GENERAL GUIDELINES THIS DEPAR DEPARTMENT TMENT ORDER SETS THE FORMULATION FORMULATION OF POLICIES, RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE “APPROVED BUDGET FOR THE CONTRACT” (ABC) ISSUED (ABC) ISSUED FOR THE GUIDANCE OF ALL CONCERNED. ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDA ACCORDANCE NCE WITH DPWH STANDARD SPECIFICATIONS.
COST ESTIMATES (D0 ! S.2002)
INDIRECT COST
DIRECT COST
A. OVERHEAD E$PENSES - ( /! CEILING) DIRECT COST. ". ENGINEERING % ADMINISTRATIVE ADMINISTRATIVE SUPERVISION 2. TRANSP TRANSPORTAT ORTATION ION ALLOWANCES '. OFFICE E$PENSES (E+PT % SUPPLIES) . CONTRACTORS CONTRACTORS ALL RISK INSURANCE . FINANCING FINANCING COST INCL. /PREMIUM ON BID SECURIT# /PREMIUM ON PERFORMANCE SECURIT# /PREMIUMCHARGES ON CREDIT LINES /COST OF MONE# TO FINANCE THE PRO& PRO&..
A. COST OF MATERIALS ". COST AT SOURCE, INCL. PROCESSING PROCESSING RO#ALTIES, RO# ALTIES, LOCAL TA$ES % ETC. 2. E$PENSES FOR HAULING HAULING TO PRO&. SITE '. HANDLING E$PENSES . STORAGE . ALLOWANCE ALLOWANCE FOR WASTEOR LOSSES
B. COST OF LABOR ". SALARIES % WAGES AS AUTHORI*ED AUTHORI*ED B# DOLE 2. FRINGE BENEFITS SUCH AS VACATION VACATION % SICK LEAVES, GSIS % SSS CONTR. ALLOWANCES, BONUSES AND ETC.
B. CONTINGENC# - '/ OF DC. DC . C. MISCELLANEOUS - " OF DC. INCLUDES LABORATOR# TEST TEST..
C. E+UIPMENT E$PENSES ". RENTAL RATE SHALL BE BASED ON ACEL RATE AS APPRVD B# DPWH . OPERATED RENTAL RATE ARE PREFERRED OVER BARE RENTAL RATE 2. MOB.DEMOB OF E+UIPMENT SHALL SHALL BE ON CASE TO CASE BASIS BUT IN NO CASE E$CEED " OF TOTAL CIVIL WORK ITEMS.
D. CONTRACTORS PROFIT EST. DIRECT COST
OCM
UP TO P"M.
"'
ABOVE P"M/M ABOVE PM/"0M
PROFIT MOBDEMOB MOBDEMOB MA$. TOTAL TOTAL 2
"
"
"2
"
"
2!
"2
"'
ABOVE P"0M/20M
""
"2
" "
2
ABOVE P20M/0M
""
""
"
2'
ABOVE P0M
"0
"0
"
2"
VAT VA T
'/ PM F11
2
“ THOSE WHO PREPAREDREVIEWEDCHECKED THE ESTIMATES SHALL SEE TO IT THAT IN CASE THE# ARE CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THE# CAN PERFORM THE &OB THEMSELVES AT THE COST THE# HAVE GENERATED.”
PURPOSE THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO BE FOLLOWED B# ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF LABOR AND EMPLO#MENT D.O. N. "'(DOLE D.O. N."'), SERIES OF "8 OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFET# AND HEALTH IN THE CONSTRUCTION INDUSTR#” , WITH EMPHASIS GIVEN ON THE METHODOLOG# TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFET# AND HEALTH PROGRAM AS RE+UIRED IN SECTION "!. GENERAL GUIDELINES IN COMPLIANCE WITH SECTION "! OF DOLE D.O. N. "', THE IMPLENTATION OF CONSTRUCTION SAFET# SHALL BE CONSIDERED IN ALL STAGES OF PRO&ECT PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL BE INTEGRATED TO THE OVERALL PRO&ECT COST UNDER PA# ITEM “SPL/ CONSTRUCTION SAFET# AND HEALTH” AS A LUMPSUM AMOUNT, TO BE +UANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL RE+UIREMENTS, PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF CONSTRUCTION SAFET# AND HEALTH IN EVER# PRO&ECT SHALL BE INCLUDED IN THE PRO&ECT BIDDING DOCUMENTS SPECIFICALL# UNDER THE INSTRUCTION TO BIDDERS.
CONCTRUCTION PRO&ECT (D.O. N. S. 200)
CONSTRUCTION SAFET# AND HEALTH PROGRAM ( CSHP ) THE RE+UIRED CSHP FOR SPECIFIC PRO&ECT SHALL INCLUDE BUT NOT LIMITED TO THE FF 3 ". COMPOSITION OF SAFET# % HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP4 2. SPECIFIC SAFET# POLICIES WC SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING FRE+UENC# OF % PERSONS RESPONSIBLE FOR CONDUCTING TOOL BO$ AND GANG MEETING4 '. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP4 . FRE+UENC#, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THE# OPERATE4 % . THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION.
MANPOWER
". SAFET# ENGINEER OFFICER 2. SAFET# MAN OFFICER /AS RECOMMENDED B# DOLE, FOR EVER# CONST. PRO&. W "00 % ABOVE WORKERS, AN ACCREDTED SAFET# OFFICER B# DOLE/BWC SHALL BE EMPLO#ED. ONL# THE COST FOR THE CONST. SAFET# % HEALTH OFICER , WHETHER ON FULL OR PART TIME BASIS ASSIGNED ON SITE SHALL BE INCLUDED IN THE E STIMATE. '. HEALTH PERSONNEL /ONL# THE MEDICAL AND DENTAL PRACTITIONERS ACTUALL# ASSIGNED IN THE PRO&ECT SHALL BE INCLUDED IN THE COST OF SAFET#.
E+UIPMENTFACILITIES
". PERSONAL PROTECTIVE E+UPMENT (PPE) /FOR GENERAL CONST. THE RE+UIRED BASIC PPE FOR ALL WORKERS SHALL BE SAFET# HELMET, SAFET# GLOVES AND SAFET# SHOES. SPECIALT# PPE SHALL BE PROVIDED IN ADDITION TO OR IN LIEU OF THE CORRESPONDING PPE AS THE WORK ACTIVIT# RE+UIRES. 2. SIGNAGES AND BARRICADES /SHALL BE PROVIDED AS A PRECAUTION TO ADVICE THE WORKERS % THE GENERAL PUBLIC OF THE HA*ARDS E$ISTING AT THE WORKSITE. '. FACILITIES / W ADE+UTE SAFE DRINKING WATER4 SANITAR# % WASHING FACILITIES3 LIVING ACCOMODATIONS FOR WORKERS.
COSTING PA# ITEM “SPL - CONSTRUCTION SAFET# AND HEALTH” AS A LUMP SUM AMOUNT, TO BE +UANTIFIED IN THE DETAILED
SAFE CONDITION
CAUTION OR RISK
MANDATOR# ACTION
TRAFFIC AND HOUSEKEEPING
ALERT
STOP OR PROHIBITION
RADIATION
REFERENCE 3
SPECIFICATIONS DPWH STD.SPECS., VOL. I, "88, ED. DPWH STD.SPECS.,VOL.II, 200 ED. DPWH STD.SPECS.,VOL.III, " ED.
BOOKS ". ESTIMATING BILL OF MATERIALS B# VICENTE TAGA#UN 2. SIMPLIFIED CONSTRUCTION ESTIMATE B# MA$ B. FA&ARDO &R. '. HANDBOOK OF CONSTRUCTION ESTIMATE B# RHENO A. VELASCO . PLUMBING DESIGN % ESTIMATE B# MA$ B. FA&ARDO &R. . ELECTRICAL LA#OUT % ESTIMATE B# MA$ B. FA&ARDO &R.
OTHER CODES AND SPECIFICATIONS3 P.D."0 - NATIONAL BUILDING CODE R.A. !"0 - LOCAL GOVT. CODE OF "" DOLE D.O. "' SERIES "8 - CONSTRUCTION SAFET# DPWH D.O. SERIES 200 - CONSTRUCTION SAFET# B.P. ' - ACCESSIBILIT# LAW NATIONAL STRUCTURAL CODE OF THE PHILIPPINES AMERICAN CONCRETE INSTITUTE ( ACI ) AMERICAN SOCIET# OF TESTING MATERIALS ( ASTM ) ELECTRICAL CODE OF THE PHILIPPINES PLUMBING CODE OF THE PHILIPPINES PHILIPPINE MECHANICAL ENGINEERING CODE ALL MATERIALS +UALIT# TESTING CODE
NATIONAL BUILDING CODE ( P.D. "0 ) MA&OR DIVISIONS IN BUILDING PLANS SUB&ECT TO ESTIMATE ARCHITECTURAL
AESTHETIC
ARCHITECT
STRUCTURAL
STRENGTH
CIVIL ENGR
ELECTRICAL ELECTRONIC
POWER, LIGHTING % COMMUNICATION
ELECTL ENGR ELECTRONIC ENGR
SANITAR# PLUMBING
HEALTH AND SANITATION
SANITAR# ENGR MASTER PLUMBER
MECHANICAL
NECESSITIES
MECHANICAL ENGR
CLASSIFICATION OF BUILDING STRUCTURES RESIDENTIAL - SINGLE DETACHED DWELLINGS AND DUPLE$ES FOR USE OF OWNER, “ON CAMPUS” DORMITORIES, RECTORIES, CONVENTS AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED B# OCCUPANTS, ARM# BARRACKS, ETC. COMMERCIAL - SINGLE DETACHED DWELLINGS AND DUPLE$ES FOR LEASE, BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND INNS, “OFF CAMPUS” DORMITORIES, TRANSPORTATION TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS, RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS, SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS, PARKING GARAGES, FUNERAL PARLORS, ETC. INDUSTRIAL - FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING PLANTS, GAS GENERATING PLANTS, SHIP#ARDS, AIRCRAFT HANGARS, SLIPWA#S, DR#DOCKS AND PIERS, LUMBER MILLS, WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS, ETC.
INSTITUTIONAL
-
EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS, CLUBHOUSES, HOSPITALS, SANITARIA, AS#LUMS, HOMES FOR THE AGED, &AILS, POLICE AND FIRE STATIONS, PLACES OF WORSHIP, ETC.
RECREATIONAL -
CINEMAS, BILLIARD HOUSES, ETC.
AGRICULTURAL -
BARNS, POULTR# HOUSES, HATCHERIES, STABLES, GREENHOUSES, GRANARIES, ETC.
ANCILLAR# -
HALLS,
DISCO
PADS,
AMUSEMENT
PIGGERIES,
GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND CHIMNE#S, VAULTS, SWIMMING POOLS, PELOTA COURTS, AVIARIES, A+UARIUMS, *OO STRUCTURES, FIERE WALLS AND FENCES OVER ".8O METERS IN HEIGHT, ETC.
TEMPORAR# - FIELD OFFICES, LABORERS5 +UARTERS, CANOPIES AND RAILINGS, PROTECTIVE FENCINGS, ETC. OTHERS - CEMETER# STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI/LEVEL NICHES, ETC.
T#PES OF CONSTRUCTION ( P.D. "0, CHAPTER , SECTION 0" ) T#PE I / T#PE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL ELEMENTS MA# BE AN# OF THE MATERIALS PERMITTED B# THIS CODE. T#PE II / T#PE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE FIRE RESISTANT MATERIALS AND ONE/HOUR FIRE RESISTIVE THROUGHOUT3 E$CEPT, THAT PERMANENT NON/BEARING PARTITIONS MA# USE FIRE/RETARDANT TREATED WOOD WITHIN THE FRAMING ASSEMBL#. T#PE III - T#PE III BUILDING SHALL BE OF MASONR# AND WOOD CONSTRUCTION, STRUCTURAL ELEMENTS MA# BE AN# OF THE MATERIALS PERMITTED B# THIS CODE3 PROVIDED, THAT THE BUILDING SHALL BE ONE/HOUR FIRE - RESISTIVE THROUGHOUT. E$TERIOR WALLS SHALL BE INCOMBUSTIBLE FIRE/RESISTIVE CONSTRUCTION T#PE IV - T#PE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONR# CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION3 E$CEPT, THAT PERMANENT NON/BEARING PARTITIONS OF ONE/HOUR FIRE RESISTIVE CONSTRUCTION MA# USE FIRE RETARTANT TREATED WOOD WITHIN THE FRAMING ASSEMBL#. T#PE V / T#PE V BUILDING SHALL BE FIRE/RESISTIVE. THE STRUCTURAL ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONR# CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE/RESISTIVE CONSTRUCTION.
BUR& DUBAI ( DUBAI TOWER ) THE BUR& DUBAI IS A SUPERTALL SK#SCRAPER CURRENTL# UNDER CONSTRUCTION IN DUBAI, UNITED ARAB EMIRATES. IT IS CURRENTL# THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN E$PECTED HEIGHT OF 8"8 METERS BUT COULD REACH UP TO 0 METERS UPON THE SCHEDULED COMPLETION IN SEPTEMBER 200. THE BUILDING IS BEING BUILT B# A &OINT VENTURE OF THE SOUTH KOREAN COMPAN# SAMSUNG, THE BELGIAN COMPAN# BESI$ AND THE UAE COMPAN# ARABTEC. IT WAS DESIGN B# ADRIAN SMITH OF SKIDMORE, OWING AND MERRIL CONSULTANC#. THE TOTAL BUDGET FOR THE BUR& DUBAI PRO&ECT IS ABOUT ." BILLION DOLLARS.
SCOPE OF WORKS IN BUILDING CONSTRUCTION PART /
A/
MOBILI*ATION
PART /
B/
EARTHWORKS
PART /
C/
TERMITE CONTROL % WOOD PRESERVATIONS
PART /
D/
FOUNDATION WORKS
PART /
E/
DAMP PROOFING MOISTURE CONTROL
PART /
F/
CONCRETE WORKS
PART /
G/
MASONR# WORKS
PART /
H/
CARPENTR# WORKS
PART /
I /
FABRICATED MATERIALS AND HARDWARE
PART /
&/
ROOF FRAMING WORKS
PART /
K/
ROOFING WORKS
PART /
L/
FINISHES
PART /
M / PAINTING VARNISHING
PART /
N/
WATER PROOFING
PART /
O/
SANITAR# WORKS
PART /
P/
ELECTRICAL WORKS
PART /
+/
MECHANICAL WORKS
PART
R
CONSTRUCTION SAFET# AND HEALTH (DO )
PRO&ECT3 ONE(") STORE# (!$! MODIFIED) CLASSROOM SCHOOL BUILDING
ARCHITECTURAL PLAN "
2
2
'
'
GA 2 CORR. G I. ROOFING
D/" W/"
2
W/2
W/2
B
"
2
W/2
B
"
'
CROSS SECTION 2
SCH. OF DOORS % WINDOWS
E$POSED STEEL 6C5 PURLINS AND RAFTERS
SLOPE
B SLOPE
D/"
W/"
D/"
A
A
CORRIDOR
FLOOR PLAN
REFLECTED CEILING
D/" FLUSH T#PE HOLLOW CORE DOOR W MARINE PL#WOOD FACING ON WOOD FRAME
W/"
A
'
C
C
CLASSROOM
W/2 CLASSROOM
REAR ELEVATION
'
W/2
C
D/"
FRONT ELEVATION
"
B
GA 2 CORR. G I. ROOFING
D/" W/"
C
A
"
ROOF PLAN
W/" % W/2 GLASS &ALOUSIE WINDOWS ON ALUMINUM HOUSIG
STRUCTURAL PLAN C/PURLINS
B
A
RAFTER
C
ANGULAR BRACE CORR. GI SHEETS C"/F" WF/"
LB
D/"
" F / " C W/2
CORRIDOR DOWEL COL. FTG.
CLASSROOM WELL CO MPACTED GRAVEL FILL
FGL NGL
WF/"
" / F W
LB
BASE PLATE W LONG ANCHOR BOLTS ROOF INSULATION CEILING FIN. COMPRESSED BETWEEN PURLINS AND RAFTER
C"/F"
C"/F"
" / F W
SLAB ON FILL
" / F W
" / F W WF/"
FFL
" F / " C
WF/" C"/F"
C"/F"
C"/F"
WALL FTG
DETAIL CROSS SECTION FOUNDATION PLAN
LINTEL BEAM FOOTING
COLUMN
WALL FOOTING
SPOT DETAIL LINTEL BEAMS
PLUMBING AND SANITAR# C#CLE ( ONE STORE# STRUCTURE ) HORI*ONTAL VENT PIPE
VENT PIPE THRU ROOF
LAVATOR#
WATER CLOSET
KITCHEN SINK
SHOWER ROOF GUTTER
IN/HOUSE WATER SUPPL# PIPE
DOWNSPOUT
WATER METER
CATCH BASIN
GATE VALVE
METER SHUT/OFF
WATER PIPE CONN. TO WATER MAIN
TO DRAINAGE CANALSEWER
CORPORATION COCK
WATER MAIN
*PICTURE FROM BOOKS OF TAGAYUN
CATCH BASIN
CLEAN/ OUT STORM DRAINAGE PIPE
SOILWASTE PIPE
SEPTIC VAULT
PLUMBING S#STEM WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION S#STEM OF BUILDING
VENTILATION THROUGH ROOF ( VTR ) DR# VENT
SHOWER W ACCESORIES
MAIN VENT
BATH TUB
HOT WATER RETURN
LAVATORIES FI$TURES
WATER CLOSET FLOOR DRAIN
KITCHEN SINK FI$TURES COLD WATER LINE W ACCESORIES HOT WATER LINE W ACCESSORIES WATER HEATER
FITTINGS WET VENT CLEAN OUT
WASTE SOIL PIPE
ELECTRICAL S#STEM LA#OUT ( ONE STORE# STRUCTURES )
LIGHTING LA#OUT
*PICTURE FROM BOOKS OF FAJARDO.
CONVENIENCE OUTLET LA#OUT
PANEL BOARD % CABINETS
PREPARATION OF PROGRAM OF WORKS CONST. OF ONE STORE# SCHOOL BUILDING "
2
'
W/"
D/"
W/"
D/"
B
AMOUNT
".0
P',000.00
I.
MOBILI*ATION DEMOBILI*ATION
II.
EARTHWORKS
2.2
,8!0.00
III.
SOIL POISONING
0.
",80.00
0.!
","0.00
2.
88,0.00
'.2"
,'0.00
VII. CARPENTR# WORKS
'.
"0,20.00
VIII. FAB. MATERIALS % HARDWARE
.08
2!,20.00
I$. ROOF FRAMING WORKS
.8!
2"0.00
C"/F" C"/F" C"/F" WF/" WF/"
W/2
CROSS SECTION
$.
ROOFING WORKS
!.20
2",00.00
$I.
FINISHES
"2.2'
',0.00
$II. PAINTING WORKS
.0
",00.00
$III. SANITAR# PLUMBING WORKS
.0
"2,"80.00
$IV. ELECTRICAL WORKS
.'
",020.00
$V. MECHANICAL WORKS
.00
",000.00
IV. DAMPROOFING WORKS
REAR ELEVATION
C
CLASSROOM
W/2
W/2
FRONT ELEVATION
A
GA 2 CORR. G I. ROOFING
GA 2 CORR. G I. ROOFING
D/"
SCOPE OF WORKS
"
2
'
" " / / F F W W " " F / / " SLAB ON FILL F " C " " / C / F F W W WF/"
C"/F"
WF/"
C"/F"
V.
CONCRETE WORKS
VI.
MASONR# WORKS
C"/F"
FOUNDATION PLAN 2
"
'
C
W/2
B
CLASSROOM
SCH. OF DOORS % WINDOWS
W/2
D/" A
D/" W/" W/" D/" CORRIDOR
FLOOR PLAN
W/" % W/2
FLUSH T#PE GLASS &ALOUSIE HOLLOW CORE WINDOWS ON DOOR W MARINE ALUMINUM HOUSING PL#WOOD FACING ON WOOD FRAME
TOTAL
"00.00
'00,000.00
BUILDING CONSTRUCTION METHODOLOG# ( B# PERTCPM DIAGRAM)
PRO&ECT3 ONE(") STORE# (! $ !) MODIFIED SCHOOL BUILDING PROCUREMENTDELIVER# OF CONSTRUCTION MATERIALS
D
2 ELECTRICALSANITAR# ROUGH/IN
"
&
"
INST. ELECT MECHSANITAR# FI$TURES
"2
CARPENTR# WORKS
P
"
2
MOVE/ IN
A
B
2 WAIT
F
'
M
G
SOIL POISONING
INST. OF PURLINS
BACKFILL
'
2
K
2
"
ROOFING
N
WAIT
I
"
FINISHES
PAINTING
T
'
"!
MOVE OUT
2
V
WAIT
O
R
2
U
INST. FAB. MATLS % HARDWARE
INST. GUTTER % FLUSHING
"
""
W
+
WAIT
WAIT
"
"'
"O
ROOF FRAMING
H
WAIT
E
8
MASONR# WORKS
CONCRETE WORKS
C
2
EARTH WORKS
S
2
' DAMPROOFINGSLAB ON FILL
! 2
"
'
!
8
"0
LEGEND3 NETWORK /
A ES
B LS
ACTIVIT# / A
EVENT / ES
DUMM# / CRITICAL PATH /
LS
EF
LF
""
"2
"'
" " " "! CALENDAR DA#S
"8
"
20
2"
22
2'
2
2
2
2!
28
2
'0
SCOPE OF WORKS
WT.()
AMOUNT (PHP)
I. MOBILI*ATIONDEMOB MOBILI*ATIONDEMOB
".00
',000.00
II. EARTHWORKS
2.2
,8!0.00
III. SOIL POISONING
0.
",80.00
IV. DAMP PROOFING WORKS
0.!
","0.00
V. CONCRETE WORKS
2.
88,0.00
VI. MASONR# WORKS
'.2"
,'0.00
VII. CARPENTR# WORKS
'.
"0,20.00
VIII. FAB. MATLS % H5WARE
.08
"0,20.00
I$. ROOF FRAMING WORKS
.8!
2!,20.00
$. ROOFING WORKS
!.20
2,"0.00
"2.2'
2",00.00
$II. PAINTING WORKS
.0
',0.00
$III. SANITAR# WORKS
.0
",00.00
$IV. ELECTRICAL WORKS
.'
",020.00
$V. MECHANICAL WORKS
.00
",000.00
"00.00
'00,000.00
$I. FINISHES
TOTAL PRO&ECTED CASH FLOW (P) PRO&ECTED ACCPLMENT () CUMMULATIVE CUMMULATIVE CASH FLOW(P) CUMMULATIVE CUMMULATIVE ACCPLMNT()
/ CRITICAL ACTIVIT# PARALLEL ACTIVIT#
CALENDAR DA# DA#S S
"0
"
20
2
'0
SCOPE OF WORKS
WT.()
CALENDAR DA# DA#S S
AMOUNT (PHP)
I. MOBILI*ATIONDEMOB MOBILI*ATIONDEMOB
".00
',000.00
",00.00
II. EARTHWORKS
2.2
,8!0.00
','.00
III. SOIL POISONING
0.
",80.00
",80.00
IV. DAMP PROOFING WORKS
0.!
","0.00
"0
"
20
2
'0 ",00.00
','.00
","0.00
88,0.00 "",""8.! ,!.00 '','.2
V. CONCRETE WORKS
2.
VI. MASONR# WORKS
'.2"
,'0.00
VII. CARPENTR# WORKS
'.
"0,20.00
"0,20.00
VIII. FAB. MATLS % H5WARE
.08
"0,20.00
"',20.00 "',20.00
I$. ROOF FRAMING WORKS
.8!
2!,20.00
"!,!.00 "",8.00
$. ROOFING WORKS
!.20
2,"0.00
",200.00
"2.2'
2",00.00
$II. PAINTING WORKS
.0
',0.00
$III. SANITAR# WORKS
.0
",00.00
!.!
','8'.''
','8'.''
','8'.''
",''.'
$IV. ELECTRICAL WORKS
.'
",020.00
80.00
,0.00
,0.00
,0.00
",!80.00
$V. MECHANICAL WORKS
.00
",000.00
8''.''
,".!
,".!
,".!
",.
"00.00
'00,000.00
$I. FINISHES
TOTAL PRO&ECTED CASH FLOW (P) PRO&ECTED ACCPLMENT () CUMMULATIVE CUMMULATIVE CASH FLOW(P) CUMMULATIVE CUMMULATIVE ACCPLMNT()
',2"0.00
,20.00
,00.00 ',0.00 ",00.00
"!,!''.! ',20.00 ."
"!.8
',"8.2 ,.00 0,"!.00 ',20.00 "!.!'
".'2
'0.0
"'."
"!,!' "!,!''.! '.! !",2' !",2'.! .! "2, "2,0. 0.00 00 "!00.00 20,80.00 '00,000.00 ."
2'.!
".8
.80
8.8
"00.00
SCOPE OF WORKS
WT.()
AMOUNT (PHP)
I. MOBILI*ATIONDEMOB MOBILI*ATIONDEMOB
".00
',000.00
II. EARTHWORKS
2.2
,8!0.00
III. SOIL POISONING
0.
",80.00
IV. DAMP PROOFING WORKS
0.!
","0.00
V. CONCRETE WORKS
2.
88,0.00
VI. MASONR# WORKS
'.2"
,'0.00
VII. CARPENTR# WORKS
'.
"0,20.00
VIII. FAB. MATLS % H5WARE
.08
"0,20.00
I$. ROOF FRAMING WORKS
.8!
2!,20.00
$. ROOFING WORKS
!.20
2,"0.00
"2.2'
2",00.00
$II. PAINTING WORKS
.0
',0.00
$III. SANITAR# WORKS
.0
",00.00
$IV. ELECTRICAL WORKS
.'
",020.00
$V. MECHANICAL WORKS
.00
",000.00
"00.00
'00,000.00
$I. FINISHES
TOTAL PRO&ECTED CASH FLOW (P) PRO&ECTED ACCPLMENT () CUMMULATIVE CUMMULATIVE CASH FLOW(P) CUMMULATIVE CUMMULATIVE ACCPLMNT()
CALENDAR DA# DA#S S
"0
"
20
2
'0
"00
8.8
!
ACTUAL ACCOMPLISHMENT .80
0 ".8
TIME ELAPSED
SCHEDULED ACCOMPLIHMENT 2
2'.!
." "!,!''.! ',20.00 ."
"!.8
',"8.2 ,.00 0,"!.00 ',20.00 "!.!'
".'2
'0.0
"'."
"!,!' "!,!''.! '.! !",2' !",2'.! .! "2, "2,0. 0.00 00 "!00.00 20,80.00 '00,000.00 ."
2'.!
".8
.80
8.8
"00.00
MANPOWER
RATEDA#
CALENDAR DA#S
TOTAL AMOUNT
"0
"
20
2
'0
RES. ENGINEER
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " "
CONST. FOREMAN
" " " " "
" " " " "
" " " " " " " " " " " " " " " " " " " "
LEADMAN
" " " " " " " " " "
" " " " " " " " " " " " " " " " " " " "
CARPENTER
" "
2 2 2 2 2
MASON
" "
2 2 2 2 2 2 2 2 2 2
STEEL MAN
2 2
2 2 2
2 2 2 2 2 2
2 2
2 2 2 2
2 2 2 2 2 2 2
WELDER TINSMITH
2 2 2 2 2 2 2
PAINTER
" " " " " " " " " " " " " " " " " " " " "
PLUMBER
" " " " " " " " " " " " " " " " " " " " " " " " "
ELECTRICIAN LABORER
' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
SAFET# OFFICER FIRST AIDER NURSES TOTAL
8 8
"'"'"' "'" "0 "0 "0 "" "0"0"0 "0 "0 "0"0"2"2"2"2"2"2"0 8
E+UIPTMENT MINOR TOOL ACC. C0NCRETE MI$ER BAR CUTTER CONC. VIBRATOR BAR BENDER WELDING MACHINE
TOTAL
RATEDA#
CALENDAR DA#S
TOTAL AMOUNT
"0
"
20
2
'0
" " " " " " " " " " " " " " " " " " " " " " " " " " " " " " "
" " "
" " " " " " " " " " " " "
" "
"
" "
" " " " " " " " " " " " " "
MANPOWER RE+UIREMENT
TECHNICAL
SAFET# % HEALTH (DO S.200)
SKILLED UNSKILLED
PRO&ECT ENGINEER
SAFET# ENGINEER
CONST. FOREMAN
RESIDENT ENGINEER
SAFET# OFFICER FIRST AIDER NURSES
LEADMAN
MT+C ENGINEER +T#.COST ENGINEER SANITAR# ENGINEER
CARPENTER MASON STEEL MAN
ELECTRICAL ENGINEER
WELDER TINSMITH
MECHANICAL ENGINEER
INSTALLER PAINTER PLUMBER ELECTRICIAN LABORER
PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING E+UIPMENT
SMALL DRILLING E+PT. USE FOR MICRO PILES
E$CAVATOR/USE IN LARGE DIMENSION E$CAVATION % DIGGING
DROP HAMMER DRIVING HEAV# BORING RIG W VIBRO RIG FOR PRE CAST PILES HAMMER FOR BORED PILES
TRUCK MI$ER TANDEM WITH PUMPCRETE USE IN POURING OF HEAV# FOUNDATIONS.
WHEEL LOADER TANDEM W DUMP TRUCK /USE FOR HAULING % DISPOSAL OF DEBRIS AND OTHER E$CAVATED MATERIALS.
HEAV# CABLE GRAB FOR BARRETTE PILES
TRUCK MOUNTEDCRAWLER CRANE /USE TO CARR# % MANEUVER PRE CAST PILE % STEEL CAGES.
GENERATOR SET WELDING MACHINE USE AS CONNECTORS ON HEAV# STRUCTURAL STEEL MEMBERS.
MOBILE CRANES USE TO MANEUVER AROUND % OUTSIDE THE BUILDING TO HOIST MATERIALS % E+UIPMENT FROM VARIOUS LOCATIONS
WHEEL LOADER TANDEM W DUMP TRUCK/USE FOR HAULING % DISPOSAL OF DEBRIS AND OTHER MATERIALS WITHIN THE PERIPHERAL OF THE BUILDINGS
TRUCK MI$ER TANDEM WITH PUMPCRETE USE IN POURING OF HEAV# SUPERSTRUCTURE MEMBERS.
TOWER CRANE USE AS CIRCUMFERENTIAL LIFTING MECHANISM TO TRANSPORT VITAL CONSTRUCTION MATERIALS % E+UIPMENT
FORMS % SCAFFOLDING - USE AS GUIDE % SUPPORT S#STEM IN FORMING % CHECKING ALIGNMENT OF STRUCTURAL MEMBERS IN % AROUND THE BUILDINGS.
GENERATOR SET WELDING MACHINE USE AS CONNECTORS ON HEAV# STRUCTURAL STEEL MEMBERS.
WHEEL LOADER
ROLLER
E$CAVATORBREAKER
TRUCK MI$ER
BULLDO*ER
TRAILER TRUCK
GRADER
DUMP TRUCK
SAMPLING MOLD
BAR CUTTER
"/ BAGGER CONCRETE MI$ER
2 - BAGGER CONCRETE MI$ER
PLATE COMPACTOR
CONCRETE VIBRATOR
TAMPING RAMMER
PORTA LIFT
RING AND BAR BENDER
HOLLOW BLOCK MACHINE
WALK BEHIND ROLLER
SUBMERSIBLE PUMP
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
A. MOBILI*ATION DEMOB. B. EARTHWORKS 9) E:;9<9=>? B9;@>
LABOR OF MAT5LS.
(APPRO$IMATE)
" OF DC
/
) E9= >
'0
;) G9<1
'0
C. TERMITE CONTROL WOOD PRESERVATION 9) S> P>?>?
'0
) W P11<9=>?
'0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
D. FOUNDATION WORKS ". SHALLOW FOUNDATION 9) S19
'0
) M9=
'0
;) R9=
'0
2. DEEP FOUNDATION 9) M>; P>1
'0
) P1/C9= D><1? P>1
'0
;) B1 P>1
'0
) B91==1 P>1
'0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
E. DAMP PROOFING MOISTURE CONTROL 9) O? GJ?
'0
) B1 GJ?
'0
F. CONCRETE WORKS 9) C?;1=1 9.") R19 M>: 9.2) & M>:
"0 - " '0
) R1/9
'0
;) F@
'0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
G. MASONR# WORKS 9) C?;1=1 H B;@ H. CARPENTR# WORKS 9) C1>>?
'0
'0
) P9=>=>?
'0
;) W1? F9>?
'0
) S=9>
'0
1) C9>?1=
'0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
H. FABRICATED MAT5LS AND HARDWARES 9) D ) W>?
LABOR OF MAT5LS.
(APPRO$IMATE)
'0 F9. "0 I?=. '0 F9. "0 I?=.
;) H991 A;;1>1 '0 I. ROOF FRAMING WORKS ". T>1 TJ1
'0
2. S=11 TJ1 9) F9>;9=>?
'0
) I?=99=>?E1;=>?
20
;) EJ>1?=
"0 / 2
) C?J91
8
1) P9>?=>?
!
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
K. ROOFING WORKS 9) R>? M9=5 % 9;;.
'0
L. FINISHES
'0 / '
M. PAINTING VARNISHING 9) M9? P9>?=
'0
) W1? P9>?=
'0
;) M1=9 P9>?=
'0
) V9?>>?
'0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
N. WATERPROOFING 9) C11?= B91 (I?=19)
'0
) M19?1 W9=1>?
'0
;) L>J> W9=1>?
'0
) H>=>; W9=1>?
'0
O. SANITAR# WORKS 9) PJ>? L>?1
'0
) D9>?91, W9=1 % V1?=
'0
;) F>:=J1 % A;;1>1
"
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
P. ELECTRICAL WORKS 9) W>1 % >>?
'0
) C?J>= @
'0
;) P9?1 9 % C9>?1=
) F>:=J1 % A;;1>1
"0
MANDA#S
LABOR COST DISTRIBUTION (BUILDING ESTIMATE) SCOPE OF WORKS
LABOR OF MAT5LS.
(APPRO$IMATE)
+. MECHANICAL WORKS 9) A>;?>=>?>? % R1>19=>? S=1
"0 / L9(A;;.)
) W9=1 PJ
'0 / L9 (P>1 % >=.) " / I?=. J?>=
;) AJ=9=>; W9=1 S>?@1 S=1
'0 / L9 (P>1 % >=.) " / I?=. O J?>=
) E1;=>; E1<9=
'0
1) E1;=>; DJ9>=1
'0
" / I?=. J?>=
MANDA#S
SCOPE OF WORKS IN BUILDING CONSTRUCTION PART /
A/
MOBILI*ATION
PART /
B/
EARTHWORKS
PART /
C/
TERMITE CONTROL % WOOD PRESERVATIONS
PART /
D/
FOUNDATION WORKS
PART /
E/
DAMP PROOFING MOISTURE CONTROL
PART /
F/
CONCRETE WORKS
PART /
G/
MASONR# WORKS
PART /
H/
CARPENTR# WORKS
PART /
I /
FABRICATED MATERIALS AND HARDWARE
PART /
&/
ROOF FRAMING WORKS
PART /
K/
ROOFING WORKS
PART /
L/
FINISHES
PART /
M / PAINTING VARNISHING
PART /
N/
WATER PROOFING
PART /
O/
SANITAR# WORKS
PART /
P/
ELECTRICAL WORKS
PART /
+/
MECHANICAL WORKS
PART
R
CONSTRUCTION SAFET# AND HEALTH (DO )
DPWH STD. SPECS., VOL. I, "88, ED. DPWH STD.SPECS.,VOL.II, 200 ED. DPWH STD.SPECS.,VOL.III, " ED.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART A - MOBILI*ATION / M0VING IN OF MANPOWER, E+UIPTMENT % MATERIALS AT THE PRO&ECT SITE PART A - FACILITIES F0R THE ENGINEER A."."/ OFFICES % LABORATORIES
/ L.S.
A.".2/ VEHICLES FOR THE ENGINEER
/ MO. EACH
A.".'/ ASSISTANCE TO THE ENGINEER
/ MONTHS
A."./ PHOTOGRAPHS
/ EACH
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART B / EARTHWORKS ITEM 800 - CLEARING % GRUBBING
/ CU. M.
ITEM 80" - REMOVAL OF STRUCTURES % OBSTRUCTIONS
/ CU. M.
ITEM 802 - E$CAVATION
/ CU. M.
ITEM 80' - STRUCTURE E$CAVATION
/ CU. M.
ITEM 80 - EMBANKMENT
/ CU. M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART C - TERMITE CONTROL % WOOD PRESERVATION ITEM "000(A) - SOIL POISONING
/ LITER
ITEM "000(B) - WOOD PRESERVATION
/ LITER
ITEM "000(C) - POWDER TERMICIDE
/ KILOGRAMS
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART D - FOUNDATION WORKS ITEM 00(") - UNTREATED TIMBER PILES, FURNISHED
/ METER
ITEM 00(2) - TREATED TIMBER PILES, PRESERVATIVE, FURNISHED
/ METER
ITEM 00(') - STEEL H/PILES, FURNISHED
/ METER
ITEM 00() - PRECAST CONCRETE PILES, FURNISHED
/ METER
ITEM 00() - PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED
/ METER
ITEM 00() - STRUCTURAL STEEL SHEET PILES, FURNISHED
/ METER
ITEM 00(!) - PRECAST CONCRETE SHEET PILES, FURNISHED
/ METER
ITEM 00(8) - UNTREATED TIMBER PILES, DRIVEN
/ METER
ITEM 00() - TREATED TIMBER PILES, DRIVEN
/ METER
ITEM 00("0) - STEEL H/PILES, DRIVEN
/ METER
ITEM 00("") - STEEL PIPES PILES
/ METER
ITEM 00("2) - STRUCTURAL STEEL SHEET PILES, DRIVEN
/ METER
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM 00("') - PRECAST CONCRETE SHEET PILES, DRIVEN
/ METER
ITEM 00(") - PRECAST CONCRETE PILES, DRIVEN
/ METER
ITEM 00(") - PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN
/ METER
ITEM 00(") - TEST PILES, FURNISHED AND DRIVEN
/ METER
ITEM 00("!) - CONCRETE PILES CAST IN DRILLED HOLES
/ METER
ITEM 00("8) - CONCRETE PILES CAST IN STEEL SHELLS
/ METER
ITEM 00(") - CONCRETE PILES CAST IN STEEL PIPES
/ METER
ITEM 00(20) - PILE SHOES
/ METER
ITEM 00(2") - SPLICES
/ METER
ITEM 00(22) - LOAD TEST
/ METER
ITEM 00(2') - BORED PILES (DIA M)
/ METER
ITEM 00(2) - PERMANENT CASING (DIAM)
/ METER
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART E - DAMP PROOFINGMOISTURE CONTROL SPL (") - POL#ETHELENE SHEETS
/ S+. M.
SPL (2) - H#DROLITHIC WATER PROOFING
/ S+. M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART F / CONCRETE WORKS ITEM 0 -
REINFORCING STEEL
/ KGS.
ITEM 0(") - PRE STRESSED STRUCTURAL CONC. MEMBERS / EACH ITEM 0(2) - PRE STRESSED CONCRETE
/ L.S.
ITEM 00
/CU.M.
R. C. CONCRETE777
777/ SJ; >;1 9? 91?= 9 1 J ;1?9=>? J?>>? 9 9=1>9, >?;J>? 1=9 9=1 =, >?= >1, 11 1, 9? ;@ 9;@>? 9? =>1 J14 9 9? 91 @4 >:>?, 9;>?, J?>>?, 9? ;J>? =1 ;?;1=14 9? 9 9, 9=1>9, 1J>1?=, = 9? >?;>1?=9 ?1;19 = ;1=1 =1 >=1Q
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART G - MASONR# WORKS ITEM 0(")A/ MASONR# UNIT (CHB)
/ S+. M.
PART H - CARPENTR# AND &OINER# WORKS ITEM "OO'(A) - WOODEN CEILING
/ BD. FT.
ITEM "OO'(B) - WOODEN PARTITION
/ BD. FT.
ITEM "OO'(C) - WOODEN CABINETS
/ BD. FT.
ITEM "OO'(D) - WOODEN STAIRS % OTHERS AS SPECIFIED ON PLANS
/ BD. FT.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART I - FABRICATED MATERIALS % HARDWARE ITEM "00 - HARDWARE
/
ITEM "00.2." - ROUGH HARDWARE
/ PCSKILO
ITEM "00.2.2 - FINISHING HARDWARE
/ PCSSET
ITEM "00 - STEEL WINDOWS ITEM "00(A) - RESIDENTIAL CASEMENT
/ / S+.M.
ITEM "00(B) - HEAV# DUT# SIDE HINGED VENTILATOR
/ S+.M.
ITEM "00(C) - PRO&ECTED VENTILATOR
/ S+.M.
ITEM "00(D) - AWNING VENTILATOR
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "00 - STEEL DOORS AND FRAMES
/
ITEM "00(A) - HOLLOW STEEL DOORS
/ S+.M.SET
ITEM "00(B) - FLUSH DOOR
/ S+.M.SET
ITEM "00(C) - GRILLE DOOR
/ S+.M.SET
ITEM "00(D) - STEEL LOUVER DOOR
/ S+.M.SET
ITEM "00! - ALUMINUM GLASS DOORS
/
ITEM "00! - ALUMINUM GLASS DOOR, SLIDING T#PE, DESIGNATED AS D - ON THE SCHEDULE
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "008 - ALUMINUM GLASS WINDOWS
/
ITEM "0O8(") - ALUMINUM SLIDING WINDOWS
/ S+.M.
ITEM "008(2) - ALUMINUM CASEMENT WINDOWS
/ S+.M.
ITEM "008(') - ALUMINUM AWNING WINDOWS
/ S+.M.
ITEM "00 - &ALOUSIE WINDOWS
/
ITEM "00(") - GLASS &ALOUSIE WINDOWS
/ S+.M.
ITEM "00(2) - WOOD &ALOUSIE WINDOWS
/ S+.M.
ITEM "0"0 - WOODEN DOORS AND WINDOWS
/
ITEM "0"0(A) - FRAMES(&AMBS, SILLS, HEAD, TRANSOMS AND MULLIONS / SET ITEM "0"0(B) - DOOR(FLUSH OR PANEL)
/ S+.M.
ITEM "0"0(C) - WINDOW SACHES
/ S+.M.
ITEM "0"0(D) - DOOR LOCKS
/
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "0"" - ROLLING UP DOORS
/
ITEM "0""(A) - ROLLING UP DOOR(INDICATE METAL SI*E AND T#PE OF CURTAIN SLATE) ITEM "0"2 - GLASS AND GLA*ING
/ UNITSET /
ITEM "0"2(A) - FLOAT GLASS
/ S+.M.
ITEM "0"2(B) - ORDINAR# WINDOW % SHEET GLASS
/ S+.M.
ITEM "0"2(C) - PLATE GLASS (MIRROR)
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART & - ROOF FRAMING WORKS ITEM 02(") - TIMBER STRUCTURES
/ SPAN
ITEM 02(2) - TIMBER TRUSSES
/ BD. FT.
ITEM 0'(") - STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED
/ KGS
ITEM 0'(2) - STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED
/ KGS
ITEM 0'(') - STRUCTURAL STEEL ,FURNISHED % FABRICATED
/ KGS
ITEM 0'() - STRUCTURAL STEEL ,FURNISHED % FABRICATED
/ KGS
ITEM 0'() - STRUCTURAL STEEL ,ERECTED
/ KGS
ITEM 0'() - STRUCTURAL STEEL ,ERECTED
/ KGS
ITEM 0'(!) - STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED
/ KGS
7 / W11 199=1 91?= > = 1 91 ;1=9>? 1=9 ;1=9>? 9=>;J9 ;?1?=, =1 =9? J?1 =1 1?19 <>>? =J;=J9 =11, 1>?9=>? =1 9=>;J9 ;91 9 1 >?1=1 >? =1 9;1 <>1 >? =1 9 ?91 I=1 0'(2), 0'() 0'(), 9 =1 ;91 9 1.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART K - ROOFING WORKS /
ITEM "0"' - CORRUGATED METAL ROOFING ITEM "0"'(A) - ROOF INSULATION ITEM "0"'.2." - CORRUGATED ROOFING GAUGE 2
/ S+.M. / S+.M .
ITEM "0"'.2.2 - FABRICATED METAL ROOFING ACCESSORIES (A) - RIDGEDHIP ROLLS, FLASHING, GUTTER % DOWNSPOUT GAUGE 2
/ L.M.
(B) - VALLE#S, COUNTER FLASHING GUTTER % DOWNSPOUT GAUGE 2 ITEM "0"'.2.' - ROOF VENTILATORS
/ L.M. / EACH
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "0" - PRE/PAINTED METAL SHEETS ITEM "0"(A) - PRE/PAINTED METAL SHEETS ITEM "0" - CLA# ROOF TILES
/ / S+.M. /
ITEM "0"(A) - CLA# ROOF TILES
/ S+.M.
ITEM "0"! - ROOF DRAINS WITH STRAINERS
/ PCSSET
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART L / FINISHES ITEM "0"8 - CERAMIC TILES ITEM "0"8.2."." - GLA*ED TILES AND TRIMS
/ S+.M.
ITEM "0"8.2.".2 - UNGLA*ED TILES
/ S+.M
ITEM "0" - WOOD TILES ITEM "0"(A) - NARRA WOOD TILES
/ S+.M.
ITEM "0"(B) - TANGUILE WOOD TILES
/ S+.M.
ITEM "0"(C) - OTHER SPECIES AS SPECIFIED
/ S+.M.
ITEM "020 - VIN#L FLOOR TILES
/ S+.M. OR L.M OR OF PCS.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "02" / CEMENT FLOOR FINISH ITEM "02"(A) - PLAIN CEMENT FLOOR FINISH
/ S+.M.
ITEM "02"(B) - COLORED CEMENT FLOOR FINISH
/ S+.M.
ITEM "02"(A) - CEMENT FLOOR FINISH WFLOOR HARDINER
/ S+.M.
ITEM "022 / STUCCO FINISH ITEM "022(A) / STUCCO FINISH
/ S+.M.
ITEM "02' - GRANOLITHIC MARBLE WORKS ITEM "02'(A) - CORRIDORS ITEM "02'(B) - STAIRS LANDING, RISERS, ETC.
/ S+.M. / S+. M. OR L.M.
ITEM "02'(C) - ROOMS AND OTHERS ITEM "02 - PEA GRAVEL WASHOUT FINISH
/ S+.M. / S+.M.
ITEM "02(A) - PEA GRAVEL WASHOUT FINISH
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "02 - BUSH HAMMERED FINISH ITEM "02(A) - BUSH HAMMERED FINISH
/ S+.M.
ITEM "02(B) - FLUTED BUSH HAMMERED FINISH
/ S+.M.
ITEM "02 - PEBBLE WASHOUT FINISH ITEM "02(A) - PEBBLE WASHOUT FINISH
/ S+.M.
ITEM "02! - CEMENT PLASTER FINISH ITEM "02!(A) - CEMENT PLASTER FINISH
/ S+.M.
ITEM "02!(B) - SIMULATED RED BRICKS, ?. "2 ITEM "028 - S#NTHETIC ADOBE ITEM "028(A) - BUSH HAMMERED S#NTHETIC ADOBE FINISH ITEM "028(B) - FLUTTEDBUSH HAMMERED S#NTHETIC ADOBE FINISH
ITEM "028(C) / PI+UETA TOOL FINISH S#NTHETIC FINISH
/ S+.M. / S+.M. / S+.M.
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "O2 - GRANATITE WASHOUT FINISH ITEM "O2(") - GRANATITE WASHOUT FINISH
/ S+.M., LM
ITEM "0'0 - ACCOUSTICAL CEILING ITEM "0'0(A) - ACCOUSTICAL CEILING PANEL
/ S+.M OR OF PCS.
ITEM "0'" - ACCOUSTICAL TREATMENT ITEM "0'".2." - ACCOUSTICAL TILEBOARDPANEL
/ S+.M.
ITEM "0'".2.2 - SPRA#ED/ON ACCOUSTICAL MATERIALS
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART M - PAINTING, VARNISHING % OTHER RELATED WORKS ITEM ITEM ITEM ITEM
"0'2 A - PAINTING WOKS "0'2 A(") - PAINTING WOKS (MASONR# PAINT) "0'2 A(2) - PAINTING WOKS (WOOD PAINT) "0'2 A(") - PAINTING WOKS (ROOF PAINT)
/ S+.M. / S+.M. / S+.M.
ITEM "0'2 B - VARNISHING
/ S+.M.
ITEM "0'2 C - SEA/MIST FINISH
/ S+.M.
ITEM "0'2 D - DUCCO FINISH
/ S+.M.
ITEM "0'2 E - TE$TURE FINISH
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART N - WATERPROOFING WORKS ITEM "0" / WATERPROOFING ITEM "0"(A) - CEMENT BASE WATERPROOFING
/ S+.M.
ITEM "0"(B) - LI+UID WATERPROOFING
/ S+.M.
ITEM "0"(C) - BUILT/UP AND PREFORMED MEMBRANE
/ S+.M.
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART O - SANITAR# WORKS ITEM "00" - STORM DRAINAGE AND SEWERAGE S#STEM ITEM "00".2(A) - PIPE (KIND AND SI*E) ITEM "00".2(B) - FITTINGS (KIND AND SI*E)
/ METER / EACH
ITEM "00".2(C) - CONCRETE GUTTER
/ METER
ITEM "00".2(D) - CONCRETE CANAL
/ METER
ITEM "00".2(E) - W.I. GRATING
/ METER
ITEM "00".2(F) - CATCH BASIN
/ EACH
ITEM "00".2(G) - &UNCTION BO$
/ EACH
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART P - ELECTRICAL WORKS ITEM ""00 - CONDUITS, FO$ES % FITTINGS (")/RSC CONDUIT PIPE/ MM DIA W COUPLING (2)/LOCKNUT % BUSHING (')/CONDULET T#PE ()/CONDUIT PIPE ELBOW ()/CONNECTOR ()/CONDUIT CLAMP (!)/PVC ADAPTER (8)/G.I. WIRE G.A. " ()/HACKSAW BLADE ("0)/PVC TAPE "MM DIA $ "8MM ("")/RUBBER TAPE "MM DIA $ 22!G ("2)/PVC SOLVENT CEMENT 00 CC. ("')/PVC END BALL (")/OCTAGONAL &UNCTION BO$ (")/UTILIT# BO$ES (")/METAL PULL BO$ ("!)/S+UARE BO$ ("8)/TELEPHONE CABINET (")/REINFORCED CONCRETE PEDESTAL POLE (20)/RED LEAD PAINT (2")/WEATHER HEAD W T#PE F CONDULET (22)/GROUNDING ROD COPPERWELD 20MM DIA. $ '.00M (2')/APITONG OR APPROVED E+UAL CRESOTED WOOD POLE (2)/ANCHOR ROD MM DIA (2)/ANCHOR LOG MM DIA (2)/POWERLOAD STUDS WITH NUTS
/ LENGTH / PAIRS / PIECES / PIECES / PIECES / PIECES / PIECES / KILOS / PIECES / ROLLS / ROLLS / CANS / PIECES / PIECES / PIECES / PIECES / PIECES / SET / LOT / LOT / PIECES /LENGTH / PIECES / PIECES / PIECES / PIECES
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM ""0" - WIRES AND WIRING DEVICES (")/ ELECTRIC WIRE / METER OR ROLLS (2)/ SINGLE POLE TUMBLER SWITCH / PIECES (')/ TWO/GANG TUMBLER SWITCH / PIECES ()/ THREE/GANG TUMBLER SWITCH / PIECES ()/ THREE/WA# TUMBLER SWITCH / PIECES ()/ DUPLE$ CONVENIENCE RECEPTACLES / SET (!)/ HEAV# DUT# CONVENIENCE RECEPTACLES / SET (8)/ STD. TELEPHONE OUTLET BAKELITE COVER W .2 CENTER HOLE / PIECES ()/ WDO T#PE AIRCONDITIONING OUTLET '/ PRONG POLARI*ED T#PE / PIECES ("0)/ BARE COPPER WIRE / METERS ("")/ GROUNDING CLAMPS FOR ELECTRIC WIRES / PIECES ("2)/ MESSENGER WIRE / METERS ("')/ GU# WIRE / METERS (")/ VIBRATING BELL / SET (")/ TRAFFIC LIGHT CONTROL PANEL / SET (")/ TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED % GREEN LIGHT PROVIDED WITH REFLECTORS % "2MM DIAMETER VIBRATING BELL / SET
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM ""02 - POWER LOAD CENTER, SWITCHGEAR % PANEL BOARDS (")/ PANEL BOARD (CIRCUIT BREAKER T#PE) (2)/ PANEL BOARD (SAFET# SWITCH T#PE) (')/ LOW/VOLTAGE SWITCHGEAR (LVS) COMPLETE W METERING DEVICES AND ACCESSORIES ()/ POWER FUSES PIECES ()/ LIGHTING ARRESTERS ()/ AIR BREAK SWITCH (!)/ ENCLOSED ACB NEMA T#PE " (8)/ ENCLOSED ACB NEMA T#PE 'R ()/ AUTOMATIC TRANSFER SWITCH ("0)/ MANUAL TRANSFER SWITCH WITHOUT FUSES ("")/ MOTOR CONTROLLER
/ SET / SET / SET / / PIECES / SET / SET / SET / SET / PIECES / SET
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART + - MECHANICAL WORKS ITEM "200 - AIR CONDITIONING AND REFRIGERATION S#STEM (A)/ (B)/ (C)/ (D)/ (E)/
COMPRESSOR, CONDENSER AND EVAPORATOR DIFFUSSER, GRILLES AND VALVES PIPES DUCTS AND INSULATIONS PIPE INSULATIONS
ITEM "20" - WATER PUMPING (A)/ (B)/ (C)/ (D)/
PUMP AND WATER TANK AIR COMPRESSOR PIPES VALVES AND FITTINGS
/ SET / PIECES / LENGTH / S+.M. / METER / SET / SET / LENGTH / PIECE
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "202 - AUTOMATIC WATER SPRINKLER S#STEM (A)/ FIRE AND &OCKE# PUMPS (B)/ SPRINKLER HEAD, VALVES AND FITTINGS (C)/ PIPES
/ SET / PIECE / LENGHT
ITEM "20' - ELECTRIC ELEVATOR (A)/ TRACTION OR H#DRAULIC MACHINE AND CAR (B)/ HOISTWA# DOORS, COUNTER WEIGHT, GUIDE RAILS, ANNUNCIATORS, AND HALL POSITION INDICATORS (C)/ ELECTRICAL WIRES AND CONDUITS
/ SET / PIECE / LENGTH
ITEM "20 - ELECTRIC DUMPWAITER (A)/ MACHINE (B)/ CAR, DOOR AND CABLE (C)/ ELECTRICAL WIRES AND CONDUITS
/ SET / PIECE / LENGHT
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
ITEM "20 - O$#GEN, NITROUS O$IDE, VACUUM % FUEL GAS S#STEM (A)/ O$#GEN, NITROUS O$IDE, GAS MANIFOLD AND DUPLE$ VACUUM PUMP (B)/ HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES (C)/ PIPES AND TUBINGS LENGHT
/ SET / PIECE /
ITEM "20 - HEATING S#STEM
(A)/ BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DA# TANK INCLUDING FOUNDATION (B)/ PIPES (C)/ VALVES AND FITTINGS
/ SET / LENGTH / PIECES
ITEM "20! / BOILERS (A)/ STEAM BOILERS, AIR COMPRESSOR, HEAT E$CHANGER AND FUEL PUMP (B)/ PIPES WITH INSULATION (C)/ VALVES AND FITTINGS
/ SET / LENGTH / PIECE
COST ESTIMATION S#STEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)
PART R/ CONSTRUCTION SAFET# AND HEALTH (DO ) SPL /" - PERSONAL PROTECTIVE E+UIPTMENT (PPE)
/ PCS.
SPL /2 - SAFET# AND HEALTH PERSONNEL
/ NOS.
SPL /' - SIGNAGES AND BARRICADES
/ PCS.