The aim of the present work was to develop a safe and reliable roll pass design for producing ribbed bars. For this purpose slit rolling method with use of dog-bone and slit-pass grooves was appl...
ACI- CONCRETE INTERNATIONAL DETAILING CORNERS
Deskripsi lengkap
Descrição completa
sanatateDescrição completa
Full description
tarea completaDescripción completa
Access Bars PointsDescrição completa
Full description
Catalogue high strength barsFull description
Anchorage of reinforcing barsFull description
sanatateDescripción completa
Descrição completa
Real Challenges for Civil Engineers – No.02 Client requirement – Build up another floor on top of existing slab Engineering challenge – Introduce starter bars for columns or walls
+ew column or wall
Existing Beam Existing *lab
Conventional Method – Break the existing beam to the extent of anchorage length of proposed column or wall reinforcement Problems Encountered Encountered
1 Breaking of concrete slab and beam ma! weaken the structure " #ther structures ma! affect due to vibration while concrete breaking $ Minimum % da!s will be taken to complete the task % &isk for the 'ob ( )igh cost and time incurred at the end of the 'ob
New Method introduced by the HI!I with the develo"#ent of !echnology ,rill holes to the existing concrete beam and fix reinforcement with HI!I RE $00 %R HI!I H& '$0 bonding agent Advantages
1 +o concrete breaking is required " +o vibration hence no chance to develop cracks $ Maximum 1 da! to complete the total task % -ow cost . less than &s1(/0 to fix 21/ bar at nominal embedment depth 3 ( 4pplication is so simple and no chance for mistakes – (ero hu#an errors 5 +o risk for the 'ob 6 7ullout test will be done b! HI!I Engineers before concreting to ensure the strength 8 4ll technical support will be given b! HI!I Engineers
Method state#ent 1 " $ % ( 5
Consult !our structural Engineer for the design of column or wall reinforcement Calculate the stress to be developed in the reinforcement due to moment Call HI!I Engineer to get instruction for reinforcement fixing ,rill holes to specified diameter and depth Clean holes with blow out pump provided Insert HI!I RE $00 %R HI!I H& '$0 chemical with the use of dispenser provided . +o hand mixing3 6 Insert the reinforcement bars and keep 8 hrs for RE $00 #& %/ minutes for H& '$0 to cure 8 4rrange reinforcement as usual 9 &oughen the concrete surface and appl! an! bonding agent if necessar! and do the concreting as usual
)a#"le calculation *ssu#"tions + Concrete grade "(+0mm" • Existing column si:e "6/ ; "6/ mm and clear cover $/mm • *imilar si:e column to be on top • Moment develop at the support of new column M < "/ k+m •
M<=>? where = < ultimate tension develop in the reinforcement at the connection ? < lever arm < /66(d < /66(."6/ – $/3 < 185 mm = < M0? < "/ 0 /185 < 1/6( k+ . for " bars of the column 3
Check for concrete / bond failure 4ssume "215 to be introduced with HI!I RE $00 as bonding agent and embedment depth of $//mm Existing bars
+ew bars to introduce
1(/mm
"6/mm
4ccording to the HI!I specifications for embedment depth of $//mm =ension capacit! of "215 bar with RE $00 < " ; %$6 x $//01(/ x 1// x /8 < 1$98 @ 1/6( k+ )ence application is satisfactory with *afet! Aactor of 1$9801/6( < 1$