JSA for Piping Fabrication and InstallationFull description
JSA ChevronFull description
Description : Risk Management
Job Safety Analysis/ Job Hazard Analysis for the use of hand tools
contoh JSA OSHAFull description
Keselmatan alat angkat dan angkut
las..Deskripsi lengkap
las..
Deskripsi lengkap
chipping
jsa radioFull description
PondasiDeskripsi lengkap
craneDeskripsi lengkap
Full description
JSA Splicing
fapfapFull description
Full description
Untuk panduan membuat JSA (JOB SAFETY ANALYSIS)
JSA
metode jsa
JOB SAFETY ANALYSIS (JSA) ANALIS KERJA AMAN (Commissioning) Date Tanggal
02-APRIL-2016
Time Waktu
Project Proyek
Yamal LNG
Company Perusahaan
Siemens
Work Location Lokasi Kerja
PAB 030 PAB 030
Supervisor Pengawas
Dani Ramdani
Task / Pekerjaan: Pekerjaan: Instalation Volt Meter N ormaly Room & Essential Room Inter Loop Panel LV Switch Board 0,4kv Normaly Room & Essential Room Inter Loop Loop Panel MV Switch Switch Geard Geard 6,6kv Normaly Room & Essential Room Inter Loop Loop Panel MV Switch Switch Geard Geard 6,6kv Normaly Room & Essential Room
Put a cross sign (X) in the following column □/ Berilah tanda silang (X) pada kolom □ berikut ini: Area of work involved /Daerah /Daerah kerja yang terlibat: At closing room/ Di ruang tertutup atau sempit At open yard/ Di ruang terbuka
X At Workshop/ Di ruang kerja Other/Lain-lain Other/Lain-lain:: ………………………
Tools and equipment involved/ Alat kerja yang terlibat : At close water/ Di dekat air
1.
Name Nama
6.
On the vessel/ Di atas kapal
2.
Electrical Handtools
7.
At height / Di ketinggian
3.
Primary Injector Omicron CPC100
8.
…………………………………. ………………………………….
4.
Power Supply 220VAC/110VDC
9.
Precommissioning Work
No
Multimeter
5.
Work Personnel Members/ Anggota Members/ Anggota Kelompok Kerja Designation Name No Jabatan Nama
10.
Designation Jabatan
1
AKBAR SYAWALUDIN
COMMISSIONING
3
ZAINAL ARIFIN
COMMISSIONING
2
SUCIPTO
COMMISSIONING
4
LAHMOT PAKPAHAN
COMMISSIONING
Pages(s): 1 Form: SIE-HSE-005-F11 Rev.01
JOB SAFETY ANALYSIS (JSA) ANALIS KERJA AMAN (Commissioning) 5
KARISMA
COMMISSIONING
9
RONY THAMRIN
COMMISSIONING
6
PARLIN
COMMISSIONING
10
FERY BUDIANTO
COMMISSIONING
7
NATALIA KRISTIANTO
COMMISSIONING
11
M, OKI
COMMISSIONING
8
NANA SUBARNA
COMMISSIONING
12
SUTRISNO
COMMISSIONING
No/ No
Job Steps Tahapan Pekerjaan
1
Prepare Materials and tools
2
Visual inspection
3
Power up control supply MV panels (110VDC)
Potential Hazards Potensi Bahaya
Risk Resiko
Mishandling of the materials & tools
Hand and other body parts injury
Mishandling of the material
Hand and other body parts injury
Mishandling of termination KIT
Damage material
Electricity
Hand and other body parts injury
Short Circuit
Electric Shock
Mishandling of equipment
Equipment damage
Control Measures Tindakan Pengendalian
Completion Date Tanggal Pemenuhan
Always use PPE
Ensure proper materials & tools handling. Always use hand gloves while doing the installation Electrician should be well trainer to perform the installation and use PPE Ensure proper cable handling. Always use hand gloves while doing the cable termination works Ensure correct power terminal connection and no ground fault Put barricade on working area
Pages(s): 2 Form: SIE-HSE-005-F11 Rev.01
JOB SAFETY ANALYSIS (JSA) ANALIS KERJA AMAN (Commissioning) Electrician should be well trainer to perform termination and power up works and use PPE
4
Test CT & VT MV panels
Electricity
Hand and other body parts injury
Short Circuit
Electric Shock
Mishandling of equipment
Equipment damage
Ensure proper cable handling. Always use hand gloves while doing the cable termination works Ensure correct power terminal connection and no ground fault Put barricade on working area Electrician should be well trainer to perform termination and power up works and use PPE