kg. kg. cum cum
33.00 5.00 0.20 0.20 0 .20
day
1.00
day
2.10
day
3.00
Mazdoor (unskilled) day 5.00 Add water charges 1% Grand Total BLD-CSTN- 102 Flooring with chequrred terrazzo tiles of 22 9-4 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency Read Free Foron 30this Days Sign up to vote title spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with Useful Not useful Cancel anytime. pigment of matching shade including cost of Special offer for students: Only $4.99/month. all materials like cement, sand water and tiles
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-5
103
cum
0.12 0 .12
day
0.960
Man mazdoor Mazdoor (unskiled) Add water charges 1% Grand Total Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, .
day day
2.240 3.30
sqm
10.50
kg.
21.60
kg. kg. cum cum cum
33.00 6.000 0.12 0.020 0.140
day
0.96
day
2.24
Cement for CM (1:8) proportion for base coat Cement for slurry Cement for Pointing with CM (1:3) Sand for CM (1:8) Sand for pointing Seigniorage charges of sand B. LABOUR st Mason 1 class Mason 2 class Master your semester with Scribd Mazdoor (unskiled) Add water charges 1% & The New York Times nd
Grand Total Special offer for students: Only $4.99/month. BLD-CSTN-
104
– BUILDING
Seigniorage charges of sand B. MACHINERY Nill C. LABOUR n Mason 2 class
Unit = 10 sqm A. MATERIALS: st Vitrified tiles of 1 quality of size
Read Free Foron 30this Days day 3.30 Sign up to vote title
Flooring with ceramic tiles, set over base coat
Not useful 1.00% Cancel anytime.
Useful
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Cement for slurry White cement Sand for CM (1:8) Seigniorage charges of sand B. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN9-7
105
class
Mazdoor (unskiled) Add water charges 1% Grand Total Flooring with high polished granite slabs ... mm thick other than black set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work,
Unit = 10 sqm A. MATERIALS: High polished granite slab other than black … mm thick Cement for CM (1:8) proportion for base coat Cement for slurry White cement for jointing & pointing Cement for jointing Sand for CM (1:8) Seigniorage charges of sand B. LABOUR st Mason 1 class
Master your semester with Scribd Mason 2 class & The New York Times Mazdoor (unskiled) nd
Special offer for students: Only $4.99/month. Add water charges 1% Grand Total
– BUILDING
kg. kg. cum cum
33.00 2.00 0.12 0.12 0 .12
day
0.96
day
2.24
day
3.30 1.00%
sqm
10.50
kg. kg. kg. kg. cum cum
36.00 33.00 6.00
day
3.00
WORK I
0.20 0.20 0 .20
Read Free Foron 30this Days Sign up to vote title day 1.00
Not 8.00useful Cancel anytime.
Useful day
1.00%
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
A. MATERIALS: Marble tiles polished 8 mm thick Cement for CM (1:8) for base coat Cement for slurry White cement for jointing & pointing Sand for CM (1:8) Seigniorage charges of sand B. LABOUR (including for polishing & rubbing) st
Mason 1 class
BLD-CSTN9-9
Mazdoor (unskiled) Add water charges 1% Grand Total 107 Flooring with granite stone tiles 8 mm thick (mirror polished of all shades) set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, .
Unit = 10 sqm A. MATERIALS: Granite stone tiles 8 mm thick (mirror polished of all shades) Cement for CM (1:6) for base coat Sand for CM (1:6) Seigniorage charges of sand B. LABOUR st Mason 1 class
Master your semester with Scribd Mason 2 class & The New York Times Mazdoor (unskiled) nd
Add water charges 1% Special offer for students: Only $4.99/month. Grand Total
– BUILDING
sqm kg. kg. kg. cum cum
10.50 36.00 33.00 5.00 0.20 0.20 0 .20
day
4.00
day
8.00 1.00%
sqm
10.50
kg. cum cum
48.00 0.20 0.20 0 .20
day
0.96
Read Free Foron 30this Days Sign up to vote title day 2.24
3.30useful Not Cancel anytime.
Useful day
1.00%
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Decorated white back ground glazed tiles Cement for CM (1:6) for base coat Cement for slurry White cement for jointing & pointing Sand for CM (1:6) Seigniorage charges of sand B. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN9-11
109
class
Mazdoor (unskiled) Add water charges 1% Grand Total Flooring with pressed clay flooring tiles, set over base coat of cement mortar mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with cement mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, Unit = 10 sqm A. MATERIALS: 20 X 20 cm pressed clay flooring tiles Cement for CM (1:8) for base coat Cement for jointing & pointing Pointing with CM (1:3) Deduct CM (1:3) Sand for CM (1:8) Seigniorage charges of sand B. LABOUR st Mason 1 class
Master your semester with Scribd & The New York Times Mason 2 class nd
Special offer for students: Only $4.99/month. Mazdoor (unskiled)
Add water charges 1%
– BUILDING
sqm kg. kg. kg. cum cum
10.50 28.80 33.00 6.00 0.12 0.12 0 .12
day
0.96
day
2.24
day
3.30 1.00%
1000 Nos
0.255
kg. kg. 10sqm cum cum cum
21.600 6.000 1.000 0.040 0.120 0.120
Read Free Foron 30this Days Sign up to vote title day 0.960
Not useful 2.240 Cancel anytime.
Useful day
day
4.30 1.00%
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Unit = 10 sqm A. MATERIALS: Plain cement Tiles 20 x 20 cms Cement for CM (1:8) for base coat Cement for jointing & pointing Pointing with CM (1:3) Deduct CM (1:3) Sand for CM (1:8) Seigniorage charges of sand B. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN9-13
111
class
– BUILDING
1000 Nos
0.255
kg. kg. 10sqm cum cum cum
21.600 6.000 1.000 0.040 0.120 0.120
day
0.960
day
2.240
Mazdoor (unskiled) day Add water charges 1% Grand Total Note : When Mortar mix is changed changed proportionate quantity of cement has to be substituted for all above Flooring Items. The same data holds good for stones with all colours. Adopt same data for polished Kadapa Stones and Bethamcherla stones. Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work,
WORK I
3.30 1.00%
Unit = 10 sqm A. MATERIALS: 6mm to 12 mm H.G. Metal (Machine cum 0.17 Read Free Foron 30this Days Sign up to vote title crushed) Not useful Useful 120.00 Cancel Cement kg anytime. Special offer for students: Only $4.99/month. Sand cum 0.085 Seigniorage charges of sand
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Cement Concrete 1:6:10 using concrete mixer Stone Chippings 3.34 mm - 10 mm Cement B. LABOUR st Mason 1 class n
Mason 2
BLD-CSTN9-15
113
class
Mazdoor (unskiled) Add water charges 1% Grand Total Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3) Unit = 10 sqm A. MATERIALS: Cement Concrete 1:6:10 using concrete mixer Plastering with CM (1:3), 12 mm thick B. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN9-16
114
class
Mazdoor (unskiled) Add water charges 1% Grand Total Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick in CM(1:3) using Red oxid, with polished surface Unit = 10 sqm A. MATERIALS: Cement Concrete 1:6:10 using concrete mixer Plastering with CM (1:3), 12 mm thick
Master your semester with Scribd Red oxid & The New York Times B. LABOUR Special offer for students: Only $4.99/month.
st
Mason 1 class
– BUILDING
cum
1.000
cum kg
0.250 120.000
day
0.150
day
0.350
day
5.40 1.00%
cum
1.00
10 sqm
1.00
day
0.150
day
0.350
day
5.40 1.00%
cum
1.00
10 1.00 sqm Read Free Foron 30this Days Sign up to vote title kg 10.00
Not useful Cancel anytime.
Useful
day
0.150
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-17
115
– BUILDING
WORK I
6 mm mm thick terrazzo flooring in situ with white, black, chocolate, gray, yellow or green superior marble chips, over 20 mm thick base coat of CM (1:3) laid over CC bed already laid or RCC roof slab, including cost of all materials like cement marble powder, marble chips, sand & water etc., complete including polishing to get high smooth finishing, seigniorage charges, etc., complete for finished item of work, Unit = 10 sqm A. MATERIALS: Marble Powder Marble Chips Cement for top layer Cement for base coat in CM (1:3) Sand for base coat Seigniorage charges of sand B. MACHINERY Polishing Charges C. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN9-18
class
kg cum kg. kg. cum cum
17.000 0.060 50.000 96.000 0.200 0.200
sqm
10.000
day
0.960
day
2.240
Mazdoor (unskiled) day 3.30 Grand Total 116 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete Read Free Foron 30this Days Sign up to vote title including seigniorage charges, etc., complete Useful Not useful for finished item of work, Cancel anytime.
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-19
117
– BUILDING
WORK I
Providing skirting to internal walls to 15 cm height/risers of steps with marble slab……..mm thickness, length equ al to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like marble slab, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, Unit = 10 sqm A. MATERIALS: Marble slab………mm thickness Sand for base coat Cement for base coat Cement for slurry White cement for jointing & pointing Flate nosing charges Machine cutting charges Seigniorage charges of sand B. LABOUR Mason Ist class Man mazdoor (Beldar) Man mazdoor (Beldar) for polishing & rubbing
sqm cum kg kg kg RM RM cum
10.50 0.12 57.60 33.00 5.00 66.67 67.67 0.12 0 .12
day day day
2.10 4.90 4.00
Woman mazdoor day 4.00 Grand Total BLD-CSTN- 118 Providing skirting to internal walls to 15 cm 9-20 height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with Read Free Foron 30this Days Sign up to vote title white cement paste mixed with pigment of Useful Not useful Cancel anytime. matching shade to full depth, including cost Special offer for students: Only $4.99/month. of all materials like tiles, cement, sand and water etc., complete including seigniorage
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-21
119
– BUILDING
Mason Ist class n Mason 2 class
day day
0.96 2.24
Mazdoor (unskilled) Add water charges 1% Grand Total Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,
day
3.30 1.00%
sqm cum kgs kgs kgs cum
10.50 0.12 57.60 33.00 5.00 0.12 0 .12
day day
2.10 0.80 4.90
Unit = 10 sqm A. MATERIALS: 8 mm thick mirror polished granite tiles Sand for cm 1:3 base coat Cement for cm 1:3 base coat Cement for slurry White cement for jointing & pointing Seigniorage charges of sand B. LABOUR Mason Ist class Mazdoor (unskiled) nd Mason 2 class
Add water charges 1% 1.00% Grand Total BLD-CSTN- 120 Providing skirting to internal walls to 15 cm 9-22 height/risers of steps with polished kadapa stone ... mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm Read Free Foron 30this Days Sign up to vote title thick with cement slurry of honey like Useful Not useful Cancel anytime. consistency spread at the rate of 3.30 kgs per Special offer for students: Only $4.99/month. sqm and jointed with white cement paste mixed with pigment of matching shade to full
Master your semester with Scribd & The New York Times
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-23
121
Mason Ist class Mason 2nd class Mazdoor (unskiled) Add water charges 1% Grand Total Providing skirting to internal walls to 15 cm height/risers of steps with ... mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, Unit = 10 sqm A. MATERIALS: 25 mm thick polished Shahabad stone (White)
– BUILDING
day day day
0.96 2.24 3.10 1.00%
sqm
11.00
Sand for cm 1:3 base coat cum Cement for cm 1:3 base coat kgs Cement for slurry kgs Seigniorage charges of sand cum B. LABOUR Mason Ist class day Mason 2nd class Mazdoor (unskiled) day Add water charges 1% Grand Total Note : a) When Mortar mix is changed proportionate quantity of cement has to be substituted for all Skirting Items.
0.96 2.24 3.10 1.00%
Cancel anytime.
c) For treads items, data for for relevant flooring Items
WORK I
0.12 57.60 33.00 0.12 0 .12
Master your semester with Scribd items, data forRead b) For dadooing or cladding items, relevant Free Foron 30this Days Sign up to vote title Skirting Items may be adopted adding the cutting & The New York Times Useful Not useful charges of the stones/ tiles as the ca se may be. Special offer for students: Only $4.99/month.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN9-25
BLD-CSTN10 BLD-CSTN10-1
123
B. LABOUR Carpenters 1st Class Carpenters 2nd Class Man mazdoor Note : Deduct 4.3 Nos Carpenters if plank rate tongued and grooved ready planned. Grand Total Flooring with Gravel 150 mm thick including cost of all materials, labour, watering etc., complete Unit = 10 sqm A. MATERIALS: Gravel (including 2% wastage) B. LABOUR Man mazdoor Woman mazdoor Grand Total ROOFING & CEILING
124
– BUILDING
day day day is for
1.95 4.55 5.40
cum
1.53
day day
1.10 0.50
kgs nos
103.09 47.91
WORK I
Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a 0 pitch of 60 ) and seigniorage charges, etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials
Unit = 184.518 sqm A. MATERIALS: G.I corrugated 0.80 mm thick sheets G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884
Master your semester with Scribd G.I bolts & nuts 20 x 6 nos Read Free Foron 30this Days Sign up to vote title nos 43.90 G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos & The New York Times Useful Not useful = 810 nos. with washers or srews, if wooden Special offer for students: Only $4.99/month. battens used.
Limpet washers (for scam & ‘J’ bolts)
Cancel anytime.
nos
91.82
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-2
125
Mazdor (coolie) Sundries including 50 x 6 mm iron wind ties white lead etc.
day LS
Add for Standard specification 1mm. Thick ridging and 1.25 mm thick sheet vallyes when such are required for a particular work. Average allowance for 10 sqm roofing.
LS
– BUILDING
WORK I
0.14
Grand Total Rate per 10 sqm = Grand Total/10 Roofing with corrugated G.I sheets 1.00mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto a 0 pitch of 60 ) and seigniorage charges, turnover tax etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials
Unit = 184.518 sqm A. MATERIALS: G.I corrugated 1.00 mm thick sheets G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884
kgs nos
126.07 47.91
G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos.
nos
43.90
Limpet washers (for scam & ‘J’ bolts) 884 + 810 = 1694
nos
91.82
nos litre litre
91.82 0.14 0.20
Bitumen washers Zinc cromate yellow paint Ready mixed paint B. LABOUR For roofing Carpenter II class Man mazdoor (beldar) For premier painting one coat Special offer for students: Only $4.99/month. Painter
Master your semester with Scribd & The New York Times
day 0.84 Read Free Foron 30this Days Sign up to vote title
Useful
day
0.91
day
0.06
Not useful Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-3
126
– BUILDING
WORK I
Roofing with corrugated G.I sheets 1.25mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets sheets complete (upto a 0 pitch of 60 ) and seigniorage charges, turnover tax etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materials
Unit = 184.518 sqm A. MATERIALS: G.I corrugated 1.25 mm thick sheets G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884
kgs nos
154.80 47.91
G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos.
nos
43.90
Limpet washers (for scam & ‘J’ bolts) + 810 = 1694
nos
91.82
884
Bitumen washers nos 91.82 Zinc cromate yellow paint litre 0.14 Ready mixed paint litre 0.20 B. LABOUR For roofing Carpenter II class day 0.84 Man mazdoor (beldar) day 0.91 For premier painting one coat Painter day 0.06 Mazdoor (coolie) day 0.06 For two coats of painting to over laps Painter day 0.14 Mazdor (coolie) day 0.14 Grand Total Rate per 10 sqm = Grand Total/10 BLD-CSTN- 127 Roofing with 6 mm thick corrugated asbestos Read Free Foron 30this Days Sign up to vote title 10-4 cement sheets, fixing with G.I ‘J’ bolts & nuts Useful Not useful Cancel anytime. 8 mm dia G.I plain washers complete Special offer for students: Only $4.99/month. including seigniorage charges etc., complete for finished item of work, but excluding the
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-5
128
Sundries including 50 x 6 mm iron wind ties white lead etc.
LS
Add for Standard specification 1mm. Thick ridging and 1.25 mm thick sheet vallyes when such are required for a particular work. Average allowance for 10 sqm roofing.
LS
– BUILDING
WORK I
Grand Total Rate per 10 sqm = Grand Total/10 Best Tiled Roofing with Pan tiles over over Flat Tiles and Lime mortar Borders including Teak Reapers. Unit = 10 sqm A. MATERIALS: Pan Tiles 230 x (140 + 130)/2, 12 mm thick
1000 No
1560
Flat Tiles 150 x 150 x 15 mm
1000 No
470
Teak Reepers 50 x 12 mm Wire Nails 40 mm long Lime Lime Mortar B. LABOUR Carpenter Bricklayers Man mazdoor Woman mazdoor Sundries including tarring reepers, extra labour / for pointing the underside of flat tiles and white washing the same.
10RM kgs cum cum
75.000 0.500 0.008 0.300
day day day day LS
0.800 2.200 1.100 5.400 LS
Grand Total Sub Analysis : Lime Mortar 1:2 lime cum 0.500 Sand cum 1.000 Grinding Lime Mortar day 1.000 Read Free Foron 30this Days Sign up to vote title Total Useful Not useful Cancel anytime. BLD-CSTN- 129 Best Tiled Roofing with Pan tiles and Lime Special offer for students: Only $4.99/month. 10-6 mortar Borders including Teak Reapers at
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-7
130
131
– BUILDING
WORK I
Best Tiled Tiled Roofing with Pan tiles laid on Bamboo Rafters, Bamboo Reepers and Bamboo Mats, including Lime mortar Borders Unit = 10 sqm A. MATERIALS: Pan Tiles 230 x (140 + 130)/2, 12 mm thick
BLD-CSTN10-8
1000 No
1560
Bamboo rafters (450 mm apart) 75 to 100 mm dia
RM
25
Bamboo reepers, Split 25 mm dia
100 No
150
Bamboo mats
10 sqm
10.500
Lime Moratar for Borders B. LABOUR Carpenter Bricklayers Man mazdoor Woman mazdoor Sundries including nails Grand Total Best Tiled Roofing with Mangalore tiles set in Lime mortar over Flat Tiles and including Teak Reepers
cum
0.120
day day day day
1.100 1.400 1.100 3.200
1000 No
160
1000 No
470
10RM kgs cum cum
75.000 0.500 0.008 0.380
Unit = 10 sqm A. MATERIALS: Mangalore tiles (vide Stadard Specification) Flat Tiles 150 x 150 x 15 mm Teak Reepers 50 x 12 mm Wire Nails 40 mm long Lime Lime Moratr B. LABOUR Carpenter Bricklayers Special offer for students: Only $4.99/month. Man mazdoor
Master your semester with Scribd & The New York Times
Read Free Foron 30this Days Sign up to vote title
day Useful
0.800 Not useful Cancel anytime.
day day
1.600 1.100
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-10
133
Wire Nails 50 mm long Lime Moratar B. LABOUR Carpenter Bricklayers Man mazdoor Woman mazdoor Grand Total Best Tiled Roofing with Mangalore tiles over Ceiling Tiles with Air Spaces and including Teak Reepers
– BUILDING
kgs cum
0.500 0.090
day day day day
0.500 0.500 1.100 2.200
10 sqm
10.000
100 No
156
day day
0.500 1.100
WORK I
Unit = 10 sqm A. MATERIALS: Rate for "Best Mangalore tiled roofing with Mangalore tiles including teak reeper". Add Terracing tiles B. LABOUR Bricklayers Woman mazdoor Grand Total Common note Applicabable for Items 196 to 201 :1. The quantity proposed for Pan Tiles / Mangalore Tiles includes allowance for cost of special tiles for ridges and hips. 2. Reepers size is for rafter spacing 600 mm. including allowance for eves and valleys. 3. Labour including fixing galvanized iron sheeting-cost of sheeting to be paid separately. Sub Analysis : Master your semester with Scribd Lime Mortar (1: 1.5) : Unit = 1 cum & The New York Times Lime
Special offer for students: Only $4.99/month.
Fine Sand
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
cum cum
0.670 1.000
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-12
135
136
– BUILDING
WORK I
Terrace Roofing with Brick on edge 75 mm. mm. Concrete 2 Courses of Flat Tiles at Top and pointing Flat Tiles in Cement Mortar (1:3) and one coat of Cement Plaster (1:3) Unit = 10 sqm A. MATERIALS: Terracing Bricks 150 x 75 x 25mm
BLD-CSTN10-13
1000 No
2000
Flat Tiles 150 x 150 x 15 mm
100 No
900
Broken brick 20 mm cube Lime Lime Moratar Pointing with cement mortar 1:3 (for rate vide relevant schedule item)
cum cum cum 10 sqm
0.980 0.380 0.210 1.000
Cement Mortar 1:3 cum B. LABOUR Bricklayers day Mazdoor (unskilled) day Grand Total Note : The quantity proposed for broken brick allows for the brick powder formed, replacing sand for concrete layers. Reinforced cement Concrete Roofing 125 mm thick with CC (M 20) using 20 mm graded metal and 2 courses of Flat Tiles at Top including pointing with Cement Mortar (1:3) Unit = 10 sqm A. MATERIALS: Reinforced Concrete Roofing slab 125 mm thick (for rate - vide relevant schedule item) Flat Tiles 150 x 150 x 20 mm
0.240 4.300 6.500
10 sqm
10.000
100 No
900
Master your semester Scribd Cementwith Mortar 1:3 cum 0.260 Read Free Foron 30this Days Sign up to vote title Pointing with cement mortar 1:3 (for rate 10 1.000 & The New York Times Useful vide relevant schedule item) sqm Not useful Special offer for students: Only $4.99/month. B. LABOUR Bricklayers
Cancel anytime.
day
2.200
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-14
137
138
Add : For extra thickness of roofing slab Grand Total Reinforced cement Concrete Roofing 150 mm thick with CC (M 20) using 20 mm graded metal and 2 courses of Flat Tiles at Top including Pointing with Cement Mortar (1:3) Rate of "Reinforced cement Concrete Roofing 125 mm thick and 2 courses of Flat Tiles at Top including pointing with Cement Mortar (1:3)"
BLD-CSTN10-16
139
Add : For extra thickness of roofing slab Grand Total Reinforced cement Concrete Roofing 100 mm thick with CC (M 20) using 20 mm graded metal and 2 courses of Flat Tiles at Top including Pointing with Cement Mortar (1:3) Rate of "Reinforced cement Concrete Roofing 125 mm thick and 2 courses of Flat Tiles at Top including pointing with Cement Mortar (1:3)"
Master your semester Scribd Deduct with : For Less thickness of roofing slab & The New York Times Grand Total
10 sqm
1.000
cum
0.150
10 sqm
1.000
cum
0.250
10 sqm
1.000
Read Free Foron 30this Days Sign up to vote title
Special offer for students: Only 140 $4.99/month. BLD-CSTNReinforced cement Concrete Roofing 100 mm 10-17
– BUILDING
WORK I
Reinforced cement Concrete Roofing 140 mm thick with CC (M 20) using 20 mm graded metal and 2 courses of Flat Tiles at Top including Pointing with Cement Mortar (1:3) Unit = 10 sqm A. MATERIALS: Rate of "Reinforced cement Concrete Roofing 125 mm thick and 2 courses of Flat Tiles at Top including pointing with Cement Mortar (1:3)"
BLD-CSTN10-15
thick with CC (M 20) using 20 mm graded
cum
0.250
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Impermo Compound Grand Total Note for Items 204 - 207 : 1. No extra rate will be paid for finishing the bottom surface of the roofing slab as described in SS No.
– BUILDING
kgs
1.500
1000 No
450
Cement Mortar 1:3 Pointing with cement mortar 1:3 (for rate vide relevant schedule item)
cum 10 sqm
0.110 1.000
B. LABOUR Bricklayers Man Mazdoor Clean removal of lime plaster from terraced roofs and raking out joints 12 mm deep (for rate - vide relevant schedule item)
day day 10 sqm
1.100 1.100 1.000
WORK I
"For estimating purpose the extra allowance for camber concrete, when such is required may be given under sundries." BLD-CSTN10-18
141
Complete Surface Repairs to Leaky Terrace Roofs with Flat Tiles Unit = 10 sqm A. MATERIALS: Flat Tiles 150 x 150 x 15 mm
BLD-CSTN10-19
142
Sub Analysis : Mazdoor (unskilled) Mate Sundries including crude oil Grand Total Best Sloping Bengal Terrace with 3 courses of Flat Tiles at Top including Teak Wood Reepers Unit = 10 sqm A. MATERIALS: Flat Tiles 150 x 150 x 15 mm
Master your semester with Scribd & The New York Times Lime Special offer for students: Only $4.99/month.
Lime Moratar (1:1.5)
Day Day LS
1000 1350 Read Free Foron 30this Days Sign up to vote title
No
Not useful Cancel anytime.
Useful
cum cum
0.008 0.150
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
2. No extra rate will bepaid for finishing the bottom surface of the roofing slab as described in SS No. BLD-CSTN10-20
143
Removing Old Tiles and Retiling with with New Pan Tiles over Old Teak Reepers including New White Washed Lime Mortar Borders 230 x 50 mm. at 2 Metres Intervals Unit = 10 sqm A. MATERIALS: Pan Tiles 230 x (140 + 130)/2, 12 mm thick
BLD-CSTN10-21
BLD-CSTN10-22
144
145
Lime Moratar B. LABOUR Bricklayers Man Mazdoor Woman mazdoor Sundries Grand Total Shifting Pan Tiles (Labour Only) Unit = 10 sqm Bricklayers Man Mazdoor Grand Total Shifting Pan Tilesand forming new new White Washed Lime Mortar Boarders, 230 x 50 mm at 2 Metres Intervals Unit = 10 sqm Rate of "Shifting Pan Tiles" Add : Lime Mortar Borders and White Washing
BLD-CSTN10-23
146
1000 No
1560
cum
0.120
day day day LS
1.400 1.100 4.300
day day
1.100 0.800
10 sqm
1.000
LS
Grand Total 12 mm. Teak Wood Plank Ceiling Tongued and Grooved Planking
Master your semester with Scribd Unit = 10 sqm A. MATERIALS: & The New York Times Teak Wood Planks 150 x 12 mm Special offer for students: Only $4.99/month.
Screws 40mm long
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
cum 100 No
0.132 300
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Teak Wood Battens 40 x 12 mm Brass screws 25 mm long
BLD-CSTN10-25
148
Deduct : Carpenter Sundries Grand Total Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Unit = 10 sqm A. MATERIALS: Cement Mortal 1:3 Water proof compound B. LABOUR st Mason 1 class nd
Mason 2
BLD-CSTN10-26
149
class
Mazdoor (unskiled) Grand Total Providing & fixing insulating board ceiling of approved quality with nails etc., complete, excluding the cost of frame work for base and cost of conveyance of all materials
Unit = 10 sqm Master your semester with Scribd A. MATERIALS: 12 mm thick insulating board & The New York Times B. LABOUR Special offer for students: Only $4.99/month.
Carpenter Ist class
– BUILDING
10 RM 100 No
66.000 240
day LS
1.100
cum kg
0.210 2.000
day
0.660
day
1.540
day
3.70
Read Free Foron 30this Days Sign up to vote title
Not useful 11.00 Cancel anytime.
sqm Useful day
2.50
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-28
151
BLD-CSTN10-30
– BUILDING
WORK I
Providing & fixing flat pressed pressed 3 layer medium density particle board sheet with necessary nails etc., complete, excluding the cost of frame work for base and cost of conveyance of all materials Unit = 10 sqm A. MATERIALS: Standard quality of flat pressed 3 layer medium density board sheet 4.50 mm thick
BLD-CSTN10-29
152
B. LABOUR Carpenter Ist class Man mazdoor Grand Total Providing & fixing fixing plain plain AC sheet ceiling of approved quality with necessary nails etc., complete, excluding the cost of frame work for base and cost of conveyance of all materials
153
Unit = 10 sqm A. MATERIALS: Plain AC sheet for ceiling B. LABOUR Carpenter Ist class Man mazdoor Grand Total Providing 10 mm thick plaster of paris (Gypsum anhydrous) ceiling upto a height of 5 m above floor level over first class BT wood strips 25 x 6 mm with 10 mm gap in between and reinforced with rabbit wire mesh fixed to wooden frame excluding cost of wooden frame for base & cost of conveyance of all materials.
sqm
11.00
day day
2.50 2.00
sqm
11.00
day day
2.50 2.00
Unit = 10 sqm Master your semester with Scribd A. MATERIALS: Read Free Foron 30this Days Sign up to vote title Wooden strips 1 class BT wood 25 x 6 mm cum 0.05 & The New York Times Useful Not useful size st
Special offer for students: Only $4.99/month. Nails
Cancel anytime.
kg
0.75
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-31
154
– BUILDING
WORK I
Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification.
UNIT -1 sqm A) Material requirement as per India Gypsum 12.5 mm Gypboard 1219 mm x 1829 mm size Boards sqm 1.03 Ceiling Angle 25 mm x 10 mm x 0.55 mm RM 0.64 Connecting Clips Nos 1.84 Read Free For 30this Days Sign up to vote on title Ceiling Section 51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick RM Not 2.30useful Useful
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Intermediate Channel
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN10-32
155
– BUILDING
1st Class Painter 2nd Class Painter Power Saw Cutter - Hand Operated Operator
day day day
0.08 0.08 0.04
Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
day day
0.08 0.24
Hrs
0.32
Power Drill - Hand Operated - Hire Charges
Hrs
0.64
Scaffolding charges BASIC COST per 1 sqm Gyp Board Fine Line Grid false ceiling Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification.
Master your semester with Scribd & The New York Times UNIT -1 sqm Special offer for students: Only $4.99/month.
A) Material requirement as per India Gypsum
WORK I
1%
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Soffit Cleats Unversal Holding Clips Drywall Top Coat B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter 1st Class Painter 2nd Class Painter Power Saw Cutter - Hand Operated Operator
Nos Nos Lits
1.28 5.36 0.15
day day day day day
0.40 0.40 0.08 0.08 0.04
Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
day day
0.04 0.24
Hrs
0.32
Power Drill - Hand Operated - Hire Charges
Hrs
0.32
Scaffolding charges 1% BASIC COST per 1 sqm Armstrong False ceiling BLD-CSTN- 156 Providing and fixing in true horizontal level 10-33 600 mm x 600 mm 15 mm thick Arm strong false ceiling system manufactured by M/s Arm strong world Industries using hot dipped Galvanised Steel section exposed surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary stiched cross tee of size 24 x 27 mm at evry 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire laying fine fissured butt edge ceiling tiles of 15 mm thick mineral fiber Board manufactured by M/s Arm Strong World Industries Ltd., having Read Free Foron 30this Days Sign up to vote title RH 99% and for finished of size 600 x 600 mm Useful Not useful Cancel anytime. including Cost &conveyance of all materials Special offer for students: Only $4.99/month. and labour charges such as cutting , fixing of standing of frame work exposing roof making
Master your semester with Scribd & The New York Times
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Polyster painted GI - T Section - 300 mm 24 mm x 27 mm GI Rod - prestraightened - 2.0 mm dia Connecting Rod 6 mm Nylon Rawl Plug B) LABOUR CHARGES PER UNIT 1 sqm 1st Class Carpenter 2nd Class Carpenter 1st Class Painter 2nd Class Painter Power Saw Cutter - Hand Operated Operator
– BUILDING
RM
1.60
RM Nos
1.28 1.28
day day day day day
0.40 0.40 0.08 0.08 0.04
Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
day day
0.04 0.24
Hrs
0.32
Power Drill - Hand Operated - Hire Charges
Hrs
0.32
Scaffolding charges 1% BASIC COST per 1 sqm Thermocole False ceiling BLD-CSTN- 157 Providing and fixing Thermocole False ceiling 10-34 in true horizontal level 600 mm x 600 mm using 15 mm/ 19 mm thick Thermocole Thermocole sheet anodised Aluminium Tee sections of size 24.50 mm x 24.0 mm x 2.4 mm in grid with cross tee of size 24 x 24.5 mm at every 600 mm c/c and anodised aluminium wall angle of size 24 x 24 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick GI Wire for finished of size 600 x 600 mm including Cost &conveyance of all materials and labour charges such as cutting , Read Free Foron 30this Days Sign up to vote title fixing of standing of frame work exposing roof making complete for finished item of Useful Not useful Cancel anytime. work Special offer for students: Only $4.99/month.
Master your semester with Scribd & The New York Times
WORK I
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN11 BLD-CSTN11-1
158
– BUILDING
2nd Class Carpenter 1st Class Painter 2nd Class Painter Power Saw Cutter - Hand Operated Operator
day day day day
0.36 0.00 0.00 0.02
Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
day day
0.04 0.20
Hrs
0.16
Power Drill - Hand Operated - Hire Charges
Hrs
0.32
Scaffolding charges BASIC COST per 1 sqm WHITE WASHING, COLOUR WASHING & DISTEMPERING
WORK I
1%
White washing one one coat with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Fine screened shell lime Gum, conjee water, or prickly pear juice including necessary fire wood
cum
0.005 L.S
B. LABOUR Brick Layers day 0.11 Mazdoor (unskilled) day 0.22 Sundries including brushes etc., LS Total cost for 10 sqm Read Free Foron 30this Days Sign up to vote title BLD-CSTN- 159 White washing two coats with lime of Useful Not useful Cancel anytime. 11-2 approved quality to give an even shade after Special offer for students: Only $4.99/month. thoroughly brushing the surface to remove all dirt and remains of loose powdered
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN11-3
160
Mazdoor (unskilled) Sundries including brushes etc., Total cost for 10 sqm White washing three coats with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Fine screened shell lime Gum, conjee water, or prickly pear juice including necessary fire wood
BLD-CSTN11-4
161
B. LABOUR White washer Brick Layers Man Mazdoor Women mazdoor Mazdoor (unskilled) Sundries including brushes, ladders etc., Total cost for 10 sqm White washing one coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
Master your semester with Scribd Unit: 10 sqm & The New York Times A. MATERIALS : Special offer for students: Only $4.99/month. Whiting / White Cement
– BUILDING
day LS
0.32
cum
0.009 L.S
day day day day day LS
0.220 0.43
WORK I
with White Cement Grade II
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
cum / kg
1.20
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN11-5
162
cum / kg
Gum, conjee water, or prickly pear juice including necessary fire wood
163
– BUILDING
WORK I
White washing washing two coats with whiting whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Whiting / White Cement
BLD-CSTN11-6
B. LABOUR Brick Layers / Painter Mazdoor (unskilled) Sundries including brushes, ladders, etc., Total cost for 10 sqm White washing three coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials Unit: 10 sqm A. MATERIALS : Whiting / White Cement
Master your semester withwater, Scribd Gum, conjee or prickly including necessary fire wood & The New York Times B. LABOUR Special offer for students: Only $4.99/month. Brick Layers / Painter Mazdoor (unskilled)
2.00 L.S
day day
0.210 0.320 1.00%
cum / kg
2.800
pear juice
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
day day
0.300 0.430
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Rate for "White Washing" two coats
– BUILDING
10 sqm
1.000
kg
1.340
day day
0.500 1.300 1.000%
kg
1.700
day
1.200 1.000%
WORK I
Add: For Colours, etc., (50 percent of above rate) BLD-CSTN11-9
BLD-CSTN11-10
BLD-CSTN12 BLD-CSTN12-1
166
167
Total Distempering, 2 Coats with Water Bound Distemper Unit: 10 sqm A. MATERIALS : Distemper B. LABOUR Painter Mazdoor (unskilled) Sundries including brushes, ladders, etc., Total cost for 10 sqm Distempering, 2 Coats with Oil Bound Distemper Unit: 10 sqm A. MATERIALS : Distemper B. LABOUR Painter Sundries including brushes, ladders, etc., Total cost for 10 sqm PAINTING & VARNISHING
168
Painting to new walls walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. Read Free Foron 30this Days Sign up to vote title complete for finished item of work as per SS 911 for internal walls Useful Not useful
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
PRIMARY COAT:
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Painter Sundries including brushes, soaps, putty etc.,
BLD-CSTN12-3
BLD-CSTN12-4
BLD-CSTN12-5
170
171
172
– BUILDING
day
0.700 0.500%
kg
2.000
day day
0.300 1.500 1.000%
WORK I
Total cost for 10 sqm Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) Unit: 10 sqm A. MATERIALS : Cement Paint at 5 sqm., per kg B. LABOUR Painter Mazdoor (unskilled) Sundries including brushes, etc., Total cost for 10 sqm Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours)
Unit: 10 sqm A. MATERIALS : Cement Paint at 3 sqm., per kg kg 3.500 B. LABOUR Painter day 0.500 Mazdoor (unskilled) day 1.500 Sundries including brushes, etc., 1.000% Total cost for 10 sqm Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS Read Free Foron 30this Days Sign up to vote title 912 for internal walls
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Wood Primer B. LABOUR Painter Sundries including brushes, soap, putty etc.,
BLD-CSTN12-7
174
BLD-CSTN12-9
– BUILDING
L
0.700
day
0.700 1.000%
L
0.70
day
0.70
L L
0.800 0.600
day day
0.700 0.700
WORK I
Total cost for 10 sqm Painting, Priming Coat on New Iron Work Unit: 10 sqm A. MATERIALS : Red Oxide Primer B. LABOUR Painter Sundries including brushes, soap, putty etc.,
BLD-CSTN12-8
175
Total cost for 10 sqm Varnishing to Wood Work, One Coat
176
Unit: 10 sqm A. MATERIALS : Varnish Linseed Oil - boiled B. LABOUR Painter Man Mazdoor Sundries including brushes,fuel, size etc., Total cost for 10 sqm Varnishing to Wood Work, Two Coats
Unit: 10 sqm A. MATERIALS : Varnish L 1.200 Linseed Oil - boiled L 1.100 B. LABOUR Painter day 1.100 Man Mazdoor day 1.100 Read Free Foron 30this Days Sign up to vote title Sundries including brushes,fuel, size etc., Useful Not useful Cancel anytime. Total cost for 10 sqm Special offer for students: Only $4.99/month. BLD-CSTN- 177 Painting with Ready mixed mixed oil paint (all
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
179
Sundries including brushes, soap, putty etc.,
day LS
1.200
kg
1.500
day
0.700
WORK I
LS
Total cost for 10 sqm Two Coats - Old Wood Work & New Iron Work: Unit: 10 sqm A. MATERIALS : Ready mixed paint B. LABOUR Painter Sundries including brushes, soap, putty etc.,
181
– BUILDING
Total cost for 10 sqm One Coat - Old Wood Work & New Iron Work : Unit: 10 sqm A. MATERIALS : Ready mixed paint B. LABOUR Painter
180
Total cost for 10 sqm One Coat - Old Iron Work : Unit: 10 sqm A. MATERIALS : Ready mixed paint B. LABOUR Painter Sundries including brushes, soap, putty etc.,
kg
2.4.
day LS
1.200
kg
1.200
day LS
0.700
Total cost for 10 sqm 182 Two Coats - Old Iron Work : Unit: 10 sqm A. MATERIALS : Read Free Foron 30this Days Sign up title Ready mixed paint kgto vote 2.100 Useful Not useful B. LABOUR Cancel anytime. Painter day 1.100 Special offer for students: Only $4.99/month. Sundries including brushes, soap, putty etc., LS
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
BLD-CSTN12-11
185
– BUILDING
day LS
1.600
L
0.500
day
0.700
L
0.400
day
0.700
L
0.900
WORK I
Total cost for 10 sqm Painting with : i. Plastic Emulsion paint Grade I - One Coat for New Wood Work, Old Wood Work & New Iron Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
186
Total cost for 10 sqm Plastic Emulsion paints - One Coat for Old Iron Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
187
Total cost for 10 sqm Plastic Emulsion paints - Two Coats for New Wood Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd.
B. LABOUR Painter day 1.200 Sundries including brushes, soap, putty etc.,Read Free Foron 30this Days Sign up to vote title
Master your semester with Scribd & The New York Times Total cost for 10 sqm Special offer for students: Only $4.99/month. 188
Plastic Emulsion paints - Two Coats for Old Wood Work & New Iron Work :
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
190
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
day
1.100
L
0.700
day
1.100
L
1.200
day
1.600
L
1.100
day
1.500
WORK I
Total cost for 10 sqm Plastic Emulsion paints - Three Coats for New Wood Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
192
– BUILDING
Total cost for 10 sqm Plastic Emulsion paints - Two Coats for for Old Iron Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd.
191
Total cost for 10 sqm Plastic Emulsion paints - Three Coats for Old Iron Work : A. MATERIALS : Plastic Emulsion paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
Total cost for 10 sqm Master your semester with Scribd BLD-CSTN- 193 Painting with Synthetic Enamel paints - One Read Free Foron 30this Days Sign up to vote title 12-12 Coat - for New Wood Work, Old Wood Work & The New York Times Useful Not useful & New Iron Work
Special offer for students: Only $4.99/month.
A. MATERIALS :
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Sundries including brushes, soap, putty etc.,
195
Total cost for 10 sqm Painting with Synthetic Enamel paints - Two Coats - for New Wood Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
196
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
day
1.200
L
1.100
day
1.200
L
1.100
day
1.100
Total cost for 10 sqm Painting with Synthetic Enamel paints - Two Coats - For New Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd. B. LABOUR Painter Sundries including brushes, soap, putty etc.,
198
1.200
Total cost for 10 sqm Painting with Synthetic Enamel paints - Two Coats - For Old Wood Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.
197
L
Total cost for 10 sqm Painting with Synthetic Enamel paints - Two Coats - For Old Iron Work
Master your semester with Scribd A. MATERIALS : Read Free Foron 30this Days Sign up to vote title Synthetic Enamel paint (at 20 sqm / litre as L 0.900 & The New York Times Useful Not useful per British Paints (I) Ltd. Special offer for students: Only $4.99/month.
B. LABOUR
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
200
B. LABOUR Painter Sundries including brushes, soap, putty etc.,
201
BLD-CSTN12-15
202
203
WORK I
L
1.600
day
1.500
kg
0.500
day day LS
0.800 0.800
L
0.650
day day LS
0.800 0.800
Total cost for 10 sqm Polishing on wood work with readymade wax polish of approved brand and manufacture New Work : A. MATERIALS : Readymade wax polish B. LABOUR Painter Helper Sundries including brushes, soap, cloth etc.,
BLD-CSTN12-14
– BUILDING
Painting with Synthetic Enamel paints - Three Coats - For Old Iron Work A. MATERIALS : Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.
BLD-CSTN12-13
Total cost for 10 sqm Melamine polishing on wood work (one coat) New Work : A. MATERIALS : Melamine polish B. LABOUR Painter Healper Sundries for Spraying Machine etc., Total cost for 10 sqm French Spirit polishing Two or more coats on new works including a coat of wood filler.
A. MATERIALS : Master your semester with Scribd Shellac Spirit & The New York Times B. LABOUR Special offer for students: Only $4.99/month. Painter
kgto vote 0.228 Read Free Foron 30this Days Sign up title
Not useful 1.630 Cancel anytime.
L Useful
day
3.200
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN13-2
205
Sundries including nails, screws etc., Cost per cum Best Teak Wood wrought and put put up over 2 metres and below 3 metres in length (Schedule Item No 287) Unit = 1 cum Materials :— Teak wood large scantlings over 2 m and below 3 m in length
BLD-CSTN13-3
206
Labour :— Carpenter Man Mazdoor Sundries including nails, screws etc., Cost per cum Best Teak Wood wrought and put put up in large scantling of over 3 metres in length (Schedule Item No 288) Unit = 1 cum Materials :— Teak wood large scantlings over 2 m and below 3 m in length
BLD-CSTN13-4
207
Labour :— Carpenter Man Mazdoor Sundries including nails, screws etc., Cost per cum Best Teak Wood wrought and put up up for trusses including straps and all iron work (Schedule Item No 289)
– BUILDING
WORK I
LS
cum
1.000
day day
17.700 8.800 LS
cum
1.000
day day
17.700 8.800 LS
Unit = 1 cum Materials :— Teak wood large scantlings cum 1.000 Iron Work (average) kg 112.000 Labour :— Carpenter day 26.500 Man Mazdoor day 8.800 Read Free Foron 30this Days Sign up to vote title Sundries including nails, screws etc., LS useful Useful Not Cancel anytime. Cost per cum Special offer for students: Only $4.99/month. BLD-CSTN- 208 Fully Panelled doors - External or Internal -
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 210
Total for each door 1100 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters
cum sqm
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 211
Total for each door 1200 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters
0.109 2.200 LS
cum sqm
0.123 2.520
cum sqm
0.094 1.890
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 212
Total for each door 900 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)
213
Total for each door 1500 x 2400 mm *Teak wood Labour, wrought and putup in position frame & shutters
LS
cum sqm
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)
Master your semester with Scribd Total for each door Double Shutter & The New York214Times 900 x 2000 mm Special offer for students: Only $4.99/month.
*Teak wood
0.159 3.600 LS
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
cum
0.096
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
216
1300 x 2200 mm *Teak wood Labour, wrought and putup in position frame & shutters
– BUILDING
cum sqm
0.134 2.860
cum sqm
0.147 3.220
cum sqm sqm
0.068 0.720 1.600
WORK I
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 217
Total for each door 1400 x 2300 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door * Note : Average rate for respective size scantlings and rough plank
BLD-CSTN13-6
218
Fully Panelled doors - Internal Five Five Ply - Plywood Panels (Schedule Item No 291) Single Shutter 800 x 2000 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)
219
Total for each door 900 x 2000 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters
LS
cum sqm sqm
0.071 0.870 1.800
Master your semester with Scribd Sundries inclusive of holdfasts and all wind Read Free Foron 30this Days Sign up to vote title appliances (Vide relevant standard & The New York Times Useful Not useful specification) Special offer for students: Only $4.99/month.
Total for each door
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 222
Total for each door 900 x 2100 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters
cum sqm sqm
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 223
Total for each door 1000 x 2100 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters
0.077 0.880 1.890 LS
cum sqm sqm
0.091 0.880 2.100
cum sqm sqm
0.082 0.710 1.800
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 224
Total for each door Double Shutter 900 x 2000 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification)
225
Total for each door 1000 x 2000 mm *Teak wood cum 0.088 Five - Ply - Ply - Wood brich sqm 0.820 Labour, wrought and putup in position frame sqm 2.000 Read Free Foron 30this Days Sign up to vote title & shutters
Master your semester with Scribd & The New York Times Useful Sundries inclusive of holdfasts and all wind Special offer for students: Only $4.99/month.
appliances (Vide specification)
Not useful Cancel anytime.
relevant
standard
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Labour, wrought and putup in position frame & shutters
– BUILDING
sqm
3.600
cum sqm sqm
0.130 1.280 3.600
Top Tower bolts (Ave : Size) Bottom Tower bolts 150mm long Parliament hings with screws Oxidised aldrop with bolts Wind cleats with hings (Same for all doors) Furniture - Iron - Internal doors (Schedule Item 293)
Nos Nos Nos Nos Nos
2 2 6 1 2
Top Tower bolts (Ave : Size) Bottom Tower bolts 150mm long Butt hings with screws Wind cleats with hings (Same for all doors) Glazed and Panelled doors (Schedule Item No. 294)
Nos Nos Nos Nos
1 2 6 2
WORK I
Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) 228
Total for each door 1500 x 2400 mm *Teak wood Five - Ply - Ply - Wood brich Labour, wrought and putup in position frame & shutters Sundries inclusive of holdfasts and all wind appliances (Vide relevant standard specification) Total for each door * Note : Average rate for respective size scantlings and rough plank
BLD-CSTN13-7
BLD-CSTN13-8
BLD-CSTN13-9
229
230
231
Furniture - Iron - for External doors (Schedule Item 292)
Single Shutter Master your semester with Scribd 800 x 2000 mm *Teak wood & The New York Times
Read Free Foron 30this Days Sign up to vote title
Glass Labour, wrought and putup in position frame
Special offer for students: Only $4.99/month.
cum Useful
Not useful 0.072 Cancel anytime.
sqm sqm
0.470 1.600
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
233
1200 x 2100 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and all wind appliances (Vide relevant standard specification)
234
Total for each door 1300 x 2200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and all wind appliances (Vide relevant standard specification)
235
Total for each door Double Shutter 900 x 2000 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and all wind appliances (Vide relevant standard specification)
236
Total for each door 1000 x 2000 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters
cum sqm sqm
– BUILDING
Special offer for students: Only $4.99/month.
*Teak wood
WORK I
0.106 0.760 2.520
LS
cum sqm sqm
0.115 0.870 2.860
LS
cum sqm sqm
0.087 0.420 1.800
LS
cum sqm sqm
0.092 0.510 2.000
Sundries inclusive of putty, brads, hold fasts LS and all wind appliances (Vide relevant standard specification) Read Free Foron 30this Days Sign up to vote title
Master your semester with Scribd Total for each door & The New York237Times 1100 x 2000 mm
Not useful Cancel anytime.
Useful
cum
0.096
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Sundries inclusive of putty, brads, hold fasts and all wind appliances (Vide relevant standard specification) 239
Total for each door 1500 x 2400 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and all wind appliances (Vide relevant standard specification)
– BUILDING
WORK I
LS
cum sqm sqm
0.130 1.280 3.600
LS
Total for each door * Note : Average rate for respective size scantlings and rough planks. BLD-CSTN13-10 BLD-CSTN13-11
240
241
Furniture - Same as for Fully Panelled Panelled Doors External (Schedule Item No. 295) Total for each door Framed and Planked Doors (Schedule Item No. 296) 1000 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances and screws for planks (Vide standard specification)
242
Total for each door 1200 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances and screws for planks (Vide standard specification)
cum sqm
0.107 2.000
LS
cum sqm
0.127 2.520
LS
Master your semester with Scribd Total for each door Read Free Foron 30this Days Sign up to vote title * Note : Average rate for respective size & The New York Times Useful Not useful scantlings and rough planks. Special offer for students: Only $4.99/month. BLD-CSTN13-12
243
Country wood wood Framed and Planked Doors (Schedule Item No. 297)
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Sundries inclusive of putty, brads, hold fasts and wind appliances and screws for planks (Vide standard specification) BLD-CSTN13-13
BLD-CSTN13-14
245
246
– BUILDING
LS
Each Door Ledged Braced and Planked Doors (Schedule Item No. 299)
cum sqm
Sundries inclusive of hold fasts and wind appliances and nails for planks (Vide standard specification)
LS
** Furniture - 3 Nos T - hinges - Vide SS for size - 2 Nos Chain and slopes country make.
LS
Total for each door 1000 x 2100 mm *Teak wood Labour, wrought and putup in position frame & shutters
cum sqm
Sundries inclusive of hold fasts and wind appliances and nails for planks (Vide standard specification)
LS
** Furniture - 3 Nos T - hinges - Vide SS for size - 2 Nos Chain and slopes country make.
LS
0.083 1.600
0.100 2.100
Total for each door Note : * Average rate for respective size scantlings and rough planks.
Master your semester with Scribd Read Free Foron 30this Days Sign up to vote title ** Note that for this type of door the & The New York Times Useful Not useful furniture will be supplied and fixed by the Special offer for students: Only $4.99/month. contractor. BLD-CSTN-
248
WORK I
Total for each door Furniture - 6 Butt Hings - 1 Top and 2 Bottom Bottom Tower Bolts and One Wrought steel safety Hasp L.S. (Schedule Item No. 298)
Single Shutter : 800 x 2000 mm *Teak wood Labour, wrought and putup in position frame & shutters
247
* Country wood Ledged Braced and Planked
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Country wood Labour, wrought and putup in position frame & shutters
cum sqm
Sundries inclusive of hold fasts and wind appliances and nails for planks (Vide standard specification)
LS
** Furniture - 3 Nos T - hinges - Vide SS for size - 2 Nos Chain and slopes country make.
LS
– BUILDING
WORK I
0.100 2.100
Total for each door ** Note that for this type of door the furniture will be supplied and fixed by the contractor. Note : * Class of Country wood to be defined in relevent schedule item. BLD-CSTN13-16
250
Flush type Doors with 35mm Thick Flush Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood (Schedule Item No. 301.) Single Shutter : 900 x 2000 mm *Teak wood Flush Shutter 35mm thick (Vide relevant standard specification) Labour, wrought and putup in position frame & shutters
cum sqm
0.035 1.530
sqm
1.800
cum sqm
0.037 1.820
Sundries inclusive of hold fasts and all wind appliances (Vide standard specification) 251
Total for each door 1000 x 2100 mm *Teak wood Flush Shutter 35mm thick (Vide relevant standard specification)
Labour, wrought and putup in position frame sqm 2.100 Master your semester with Scribd & shutters Read Free Foron 30this Days Sign up to vote title Sundries inclusive of hold fasts and all wind & The New York Times Useful Not useful appliances (Vide standard specification)
Special offer for students: Only $4.99/month.
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
253
Total for each window 800 x 1200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters
– BUILDING
cum sqm sqm
0.037 0.500 0.960
cum sqm sqm
0.041 0.700 1.200
cum sqm sqm
0.061 0.710 1.440
cum sqm sqm
0.072 0.920 1.800
WORK I
Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification) 254
Total for each window Double Shutter : 1000 x 1200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)
255
Total for each window 1200 x 1200 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)
256
Total for each window 1500 x 1200 mm (3 Pannels) *Teak wood Glass Labour, wrought and putup in position frame & shutters
Sundries inclusive of putty, brads, hold fasts Master your semester with Scribd and wind appliances (Vide standard Read Free Foron 30this Days Sign up to vote title specification) & The New York Times Useful Not useful Total for each window
Special offer for students: Only $4.99/month. 257
1000 x 1700 mm (2 Pannels)
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN13-19
BLD-CSTN13-20
BLD-CSTN13-21
259
260
261
– BUILDING
Parliament hinges Furniture for Double Leaf Windows Glazed without Top Lights (Schedule Item No. 304)
each LS
4
Top tower bolts 150 mm long Bottom bolts 150 mm long Parliament hinges Same for all such windows Furniture for Single Single Leaf Windows Glazed without Top Lights (Schedule Item No. 305)
each each each
2 2 4
Top tower bolts 150 mm long Bottom tower bolts 150 mm long Parliament hinges
each each each
1 1 2
cum sqm
0.039 0.720
cum sqm
0.043 0.840
cum sqm
0.051 0.960
WORK I
LS
Same for all such windows Windows Panelled (Schedule Item No. 306) Single Shutter 600 x 1200 mm *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of hold fasts and wind appliances (Vide standard specification)
262
Total for each window 700 x 1200 mm **Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of hold fasts and wind appliances (Vide standard specification)
263
Total for each window Double Shutter 800 x 1200 mm *Teak wood Labour, wrought and putup in position frame & shutters
Master your semester with Scribd Sundries inclusive of hold fasts and wind Read Free Foron 30this Days Sign up to vote title appliances (Vide standard specification) & The New York Times Useful Not useful Total for each window 1000 x 12000 mm
Special offer for students: Only $4.99/month. 264
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
*Note : Average rate for respective size scantlings. 266
900 x 1200 mm **Teak wood Labour, wrought and putup in position frame & shutters
cum sqm
0.056 1.080
cum sqm sqm
0.036 0.070 0.720
cum sqm sqm
0.052 0.100 1.080
Sundries inclusive of hold fasts and wind appliances (Vide standard specification) Total for each window **Note : Average rate for respective size scantlings and rough planks. BLD-CSTN13-22
267
Windows Panelled & Glazed (Schedule Item No. 307) Single Shutter 600 x 1200 mm **Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)
268
Total for each window Double Shutter 900 x 1200 mm **Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty, brads, hold fasts and wind appliances (Vide standard specification)
269
Total for each window 1200 x 1200 mm **Teak wood cum 0.077 Glass sqm 0.120 Read Free Foron 30this Days Sign up to vote title Labour, wrought and putup in position frame Useful sqm 1.440 Not useful Cancel anytime. & shutters
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Sundries inclusive of putty, brads, hold fasts
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
271
BLD-CSTN13-23
BLD-CSTN13-24
272
273
– BUILDING
WORK I
Furniture for Windows Panelled : Single Leaf with half Shutters (Schedule Item No. 308) Cabin hooks and eyes 200 mm long Butt hinges 75 mm size Top tower bolts 150 mm long Bottom bolts 150 mm long Same for all such windows Furniture for Windows Panelled : Double Leaf with half Shutters (Schedule Item No. 309)
each each each each
2 4 1 1
Cabin hooks and eyes 200 mm long Butt hinges 75 mm size Top tower bolts 150 mm long Bottom bolts 150 mm long Same for all such windows Teak Wood Windows - Ledged Braced and Planked (Schedule Item No. 310)
each each each each
4 8 2 2
cum sqm
0.034 0.720
600 x 1200 mm (half Shutters) *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of all furniture and fitting in accordance with relevant standard specification 274
Total for each window 800 x 1200 mm (half Shutters) *Teak wood Labour, wrought and putup in position frame & shutters Sundries inclusive of all furniture and fitting in accordance with relevant standard specification
LS
cum sqm
0.048 0.960
LS
Total for each window 900 x 1200 mm (half Shutters) *Teak wood cum 0.052 Read Free Foron 30this Days Sign up to vote title Labour, wrought and putup in position frame Useful sqm 1.080 Not useful Cancel anytime. & shutters
275 Master your semester with Scribd & The New York Times
Special offer for students: Only $4.99/month.
Sundries inclusive of all furniture and fitting
LS
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN13-25
277
279
– BUILDING
WORK I
Ventilators Glazed - Fixed Double Frame and with Wire Netting (Schedule Item No. 312) 800 x 500 mm *Teak wood Glass Wire netting Labour, wrought and putup in position Sundries inclusive of putty brads and iron hold fasts where such are necessary say in 30 cm wall.
278
cum sqm sqm sqm LS
0.012 0.240 0.190 0.400
Total for each Ventilator 1000 x 500 mm *Teak wood Glass Wire netting Labour, wrought and putup in position Sundries inclusive of putty brads and iron hold fasts where such are necessary say in 30 cm wall.
cum sqm sqm sqm LS
0.014 0.310 0.240 0.500
Total for each Ventilator 1200 x 600 mm *Teak wood Glass Wire netting Labour, wrought and putup in position Sundries inclusive of putty brads and iron hold fasts where such are necessary say in 30 cm wall.
cum sqm sqm sqm LS
0.018 0.480 0.290 0.720
Total for each Ventilator *Note : Average rate for respective size scantlings BLD-CSTN13-26
280
Swing Ventilators - Glazed (Schedule (Schedule Item No. 313)
800 x 500 mm Master your semester with Scribd *Teak wood Glass & The New York Times
cum 0.021 Read Free Foron 30this Days Sign up to vote title
Labour, wrought and putup in position frame & shutters
Special offer for students: Only $4.99/month.
sqm Useful
Not useful 0.190 Cancel anytime.
sqm
0.400
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
282
1200 x 600 mm *Teak wood Glass Labour, wrought and putup in position frame & shutters Sundries inclusive of putty brads sash centres brass ring iron cleats and window card - vide relevant standard specifications.
cum sqm sqm
– BUILDING
WORK I
0.030 0.390 0.720
LS
Total for each Ventilator *Note : Average rate for respective size scantlings and rough planks. BLD-CSTN13-27
283
Aluminium Fixed Glazing Supply and fixing of aluminimum fixed glazing as per drawing using standard powder coated/ anodised aluminimum section of 101.4 x 44.45 x 3.18 mm thick fitted with 6.0mm thick / 4.0 mm thick plain glass glazing fitted with suitable Aluminimum glazing clips and aproved brand silicon sealant including cost and conveyance of all materials labour charges for manufacturing fixing in position using wooden blocks and sheet metal screw etc. to complete for finished item of work as approved by Engineer-in-charge
Unit - 1 sqm A) MATERIAL REQUIREMENT ALUMINIUM SECTION Kgs as per design GLAZING with GLASS sqm as per design SILICON SEALANT Kgs as per design RUBBER BEADING RM as per design B) LABOUR CHARGES 1st Class Carpenter day 0.947 2nd Class Carpenter day 1.158 Read Free Foron 30this Days Sign up to vote title Power Saw Cutter - Hand Operated day 0.105 Useful Not useful Operator Cancel anytime.
Master your semester with Scribd & The New York Times
Special offer for students: Only $4.99/month. Power Drill - Hand Operated - Operator Unskilled Mazdoor
day day
0.211 0.632
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
STANDARD DATA BOOK
BLD-CSTN13-28
284
– BUILDING
WORK I
Supply and fixing of aluminimum Partition partly glazed as per drawing using standard powder coated/ anodised aluminimum section of 101.4 x 44.45 x 3.18 mm thick fitted with 12.0mm thick Particle Boards prelaminated up to 2.1 M height and balance height provided with 5.0 mm thick plain glass glazing fitted with suitable Aluminimum glazing clips and aproved brand silicon sealant including cost and conveyance of all materials labour charges for manufacturing fixing in position using wooden blocks and sheet metal screw etc. to complete for finished item of work as approved by Engineer-in-charge
Unit - 1 sqm A) MATERIAL REQUIREMENT ALUMINIUM SECTION PARTICLE BOARD - Prelaminated GLAZING with GLASS SILICON SEALANT RUBBER BEADING B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Power Saw Cutter - Hand Operated Operator
Kgs sqm sqm Kgs RM
as per design as per design as per design as per design as per design
day day day
1.042 1.042 0.104
Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
day day
0.139 0.347
Hrs
0.833
Power Drill - Hand Operated - Hire Charges
Hrs
1.111
Master your semester with Scribd Supervision Charges Power charges for Motors & The New York Times BASIC COST per 1 sqm
Special offer for students: Only 285 $4.99/month. BLD-CSTNAluminium Anodised Casement windows 13-29
Search document
Nos 0.174 Read Free Foron 30this Days Sign up to vote title
1%
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Supply and fixing Aluminium Anodised Casement windows as per approved drawing with aluminium anodised sections of Series C Jindal Hollow sections and outer frame of 8804 of size 46 x 44 mm, Shutter frame of 8802 of size 44 mm x 46 mm and Mullion frame of 8803 of size 59 x 38 and glazing section of 4433 with plain clear float glass 6 mm thick fixed including supply and fixing aluminium powder coated 1 No.of casement friction stay hinges for each shutter, 1 Nos. aluminium handles of 150 mm for each shutter and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work
Unit - 1 sqm A) MATERIAL REQUIREMENT ALUMINIUM SECTION GLAZING with GLASS SILICON SEALANT RUBBER BEADING Alum.Anodised.PC Friction stay casement hinges Alum.Anodised.PC Handles B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Power Saw Cutter - Hand Operated Operator
Kgs sqm Kgs RM Each
as per design as per design as per design as per design as per design
Each
as per design
day day day
0.360 1.081 0.360
Power Drill - Hand Operated - Operator day 0.360 Unskilled Mazdoor day 1.081 C) Machinery Read Free Foron 30this Days Sign up to vote title Power Saw Cutter - Hand Operated - Hire Hrs 2.883 Useful Not useful charges Cancel anytime.
Master your semester with Scribd & The New York Times
Special offer for students: Only $4.99/month. Power Drill - Hand Operated - Hire Charges
Hrs
2.883
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
STANDARD DATA BOOK
BLD-CSTN13-30
286
Search document
– BUILDING
WORK I
Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x 29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work UNIT 1 sqm A) MATERIAL REQUIREMENT ALUMINIUM SECTION GLAZING with GLASS SILICON SEALANT RUBBER BEADING Alum.Anodised.PC Handles B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Power Saw Cutter - Hand Operated Operator Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
Kgs sqm Kgs RM Each
as per design as per design as per design as per design as per design
day day day
0.347 1.042 0.347
day day
0.347 1.042
Hrs
2.778
Master your semester with Scribd Read Free Foron 30this Days Sign up to vote title Power Drill - Hand Operated - Hire Charges Hrs 2.778 & The New York Times Useful Not useful Special offer for students: Only $4.99/month. Supervision Charges
Power charges for Motors
Cancel anytime.
Nos
0.347 1%
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
STANDARD DATA BOOK
BLD-CSTN13-31
287
Search document
– BUILDING
WORK I
Supply and fixing Aluminium Anodised Doors - Single Shutter as per approved drawing with aluminium anodised sections of Jindal sections and outer frame top horizontals & both verticals of 2408 of size 101.6 x 44.75 x 3.18 mm Shutter frame top, bottom and verticals of 4504 of size 44.45 mm x 47.62 mm x 3.18 and Middle lock rail of 4621 of size 49.91 x 44.45 x 3 mm with plain clear float glass 5 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, floor springs/ hydraulic door closure assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work UNIT 1 sqm A) MATERIAL REQUIREMENT ALUMINIUM SECTION GLAZING with GLASS SILICON SEALANT RUBBER BEADING Alum.Anodised.PC Handles Hydraulic Floor Spring/ Door Closure B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Power Saw Cutter - Hand Operated Operator Power Drill - Hand Operated - Operator Unskilled Mazdoor C) Machinery Power Saw Cutter - Hand Operated - Hire charges
Kgs sqm Kgs RM Each Each
as per design as per design as per design as per design as per design as per design
day day day
0.417 0.833 0.417
day day
0.417 1.250
Master your semester with Scribd Read Free Foron 30this Days Sign up to vote title Power Drill - Hand Operated - Hire Charges Hrs 3.333 & The New York Times Useful Not useful Special offer for students: Only $4.99/month. Supervision Charges
Power charges for Motors
Hrs
3.333
Cancel anytime.
Nos
0.417 1%
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
Sundries such as sand paper and scraper etc.
BLD-CSTN14-2
289
Scaffolding Add for water charges @ 1 % Add for contractor's profit and overheads Cost for 10 sq.m. Cost per sq.m Removing white wash or colour wash by steel wire brushing and/or scraping; sand papering and preparing the ceiling and/or sloping roofs surface smooth including necessary repairs to scratches complete Deatailed cost for 10 sqm Rate as per above item
BLD-CSTN14-3
290
10 sqm
Add 10 % extra for ceiling / sloping roof Cost per 10 sq.m Cost per sq.m Removing white wash or colour wash wash by steel wire brushing and/or scraping; sand papering and preparing the wall surface smooth including necessary repairs to scratches complete for the wall surface spoiled by smoke soot Rate as per Item No (203)
10 sqm
For washing the wall surface spoiled by smoke soot with clear water before sand papering the surface smooth and including necessary repairs to the scratches complete Details of cost for 10 sq.m Labour :— Mazdoor (unskilled) day 0.080 Sundries Add for water charges @ 1 % Read Free Foron 30this Days Sign up to vote title Add for contractor's profit and overheads Useful Not useful Cancel anytime. Cost for 10 sq.m. Special offer for students: Only $4.99/month. Cost per sq.m BLD-CSTN- 291 Removing white wash colour wash by steel
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN14-5
292
BLD-CSTN14-7
BLD-CSTN14-8
293
294
– BUILDING
WORK I
Washing and cleaning of decorated wall surfaces with soap, soda and water Details of cost for 10 sq.m Labour :— White washer / Mason 2nd Class Mazdoor (unskilled) Sundries such as soap, soda, sand paper and scaper etc
BLD-CSTN14-6
day day
0.010 0.170
day day
0.010 0.170
Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m Washing and cleaning cleaning of the old plastered plastered ceiling and/or sloping roofs with soap, soda and water Rate as per Item above Extra 10% over Cost per 10 sq.m Cost per sq.m Washing and cleaning of oil and grease spots on decorated wall surface by suitable chemical
Details of cost for 10 sq.m Labour :— White washer / Mason 2nd Class Mazdoor (unskilled) Sundries, such as chemical etc. Add for water charges @ 1 % Cost for 10 sq.m. Cost per sq.m 295 Demolishing and disposal of unserviceable materials within 100 metres lead
Lime concrete. Details of cost for 1 cu.m. Labour :Mazdoor (unskilled) day 1.220 Read Free Foron 30this Days Sign up to vote title Sundries Useful Not useful Cancel anytime. Cost per cu m Special offer for students: Only $4.99/month. 296 Unreinforced cement concrete upto 15 cm
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN14-9
298
299
BLD-CSTN14-10
300
– BUILDING
WORK I
Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead R.C.C. work Details of cost for 1 cu.m. Labour :Mazdoor (unskilled) Sundries Cost per cu m Brick work: Details of cost for 1 cu.m. Labour :Mazdoor (unskilled) Sundries Cost per cu m Extra over item 14.2.ii for cutting steel bars in R.C.C. of R.B. work (sectional area of R.C.C. or R.B. Work to be measured) Details of cost for one Sq.m. of sectional area —
day
4.320
day
4.090
day day
0.500 0.500
Reinforced area considering 1% Labour for cuttings 0.01 Sq.m. reinforcement
BLD-CSTN14-11
301
Blacksmith 2nd class Mazdoor (Male) Sundries Cost per sq m Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc., complete and stacking them within 100 metre lead
Not exceeding 3 sq.m. in area: Details of cost per each Labour :Mason, II class Mazdoor (male) Blacksmith II class Special offer for students: Only $4.99/month. Sundries
Master your semester with Scribd & The New York Times
day 0.100 Read Free Foron 30this Days Sign up to vote title
day Useful
Not useful 0.200 Cancel anytime.
day
0.050
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Details of cost for 3 metres length Materials:— Aluminium step edging 'L' shape 38 x 12 x 3mm (thick) = 3.00 metres with 5% wasage
– BUILDING
m
3.150
day day day
0.090 0.250 0.250
m
3.150
day day day
0.090 0.250 0.250
WORK I
Carriage of materials Sundries (Wooden plugs, screws and painting underneath of strips with bitumanistic paint, etc.,) Labour :Carpenter II class
BLD-CSTN15-2
304
Mason I class Mazdoor (male) Cost for 3 m Cost per m Providing and fixing aluminium step edging 'L' shape of size 57 mm x16 mm x 3 mm (thick) to stairs Details of cost for 3 metres length Materials:— Aluminium step edging 'L' shape 57 mm x16 mm x 3 mm (thick) with 5% wasage Carriage of materials Sundries (Wooden plugs, screws and painting underneath of strips with bitumanistic paint, etc.,) Labour :-
BLD-CSTN15-3
305
Carpenter II class Mason I class Mazdoor (male) Cost for 3 m Cost per m Cutting RCC steps for for fixing of aluminium aluminium step edging and make good to match the surroundings
Details of cost for 3 metres Master your semester with Scribd Cement Mortar Labour :& The New York Times Mason, II Class Mazdoor (male)
Special offer for students: Only $4.99/month.
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
day day
1.000 0.100
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN15-5
307
Assistant fitter Mason. Mazdoor (male). Sundries Cost for 1.25 m Cost per m Providing and fixing 1.80 metre metre long RCC fencing posts with 6 mm bar nibs as per design in plate No. 22/2/2. (earth work & concrete to be paid for separately)
– BUILDING
day day day
0.100 0.400 0.400
m
1.310
day day day
0.100 0.400 0.400
WORK I
Details of cost for 10 pipes 12.5 cm long day i.e., 1.25 metres Materials:— Galvanised mild steel tube (light grade) 40 mm nominal bore 10 x 12.5 cm = 1.25 metre with wastage of 5% Labour :-
BLD-CSTN15-6
308
For cutting and fixing in position Assistant fitter Mason. Mazdoor (male). Sundries Cost for 1.25 m Cost per m Providing and fixing 1.80 metre metre long RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete to be paid for separately) Details of cost for 10 posts, i.e., 0.336 Cu. m (Details as per Annexure ' X ' at the end of this item)
Materials:— Cement concrete 1:2:4 (1 cement : 2 coarse cum 0.336 sand :4 graded stone aggregate 12.5 mm nominal size) Read Free For 30 Days
Master your semester with Scribd (Rate as per item Concrete work) & The New York Times M.S. reinforcement 6 mm dia bars
Sign up to vote on this title
10 x 4 x 1.88 = 75.20 metres 10 x 9 x 0.50 = 45.00 metres./ l20.00 m 120.20 m @
Special offer for students: Only $4.99/month.
Not useful Cancel anytime.
Useful kg
26.440
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Labour for fixing posts in line Mason, 1st Class Mason, 2nd Class Mazdoor (Male) Add Water charges on A @ 1% Add Contractor's profit and overheads on 'A' + 'B' + 'C @ 10% Cost for 10 posts Cost per post Sub Analysis : Plastering with CM 1:3, 12 mm thick Deduct - CM 1:3 Add - Cement (720-480 x .125) Rate for 10 sqm Rate per sqm Annexure - 'X' Details of quantities for RCC posts Concrete quantity Area of bottom A, =15+12.5/2 x 8.75+1/2 x 22/7 (6.25) = 120.31+61.38=181.69 Sq.m.
– BUILDING
day day day
0.120 0.120 0.250
10 sqm
1.000
cum cum
0.025 30.000
WORK I
Area of top A2= 10+7.5/1 x 6.25 + 1/2 x 22 x 2 (3.75) / 7= 54.69+22.10=76.79 Sq.Cm. Av A2 = 118.12 Sq. Cm. Volume = h/3(A, + A2 + VA,A2) A2+A2+A, A2=0.V03766 Sq.m Volume = 1.05/3 * 0.03766 = 0.0131810 Cu.m. =0.0132 Cu.m. Volume of lower square =0.165x0.165x0.75 =0.0204 Cu.m
portion
Total volume = 0.0336 Cu. m Quantity for 10 posts = 0.336 Cu.m Quantity of centring & shuttering 0.2770* 1.05=0.2908 Sq.m.
3x0.165x0.75=0.3712 Master your semester with Scribd 0.165x0.165=0.0272 & The New York Times 0.10 x 0.10=0.0100/0.6992 Sq.m..
Read Free Foron 30this Days Sign up to vote title
For ten posts=10 x 0.6992 = 6.992 Sq.m. Special offer for students: Only $4.99/month. Quantity
of
surface
plaster
area
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN15-7
309
– BUILDING
WORK I
Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately). Details of Cost per 100 metres (day line of wire) Materials:— Galvanised steel barbed wire IS type I weighing 9.38 Kg/100 metre
BLD-CSTN15-8
310
Carriage of barbed wire. G.I. staples steel pins or binding wire Labour :For fixing & stretching wire Blacksmith, 1st Class Blacksmith, 2nd Class Mazdoor (male). Sundries. Add water charges @ 1 % Cost for 100 metres day line of wire Rate per m Broken glass coping as specified specified on top of walls
In cement mortar 1:3 (1 cement: 3 sand) Details of cost per one Sq.m. Materials:— Broken glass. Cement mortar 1:3(1 cement: 3 sand) Labour :Mason (Skilled) Mazdoor (Male) Scaffolding etc Add water charges @ 1 % Cost per Sq.metre Special offer for students: Only $4.99/month. BLD-CSTNANTE-TERMITE TREATMENT
Master your semester with Scribd & The New York Times
kg
9.380
LS
day day day
0.150 0.150 0.300
kg cum
19.500 0.040
day day
0.080 0.160
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN16-1
311
– BUILDING
WORK I
Providing Antitermite treatment treatment as per IS 6315 (Part - 2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos/ Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/ sqm of the vertical surface & @ 5.0 Liters/ sqm of the horizontal surface of the substructure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge
Unit = 10 sqm A) Chlorpyriphos/ concentrate of 20%
Lindane
emulsifiable
1 liter : 19 Parts water Therefore: 868.55 L /20 Add 12%wastage Total Quantity B) Add Water Charges @ 1% C) Labour Charges Man Mazdoor Sprayer D) Hire charges Sprayer, drilling machine etc sundries & contingencies Water charges & electricity Special offer for students: Only $4.99/month. Add OH & CP BASIC COST per 1 sqm
Master your semester with Scribd & The New York Times
Lit
4.100
Liters
0.41 4.51 1%
day day
3.0 0.22 10%
Read Free Foron 30 Days Sign up to vote this title 3%
Not useful 1.50% Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
WORK I
UNIT 1 sqm Unsupported Roof Height up to - 3.66 M (12'0")
313
A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - 12'-0" Height
Nos
2.40
Wall Plate Brackets / beam bottom supports
Nos
1.44
Wedge Plate fixture Runner beams of approximately 4" x 4" size
Nos RM
1.44 16.00
Steel Plate - form work plates B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
sqm
1.86
day day day day
0.16 0.28 0.48 0.04 1%
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm Unsupported Roof Height up to - 4.60 M (15'0")
1% 1%
A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - 12'-0" Height
Nos
4.32
Wall Plate Brackets / beam bottom supports
Nos
1.44
Wedge Plate fixture Runner beams of approximately 4" x 4" size
Nos RM
1.44 16.00
Steel Plate - form work plates sqm 1.86 B) LABOUR CHARGES 1st Class Carpenter Nos 0.20 2nd Class Carpenter Nos 0.36 Read Free Foron 30this Days Sign up to vote title Unskilled Mazdoor Nos 0.68useful Useful Not Cancel anytime. Supervision Charges Nos 0.06 Special offer for students: Only $4.99/month. Consumables like Rope, Nails, de-shuttering 1%
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Steel Plate - form work plates B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
BLD-CSTN17-2
315
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm Providing rigid Steel centering, shuttering and scaffolding using steel pipes, adjustable Jack screw props, acro spans, couplers, tie rods, bracings members, supporting brackets, acro span beams and steel plate/ ply-wood form work as per the approved shuttering designs & plan and other accessories as per the IS Norms and stability calculations including hire charges for jack pipes, acro spans, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work
– BUILDING
sqm
1.86
Nos Nos Nos Nos
0.28 0.52 1.08 0.08 1%
WORK I
1% 1%
UNIT 1 sqm Unsupported Roof Height up to - 3.66 M (12'0") A) MATERIAL REQUIREMENT Jack Screw Adjsutable Props - 50 mm dia B Class Pipes for vertical props placed @ 3'0" c/c in bothways Approximately 33'-0" x 33'-0" roof area Span Beams - 2.4 M Long (Acro Spans) Approximtely
Master your semester with Scribd Read Free Foron 30this Days Sign up to vote title Wallers, Couplers, Couplers, Foot Plates & The New York Times - Useful Not useful Steel Plate Beam Bottom - form work plates Special offer for students: Only $4.99/month. 9" wide
230 mm wide plate x 80 RM
Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Supervision Charges Consumables like Rope, Nails, de-shuttering oil
316
day
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm Unsupported Roof Height up to - 7.32 M (24'0")
– BUILDING
WORK I
0.04 1% 1% 1%
A) MATERIAL REQUIREMENT Heavy Frames - 50 mm dia B Class Pipes (HD Towers) Span Beams - 2.4 M Long (Acro Spans) Approximtely Wallers, Couplers, Couplers, Foot Plates Steel Plate Beam Bottom - form work plates 9" wide 230 mm wide plate x 80 RM Beam Sides - form work plates - 15" wide 400 mm wide plate x 80 RM - both sides Slab Bottom Plates - formwork plates 3'-0" x 4'-0" - 7 Nos 3'-0" x 2'-0" - 2 Nos 1'-0" x 4'-0" - 1 Nos Slab Sides - 0-6" Height - 40.0 RM Total Scaffolding Pipes & Centering Plates Appx B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
Kgs
112.635
day day day day
0.32 0.52 1.28 0.06 1%
Tape, cover plates 1% Tools like Hammers etc., 1% Read Free Foron 30this Days BASIC COST per 1 sqm Sign up to vote title BLD-CSTN- 317 Providing STAGE SCAFFOLD with staging Useful Not useful Cancel anytime. 17-3 using Casurina balli props and bracings Special offer for students: Only $4.99/month. supporting wooden brackets, wooden stage
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
318
day day day day
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm - PLAN AREA Unsupported Roof Height up to - 4.60 M (15'0")
– BUILDING
WORK I
0.04 0.30 0.48 0.04 1% 1% 1%
A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - 12'-0" Height
Nos
4.32
Scaffold Boards Bamboos - 8'0" long
Nos
2.70
day day day day
0.08 0.38 0.68 0.06 1%
Bamboo
scaffolds
-
B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
319
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm - PLAN AREA Unsupported Roof Height up to - 7.30 M (24'0") A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - 12'-0" Height Scaffold Boards Bamboos - 8'0" long
Bamboo
scaffolds
-
1% 1%
Nos
5.76
Nos
2.70
B) LABOUR CHARGES 1st Class Carpenter day 0.12 2nd Class Carpenter day 0.54 Read Free Foron 30this Days Sign up to vote title Unskilled Mazdoor day Not 1.08useful Useful Cancel anytime. Supervision Charges day 0.08 Special offer for students: Only $4.99/month. Consumables like Rope, Nails, de-shuttering 1%
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Up to - 3.66 M (12'0") A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - 12'-0" Height Scaffold Boards Bamboos - 8'0" long
Bamboo
scaffolds
-
B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
BLD-CSTN17-5
321
– BUILDING
Nos
1.74
Nos
0.72
day day day day
0.07 0.11 0.2 0.04 1%
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm - VERTICAL ELEVATION AREA
WORK I
1% 1%
Providing STAGE SCAFFOLD using using Steel Scaffolding Pipe Frames made of 40 mmd ia MS Pipes and bracings with scaffold boards including hire charges for MS Pipe Frames scaffolds boards etc., and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work for PLAN AREA UNIT 1 sqm Unsupported Roof Height up to - 3.66 M (12'0") A) MATERIAL REQUIREMENT Jack Screw Adjsutable Props - 50 mm dia B Class Pipes for vertical props placed @ 3'0" c/c in bothways
Lock Pins LD Foot Plates LD Couplers Total Scaffolding Pipes - Appx B) LABOUR CHARGES Special offer for students: Only $4.99/month. 1st Class Carpenter
Master your semester with Scribd & The New York Times
Read Free Foron 30this Days Sign up to vote title
Useful
Kgs
39.26
day
0.04
Not useful Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
LD Foot Plates LD Couplers Total Scaffolding Pipes - Appx B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
BLD-CSTN17-6
323
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm - PLAN AREA Providing ACCESS SCAFFOLD using Steel Scaffolding Pipe Frames made of 40 mmd ia MS Pipes and bracings with scaffold boards including hire charges for MS Pipe Frames scaffolds boards etc., and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work for ELEVATION AREA
– BUILDING
Kgs
112.635
day day day day
0.12 0.58 1.20 0.08 1%
WORK I
1% 1%
UNIT 1 sqm Up to - 3.66 M (12'0") A) MATERIAL REQUIREMENT MS Pipe Scaffold Frames - 1.20 x 1.50 M Approximately 27.3 M Long x 3.66 M High MS Pipe Bracing structure - 1.5 x 2.25 M Scaffold Board Lock Pins LD Foot Plates LD Couplers Total Scaffolding Pipes - Appx Kgs 19.7496 B) LABOUR CHARGES 1st Class Carpenter day 0.07 2nd Class Carpenter day 0.11 Unskilled Mazdoor day 0.24 Read Free Foron 30this Days Sign up to vote title Supervision Charges day Not 0.04useful Useful Cancel anytime. Consumables like Rope, Nails, de-shuttering 1% Special offer for students: Only $4.99/month. oil
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Total Scaffolding Pipes - Appx B) LABOUR CHARGES 1st Class Carpenter 2nd Class Carpenter Unskilled Mazdoor Supervision Charges Consumables like Rope, Nails, de-shuttering oil
BLD-CSTN17-7
325
– BUILDING
Kgs
19.14
day day day day
0.12 0.22 0.44 0.04 1%
Tape, cover plates Tools like Hammers etc., BASIC COST per 1 sqm - VERTICAL ELEVATION AREA
WORK I
1% 1%
Fixing steel barricading with MS Angle Iron Pegs and GI Pipes with nuts & bolts duly excavating pits and its removal after the function is over including transporting of the entire barricading materials from the Divisional stores to the barricading site duly engaging labour to load, transport and unload the materials at barricading site & as per the schedule given by the departmental authorities and loading back into the trucks, unloading at Divisional stores, accounting for the received materials, labour for loading, unloading, fixing, handling etc, complete for finished item of work A) MATERIAL REQUIREMENT a. MS Iron Angle Posts using ISA 65x65x6 mm - 1.5 M long - 329 Nos in 1000 RM length 3015 Kgs b. GI Pipes of 32 mm dia Nominal Bore medium grade 2000 RM in 1000 RM length 6300 Kgs c. Nuts & Bolts - 329 posts x 4 Nos = 1316 Nos in a length of 1000 RM - 130 Kgs
Master your semester with Scribd Total Barricading Weight - Appx (if departmental material is used & The New York Times charges shall be calculated)
Special offer for students: Only $4.99/month.
B) LABOUR CHARGES
9445 Kgs Read Free Foron 30 Days Sign up to vote this title no hire Useful
Not useful Cancel anytime.
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
BLD-CSTN17-8
326
– BUILDING
WORK I
Providing barricading arrangement with casurina ballies as per the design duly excavating pits and its removal after the function is over including hire charges of the barricading materials as per the schedule given by the departmental authorities complete for finished item of work 2 - TIER (2 Nos Horizontals- 6'-0" long - 1 No Vertical -4'-0" High) A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - (50 Nos-4 RM & 55 Nos-2 RM = 200+110=310 RM/3.66 = 85 Nos, if 12'-0" long ballies are used)
BLD-CSTN17-9
327
B) LABOUR CHARGES Unskilled Mazdoor Consumables like Rope, Nails Conveyance, loading & unloading etc Tools like Hammers etc., BASIC COST per 100 RM 3 - TIER (3 Nos Horizontals- 6'-0" long - 1 No Vertical -4'-0" High) A) MATERIAL REQUIREMENT Casurina Balli Props - 3" to 4" dia - (75 Nos-4 RM & 55 Nos-2 RM = 300+110=410 RM/3.66 = 112 Nos, if 12'-0" long ballies are used) B) LABOUR CHARGES Unskilled Mazdoor Consumables like Rope, Nails Conveyance, loading & unloading etc Tools like Hammers etc., BASIC COST per 100 RM
BLD-CSTN17-10
Nos
85
day
12 1% 1% 1%
Nos
130
day
12.5 1% 1% 1%
328
Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and Read Free Foron 30this Days Sign up to vote title compacted as directed for filling sunken floors including cost and conveyance of all Useful Not useful Cancel anytime. materials, water to work site, seigniorage Special offer for students: Only $4.99/month. charges and all operational, incidental, labour
Master your semester with Scribd & The New York Times
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music HIRE & LIFT CHARGES - for all Scaffolding Materials a
Casurina Ballies, Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Wall Plates etc., etc., (As per relevant data item) Cost of Scaffolding Scaffolding materials = Rs. A Scrap value of Scaffolding materials = Rs. B (Usually B = A * 10%) Number of uses of Scaffolding materials = U
(Rs. A - Rs Therefore, Hire Charges of scaffolding Materials: b
Steel scaffolding pipes, jack Props, wallers, Foot plates, plates, brackets, steel steel Centering Plates,etc., Plates,etc., (As per relevant data item) item) Cost of Scaffolding materials = Rs. A Scrap value of Scaffolding materials = Rs. B (Usually B = A * 10%) Period of Hire of Scaffolding materials, in years = C Life of Scaffolding materials, in years = D
[(Rs. A - Rs. Therefore, Hire Charges of scaffolding Materials: 1 H L
Sl
RATE ANALYSIS FOR HIRE CHARGES OF CENTRING & SCAFFOLDING MATERIALS FOR ALL R.C.C. STRUCTURAL MEMBERS - ANY HEIGHT Rs. Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 Rs. Labour Charges
NAME OF THE STRUCTURE COMPONENT (b)
Qty
Unit
(a) 1
FOOTINGS
(c) 3.880
(d) sqm
2
PEDESTALS
6.170
sqm
3
PLINTH BEAMS
9.350
sqm
4
LINTELS
7.940
sqm
5
CHAJJAS - SUNSHADES
1.220
sqm
6
COLUMNS
11.150
sqm
Hire Charges H (e)
Labour Charges L (f)
SubTotal (H + L) (g)
Duty Factor C1 C1 (h)
Centring Charges (c)*(g)*(h) (i)
Unit of Measu
per 1 cum membe per 1 cum membe per 1 cum membe per 1 cum membe per 1 sqm membe per 1 cum
STANDARD DATA BOOK
7
BEAMS
9.350
sqm
8
SLABS SLABS - Up to 150 mm thick
1.050
sqm
Master your semester with Scribd & The New York Times 9
SLABS - above 150 mm - Up to 300 mm thick
1.090
sqm
10
SLABS - above 300 mm thick
1.140
sqm
11
WAFFLE(GRID)SLABS(Rib WAFFLE(GRID)SLABS(Rib Beams with Slabs)
3.850
sqm
2.700
sqm
Special offer for12students: Only $4.99/month. PERGOLA SLABS (Only Rib Beams)
Read Free Foron 30this Days Sign up to vote title
Useful
Not useful
Cancel anytime.
– BUILDING
membe per 1 cum membe per 1 sqm membe per 1 sqm membe per 1 sqm membe per 1 sqm membe per 1 sqm membe
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music 7
BEAMS
9.350
sqm
8
SLABS SLABS - Up to 150 mm thick
1.050
sqm
9
SLABS - above 150 mm - Up to 300 mm thick
1.090
sqm
10
SLABS - above 300 mm thick
1.140
sqm
11
WAFFLE(GRID)SLABS(Rib WAFFLE(GRID)SLABS(Rib Beams with Slabs)
3.850
sqm
12
PERGOLA SLABS (Only Rib Beams)
2.700
sqm
13
ARCHE BEAMS - up to 1.5 M Span
10.630
sqm
14
ARCHE BEAMS - above 1.5 M Span
10.780
sqm
15
DOME SLABS
17.190
sqm
16
HELICAL STAIRCASES
1.310
sqm
membe per 1 cum membe per 1 sqm membe per 1 sqm membe per 1 sqm membe per 1 sqm membe per 1 sqm membe per 1 cum membe per 1 cum membe per 1 cum membe per 1 sqm membe
STANDARD DATA BOOK
2
– BUILDING
RATE ANALYSIS FOR HIRE CHARGES SCAFFOLDING MATERIALS FOR BRICK & STONE MASONRY H L
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Access Scaffold items Labour Charges - as per Access Scaffolds items
Sl
SCAFFOLDING SCAFFOLDING CHARGES FOR BRICK / STONE MASONRY
Master your semester with Scribd & The New York Times (a) (b) 1 1st Floor Special offer for students: Only $4.99/month. 2 2nd Floor
Qty
(c) 1.00 1.00
Unit (d) sqm sqm
Hire Charges H (e)
Rs. Rs.
Duty Labour Charges Sign upLift toCharges vote on Factor this title C1
Read Free For 30 Days
L (f)
(f) * (g) C1 (g)Useful Not useful (h)anytime. (i) Cancel 100% 150%
Scaffolding C
[(e)+(h)]*
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music 2
RATE ANALYSIS FOR HIRE CHARGES SCAFFOLDING MATERIALS FOR BRICK & STONE MASONRY H L
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Access Scaffold items Labour Charges - as per Access Scaffolds items
Sl
SCAFFOLDING SCAFFOLDING CHARGES FOR BRICK / STONE MASONRY
(a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(b) 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 7th Floor 8th Floor 9th Floor 10th Floor 11th Floor 12th Floor 13th Floor 14th Floor 15th Floor
16
....
Qty
Unit
(c) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
(d) sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm
...
Hire Charges H (e)
...
Labour Charges L (f)
(g) 100% 150% 200% 250% 300% 350% 400% 450% 500% 550% 600% 650% 700% 750% 800%
Rs. Rs.
Lift Charges
Duty Factor C1
(f) * (g) (h)
C1 (i)
Scaffolding C
[(e)+(h)]*
...
STANDARD DATA BOOK
3
– BUILDING
RATE ANALYSIS FOR HIRE CHARGES OF SCAFFOLDING MATERIALS FOR WALL PLASTERINGS, RCM WORKS - ANY THICK
Master your semester with Scribd & The New York Times H
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Access Scaffold items
Rs.
L
Labour Charges - as per Access Scaffolds items
Rs.
Special offer for students: Only $4.99/month.
Hire
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Duty
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music
3
RATE ANALYSIS FOR HIRE CHARGES OF SCAFFOLDING MATERIALS FOR WALL PLASTERINGS, RCM WORKS - ANY THICK H
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Access Scaffold items
Rs.
L
Labour Charges - as per Access Scaffolds items
Rs.
Sl
SCAFFOLDING SCAFFOLDING CHARGES FOR BRICK / STONE MASONRY
(a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(b) 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 7th Floor 8th Floor 9th Floor 10th Floor 11th Floor 12th Floor 13th Floor 14th Floor 15th Floor
16
....
Qty
Unit
(c) 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
(d) sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm
...
Hire Charges H (e)
Labour Charges L (f)
...
(g) 100% 150% 200% 250% 300% 350% 400% 450% 500% 550% 600% 650% 700% 750% 800%
Lift Charges
Duty Factor C1
(f) * (g) (h)
C1 (i)
Scaffolding C
[(e)+(h)]*
...
STANDARD DATA BOOK
4
– BUILDING
RATE ANALYSIS FOR HIRE CHARGES OF SCAFFOLDING MATERIALS FOR CEILING PLASTERINGS - ANY THICK H L
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Stage Scaffold items Labour Charges - as per Stage Scaffolds items
Sl
SCAFFOLDING SCAFFOLDING CHARGES FOR BRICK / STONE MASONRY
Master your semester with Scribd & The New York Times (a) (b) 1 1st Floor Special offer for students: Only $4.99/month. 2 2nd Floor
Qty
(c) 10.00 10.00
Unit (d) sqm sqm
Hire Charges H (e)
Rs. Rs.
Duty Labour Charges Sign upLift toCharges vote on Factor this title C1
Read Free For 30 Days
L (f)
(f) * (g) C1 (g)Useful Not useful (h)anytime. (i) Cancel 100% 150%
Scaffolding C
[(e)+(h)]*
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music
4
RATE ANALYSIS FOR HIRE CHARGES OF SCAFFOLDING MATERIALS FOR CEILING PLASTERINGS - ANY THICK H L
Hire Charges of Steel scaffolding: a/365 (OR) Wooden scaffolding: b/10 - as per Stage Scaffold items Labour Charges - as per Stage Scaffolds items
Sl
SCAFFOLDING SCAFFOLDING CHARGES FOR BRICK / STONE MASONRY
(a) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(b) 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 7th Floor 8th Floor 9th Floor 10th Floor 11th Floor 12th Floor 13th Floor 14th Floor 15th Floor
16
....
Qty
Unit
(c) 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
(d) sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm
...
Hire Charges H (e)
...
Labour Charges L (f)
(g) 100% 150% 200% 250% 300% 350% 400% 450% 500% 550% 600% 650% 700% 750% 800%
Rs. Rs.
Lift Charges
Duty Factor C1
(f) * (g) (h)
C1 (i)
Scaffolding C
[(e)+(h)]*
...
STANDARD DATA BOOK
Note 1 2 a b c
For Material Lift Charges & Labour rate for scaffolding above 7.32 M - increase increase @ 50% on labour component for each upper floor on First Floor Rate (7.32 M)
For Hire Charges of scaffolding scaffolding Materials Materials following ratesmay be allowed: Number of uses of Scaffolding materials materials (C ) Wooden Materials - No No of Uses - 10 Times (C) Period of Hire of Steel Scaffolding materials, materials, in years years = 1.64 (C ) d Life of Steel Steel Forms Forms & Scaffolding Material Material - 3 Years (D) for students: Only $4.99/month. e Duty Factor - Steel Scaffolding C1 0.500 f Duty Factor Wooden Scaffolding C1 0.333
Master your semester with Scribd & The New York Times Special offer
– BUILDING
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music Note 1 2 a b c d e f 3
For Material Lift Charges & Labour rate for scaffolding above 7.32 M - increase increase @ 50% on labour component for each upper floor on First Floor Rate (7.32 M) For Hire Charges of scaffolding scaffolding Materials Materials following ratesmay be allowed: Number of uses of Scaffolding materials materials (C ) Wooden Materials - No No of Uses - 10 Times (C) Period of Hire of Steel Scaffolding materials, materials, in years years = 1.64 (C ) Life of Steel Steel Forms Forms & Scaffolding Material Material - 3 Years (D) Duty Factor - Steel Scaffolding C1 0.500 Duty Factor - Wooden Scaffolding C1 0.333 Add Area Allowances as applicable on labour charges
STANDARD DATA BOOK
5
– BUILDING
RATE ANALYSIS FOR HIRE CHARGES OF BARRICADING MATERIALS a
Casurina Ballies (As per relevant data item) Cost of Barricading Barricading materials materials = Rs. A Scrap value of Barricading materials = Rs. B (Usually B = A * 10%) Number of uses of Barricading materials = U
Master your semester with Scribd & The New York Times Therefore, Hire Charges of Barricading Materials:
Steel Barricading Barrica ding $4.99/month. G.I. Pipes, Mild Steel IS Angles (As (As per relevant data data item) Special offer forb students: Only Cost of Barricading materials materials = Rs. A Scrap value of Barricading materials = Rs. B (Usually B = A * 10%)
Read Free Foron 30this Days Sign up to vote title
Useful
Not useful
Cancel anytime.
(Rs. A - Rs
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music 5
RATE ANALYSIS FOR HIRE CHARGES OF BARRICADING MATERIALS a
Casurina Ballies (As per relevant data item) Cost of Barricading Barricading materials materials = Rs. A Scrap value of Barricading materials = Rs. B (Usually B = A * 10%) Number of uses of Barricading materials = U
(Rs. A - Rs Therefore, Hire Charges of Barricading Materials: b
Steel Barricading Barricading G.I. Pipes, Mild Steel IS Angles (As (As per relevant data data item) Cost of Barricading materials materials = Rs. A Scrap value of Barricading materials = Rs. B (Usually B = A * 10%) Period of Hire of Barricading materials, in years = C Life of Barricading materials, in years = D
[(Rs. A - Rs. Therefore, Hire Charges of Barricading Materials: H L
Sl
NAME OF THE STRUCTURE COMPONENT
Qty
Unit
(a) 1
(b)
(c) 1000.00
(d) RM
100.00 100.00
RM RM
3 4
Rs. Rs.
Hire Charges of Steel Barricading: a/365 (OR) Wooden Barricading: b/10 - as per Barricading Item Labour Charges: as per Barricading work data items
STEEL BARRICADING WOODEN BARRICADING 2 - TIER 3 - TIER
Hire Charges
No of Days of Hire
Duty Factor
MaterialHire charges
Labour Charges
H (e)
R (f)
C1 (g)
(e*f*g) (h)
L (i)
Barricading C (h)
STANDARD DATA BOOK
– BUILDING
Note 1
25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of the work for payment. The night time allowance is applicable only to the works done under Greater Hyderabad Municipal Corporation limits only 2 For Hire Charges of Barricading Materials following ratesmay be allowed: a Number of uses of woodenBarricading Sign up to vote on this title materials (U ) Useful Not useful b Wooden Materials - No No of Uses - 10 Times (U) Cancel anytime. c Period of Hire of Steel Barricading materials, in years = for students: Only $4.99/month. 1.64 (C ) d Life of Steel Steel Forms & Barricading Material Material - 3
Master your semester with Scribd & The New York Times Special offer
Read Free For 30 Days
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
21
12K views
Upload
Sign In
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music Note 1
2 a b c d e f 3
25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of the work for payment. The night time allowance is applicable only to the works done under Greater Hyderabad Municipal Corporation limits only For Hire Charges of Barricading Materials following ratesmay be allowed: Number of uses of woodenBarricading materials (U ) Wooden Materials - No No of Uses - 10 Times (U) Period of Hire of Steel Barricading materials, in years = 1.64 (C ) Life of Steel Steel Forms & Barricading Material Material - 3 Years (D) Duty Factor - Steel Barricading C1 0.500 Duty Factor - Wooden Barricading C1 0.333 Add Area Allowances as applicable on labour charges
STANDARD DATA BOOK
– BUILDING
LIFT CHARGES FOR ALL ITEMS OF WORKS 6
LIFT CHARGES - for all RCC Items
Master your semester with Scribd & The New York Times
1. For Lift Charges of Labour, increase @ 10% on labour charges for each upper f loor on Ground Floor Rate 2. For Lift Charges of Materials only, for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges may be Sign up to vote on this title allowed at following rates:
Special offer for students: Only $4.99/month.
Description of Structure
Basic Rate for 2nd Floor (7.32 M)
Read Free For 30 Days
Useful Not useful Cancel anytime. for each additional floor (3.66 M) over and above 2nd
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Download
Venkat Apdss printing
1
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– BUILDING
Sheet Music LIFT CHARGES FOR ALL ITEMS OF WORKS 6
LIFT CHARGES - for all RCC Items 1. For Lift Charges of Labour, increase @ 10% on labour charges for each upper f loor on Ground Floor Rate 2. For Lift Charges of Materials only, for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges may be allowed at following rates:
Description of Structure a. FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) b. COLUMNS, LINTELS, WATER TANKS, RCC WALLS c. RCC SLABS, BEAMS
8
Basic Rate for 2nd Floor (7.32 M) Nil 1.333 0.267
Hrs Hrs
for each additional floor (3.66 M) over and above 2nd floor (7.32 M) Nil 10% 10%
LIFT CHARGES - for Brick Masonry, all Plastering items, all Flooring items, HYSD Steel fabrication, impervious coats, RCM Works 1
For Lift Charges of Labour, increase @ 10% on labour charges of respective respective item for each each upper floor on Ground Floor Rate
2
Add Area Allowances as applicable on labour charges
9 1 2
LIFT CHARGES - for Scaffolding Works For Lift Charges of Labour, increase @ 50% on labour charges of respective respective item for each each upper floor on Ground Floor Rate Add Area Allowances as applicable on labour charges
STANDARD DATA BOOK
– LEAD
LEAD/LIFT/LOADING & UNLOADING CHARGES
Master your semester with Scribd DATA FOR LEAD CHARGES BY HEAD COM-LDLFT-1 & The New York Times LOAD : Special offer for students: Only $4.99/month.
Earth / Sand / Gravel / Murrum /
Unit
Quantity
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Rate Rs.
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
LEAD/LIFT/LOADING & UNLOADING CHARGES Unit
Quantity
day
1
day
2
day
1
Rate Rs.
DATA FOR LEAD CHARGES BY HEAD LOAD : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone
COM-LDLFT-1
1
LEAD UP TO 100 m A) LABOUR Mazdoor Cost for 7 cum = Contractor's profit and overhead charges RATE PER 1 CUM
2
LEAD UP TO 150 m A) LABOUR Mazdoor Cost for 7 cum = Contractor's profit and overhead charges RATE PER 1 CUM Cement/ HYSD Steel/ Structural steel
3
LEAD UP TO 100 m A) LABOUR Mazdoor Cost for 12 MT = Contractor's profit and overhead charges
RATE PER 1 MT Master your semester with Scribd 4 LEAD UP TO 150 m & The New York Times A) LABOUR
Special offer for students: Only $4.99/month.
Mazdoor
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
day
2
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
RATE PER 1 CUM
6
LEAD UP TO 150 m A) LABOUR Mazdoor Cost for 5.5 cum = Contractor's profit and overhead charges
day
2
Hr Hr Hr
0.15 0.15 0.15
Hr Hr Hr
0.21 0.21 0.21
RATE PER 1 CUM (Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading and hire charges of machinery
COM-LDLFT-2
Earth / Sand / Gravel / Murrum / Lime / Surki /Coarse aggregate / Rubble stone / Size stone / Cut stone
7
LEAD UP TO 1 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 5 cum = Contractor's profit and overhead charges RATE PER 1 CUM
8
LEAD UP TO 1 to 2 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 5 cum = Contractor's profit and overhead charges
Master your semester with Scribd RATE PER 1 CUM & The New York Times Special offer for students: Only $4.99/month. 9 LEAD UP TO 2 to 3 KM
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
Cost for 5 cum = Contractor's profit and overhead charges RATE PER 1 CUM
11
LEAD UP TO 4 to 5 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 5 cum = Contractor's profit and overhead charges
Hr Hr Hr
0.40 0.40 0.40
Hr Hr Hr
0.06 0.06 0.06
Hr Hr Hr
0.05 0.05 0.05
RATE PER 1 CUM
12
LEAD UPTO UPTO 5 to 30 KM/ EVERY KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 5 cum = Contractor's profit and overhead charges RATE PER 1 CUM
13
LEAD BEYOND 30 KM/ EVERY KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 5 cum = Contractor's profit and overhead charges RATE PER 1 CUM
Master your semester with Scribd Cement/ Steel/ Pipes/ RCC poles/ & The New York Times AC & GI sheets/ Packed materials
Special offer for students: Only $4.99/month. 14 LEAD UP TO 1 KM
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
Crew charges Cost for 8 MT = Contractor's profit and overhead charges
Hr
0.21
Hr Hr Hr
0.28 0.28 0.28
Hr Hr Hr
0.34 0.34 0.34
Hr Hr Hr
0.40 0.40 0.40
– LEAD
RATE PER 1 MT
16
LEAD UP TO 2 to 3 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 8 MT = Contractor's profit and overhead charges RATE PER 1 MT
17
LEAD UP TO 3 to 4 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 8 MT = Contractor's profit and overhead charges RATE PER 1 MT
18
LEAD UP TO 4 to 5 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 8 MT = Contractor's profit and overhead charges
RATE PER 1 MT Scribd Master your semester with 19 LEAD UPTO UPTO 5 to 30 KM/ EVERY & The New York Times
KM Special offer for students: Only $4.99/month.
A) HIRE CHARGES
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
Cost for 8 MT = Contractor's profit and overhead charges RATE PER 1 MT PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood
21
LEAD UP TO 1 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 3.4 CUM = Contractor's profit and overhead charges
Hr Hr Hr
0.15 0.15 0.15
Hr Hr Hr
0.21 0.21 0.21
Hr Hr Hr
0.28 0.28 0.28
RATE PER 1 CUM
22
LEAD UP TO 1 to 2 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 3.4 CUM = Contractor's profit and overhead charges RATE PER 1 CUM
23
LEAD UP TO 2 to 3 KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 3.4 CUM = Contractor's profit and overhead charges
Master your semester with Scribd RATE PER 1 CUM & The New York Times 24 LEAD UP TO 3 to 4 KM Special offer for students: Only $4.99/month. A) HIRE CHARGES
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
Cost for 3.4 CUM = Contractor's profit and overhead charges RATE PER 1 CUM
26
LEAD UPTO UPTO 5 to 30 KM/ EVERY KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 3.4 CUM = Contractor's profit and overhead charges
Hr Hr Hr
0.06 0.06 0.06
Hr Hr Hr
0.05 0.05 0.05
Hr Hr Hr
0.15 0.15 0.15
RATE PER 1 CUM
27
LEAD BEYOND 30 KM/ EVERY KM A) HIRE CHARGES Tipper charges Fuel Charges Crew charges Cost for 3.4 CUM = Contractor's profit and overhead charges RATE PER 1 CUM WATER
28
LEAD UP TO 1 KM A) HIRE CHARGES Water Tanker Charges Fuel Charges Crew charges Cost for 8000 Litres = Contractor's profit and overhead charges
Master your semester with Scribd RATE PER 1000 Litres & The New York Times 29 LEAD UP TO 1 to 2 KM Special offer for students: Only $4.99/month. A) HIRE CHARGES
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
Cost for 8000 Litres = Contractor's profit and overhead charges RATE PER 1000 Litres
31
LEAD UP TO 3 to 4 KM A) HIRE CHARGES Water Tanker Charges Fuel Charges Crew charges Cost for 8000 Litres = Contractor's profit and overhead charges
Hr Hr Hr
0.34 0.34 0.34
Hr Hr Hr
0.40 0.40 0.40
Hr Hr Hr
0.06 0.06 0.06
RATE PER 1000 Litres
32
LEAD UP TO 4 to 5 KM A) HIRE CHARGES Water Tanker Charges Fuel Charges Crew charges Cost for 8000 Litres = Contractor's profit and overhead charges RATE PER 1000 Litres
33
LEAD UPTO UPTO 5 to 30 KM/ EVERY KM A) HIRE CHARGES Water Tanker Charges Fuel Charges Crew charges Cost for 8000 Litres = Contractor's profit and overhead charges RATE PER 1000 Litres
Master your semester with Scribd 34 LEAD BEYOND 30 KM/ EVERY KM & The New York Times A) HIRE CHARGES Special offer for students: Only $4.99/month.
Water Tanker Charges
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful Hr
0.05
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
Cost for 3000 Nos = Contractor's profit and overhead charges RATE PER 1000 Nos
36
LEAD UP TO 1 to 2 KM A) HIRE CHARGES Truck 10 T Charges Fuel Charges Crew charges Cost for 3000 Nos = Contractor's profit and overhead charges
Hr Hr Hr
0.21 0.21 0.21
Hr Hr Hr
0.28 0.28 0.28
Hr Hr Hr
0.34 0.34 0.34
RATE PER 1000 Nos
37
LEAD UP TO 2 to 3 KM A) HIRE CHARGES Truck 10 T Charges Fuel Charges Crew charges Cost for 3000 Nos = Contractor's profit and overhead charges RATE PER 1000 Nos
38
LEAD UP TO 3 to 4 KM A) HIRE CHARGES Truck 10 T Charges Fuel Charges Crew charges Cost for 3000 Nos = Contractor's profit and overhead charges RATE PER 1000 Nos
Master your semester with Scribd 39 LEAD UP TO 4 to 5 KM A) HIRE CHARGES & The New York Times Truck 10 T Charges Special offer for students: Only $4.99/month. Fuel Charges
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful Hr Hr
0.40 0.40
CHA
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join
Search
Home
Saved
12K views
21
Sign In
Upload
Join
RELATED TITLES
0
AndhraPradesh Revisied Standard Data Book
Uploaded by joechand
Books
Audiobooks
Magazines
News
Documents
Sheet Music
AndhraPradesh Revisied Standard Data Book
Save
Embed
Share
Print
Venkat Apdss printing
1
Download
of 317
MORTH AP Revised StandardDataBook Standard Data
Search document
STANDARD DATA BOOK
– LEAD
CHA
Contractor's profit and overhead charges RATE PER 1000 Nos
41
LEAD BEYOND 30 KM/ EVERY KM A) HIRE CHARGES Truck 10 T Charges Fuel Charges Crew charges Cost for 3000 Nos = Contractor's profit and overhead charges
Hr Hr Hr
0.05 0.05 0.05
RATE PER 1000 Nos
COM-LDLFT-3
LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle hire charges are not added) 42
LOADING Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m Unit = cum Taking output = 5.5 cum A) LABOUR Head Mazdoor Mazdoor Contractor's profit and overhead charges
day day
0.02 0.50
RATE PER 1 CUM
43
UNLOADING 50% of the loading charges i.e., RATE PER 1 CUM
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month. 44 LOADING
Loading of Earth, Sand, Murrum,
Read Free Foron 30this Days Sign up to vote title
Not useful Cancel anytime.
Useful
Home
Saved
Books
Audiobooks
Magazines
News
Documents
Sheet Music
Master your semester with Scribd & The New York Times Special offer for students: Only $4.99/month.
Upload
Sign In
Read Free For 30 Days Cancel anytime.
Join