AFC Consultants International
CONCRETE HOLLOW BLOCKS FACTORY
TABLE OF CONTENTS
1
EXECUTIVE EXECUTIVE SUMMARY SUMMARY ............................................. .................................................................... ......................................... .................. 2
2
PROJECT PROJECT DESCRIPTION..................... DESCRIPTION............................................ .............................................. ......................................... .................. 2
3
4
5
2.1
FACILITIES AND INITIAL INVESTMENT ............................................ .................................................................. ...................... 2
2.2
PRODUCTION PROCESS ............................................ ................................................................... ............................................. ...................... 3
2.3
STAFFING STRUCTURE ............................................ ................................................................... ............................................. ...................... 3
MARKET MARKET ANALYSIS ANALYSIS ............................................. .................................................................... .............................................. ......................... .. 4 3.1
PERCEIVED N EEDS ............................................... ...................................................................... .............................................. ......................... .. 5
3.2
.................................................................... .............................................. ......................... .. 6 MAIN COMPETITION .............................................
3.3
.................................................................... .............................................. ............................. ...... 6 TARGET MARKET .............................................
3.4
................................................................... .............................................. ............................. ...... 6 SWOT A NALYSIS............................................
MARKETING MARKETING PLAN........................... PLAN.................................................. .............................................. ............................................. ...................... 7 4.1
..................................................................... ......................................... .................. 7 MARKETING STRATEGY ..............................................
4.2
PRICING ........................................... .................................................................. .............................................. ............................................. ...................... 7
4.3
SALES C HANNEL.............................................. ..................................................................... .............................................. ............................. ...... 7
FINANCIAL FINANCIAL PLAN.......................... PLAN.................................................. ............................................... .............................................. ......................... .. 8 5.1
.................................................................... ............................................. ...................... 8 MAJOR ASSUMPTIONS .............................................
5.2
PROJECTED INCOME STATEMENT ............................................ ................................................................... ............................. ...... 9
5.3
PROJECTED BALANCE SHEET .................................................................. ................................... ............ 10 SHE ET ...........................................
5.4
PROJECTED CASH FLOWS ............................................. .................................................................... ....................................... ................ 11
5.5
PROJECTED R ATIO ..................................................................... ............................... ........ 12 ATIO ANALYSIS ..............................................
5.6
BREAK - EVEN ANALYSIS .............................................. ..................................................................... ....................................... ................ 13
5.7
SENSITIVITY A NALYSIS .............................................. ..................................................................... ....................................... ................ 13
6
CONCLUSION AND RECOMMENDATIONS RECOM MENDATIONS....................... .............................................. ........................... .... 14
7
ECONOMIC ECONOMIC IMPACT EVALUATIO EVALUATION N .............................................. .............................................................. ................ 14
LBN/B7-4100/IB/99/0225/JC20/0105
1
AFC
Consultants
International
Executive Summary
The proposed project consists in establishing a concrete hollow block factory in Marjeyoun town.
Large areas of Lebanon and specifically in the South region lie in ruin following the recent Israeli air, sea and land assaults. Therefore, it would be beneficial to invest ventures producing building materials such as a hollow block concrete factory as this type of block is one of the most basic elements in construction. The initial investment is estimated at $123,419, which includes $57,500 for the required equipment and $54,919 for working capital. The projections are taken over a period of 7 years. The plant provides average annual profitability of $31,941. The average return on investment (ROI) is 106%.
The concrete hollow block factory provides an internal rate of return (IRR) of 23% and a payback period of 5 years 4 months. These results show that the project is feasible and provides good returns for its shareholders. The concrete hollow block plant will offer 15 job opportunities . As a result, the plant will contribute to the general enhancement of the economic environment in Marjeyoun.
2
Project description
The project consists in developing a concrete hollow block factory in Marjeyoun caza. The plant will be able to supply concrete hollow blocks to Marjeyoun as well as Bint Jbeil, Hasbaya and Nabatieh regions.
2.1 Facilities and initial investment The total land area is assumed to be 5,000 m2 out of which 1,125 m2 will be needed for the factory, 125 m2 for the administrative offices, and 3,750 m2 for the warehouse. It is assumed that the land would be rented out at a rate of $1/m2 per year.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
2
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
The following table shows the projected equipment and initial investment requirements. The total investment required includes the cost of equipment, vehicles, as well as working capital requirements and amounts to $123,398.
Initial Investment Cost Items
Quantity
Semi-automatic block factory Dumper Pallets
Unit cost
1 1 50
30,000 15,000 30
Total equipment Pick up (used) Furniture & Fixtures Computer & Office Equipment Establishment Costs
30,000 15,000 1,500
46,500 1
5,000
Total fixed assets Working capital needs Total initial investment Source:
Total cost
5,000 12,000 3,000 2,000
68,500 54,919 123,419
Tony Abi Antoun, Best Concrete
2.2 Production process The production process involves the following steps: 1. 2.
3.
The ingredients (sand, cement, water, etc…) are mixed in a special mixer to obtain the mortar. The workers press the mortar through the mechanically operated machines. The pressing process and the ratio of the ingredients’ mix play an important role in determining the strength of the blocks. The company will have a pick - up to deliver blocks directly to work sites. Blocks can be loaded on pallets or by individual blocks.
2.3 Staffing structure The staff structure will be distributed as follows:
STAFF STRUCTURE Management & Sales Plant Manager Ass ista nt and accoun tant Drivers Total administrative staff Foreman Daily Workers
Total production staff TOTAL
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
Number of employees
1 1 2 4 1 10 11 15
3
LBN/B7-4100/IB/99/0225/JC20/0105
3
AFC
Consultants
International
Market Analysis
The construction blocks market has been on an increasing trend, mainly driven by the reconstruction efforts in the country.
Large areas of Lebanon lie in ruin following the recent Israeli air, sea, and land assaults. Homes and businesses in a number of Lebanese rural and urban villages and towns in South Lebanon are in need of reconstruction. According to the Government assessments, the war has set back the country’s infrastructure for at least 15 years with reconstruction and rehabilitation to be carried out on a large scale basis. There are 15 small concrete hollow block factories in Marjeyoun and 7 small concrete hollow block factories in Hasbaya. Therefore investing in a technically advanced factory producing building materials of high quality and same price would be beneficial for the region. A hollow concrete block factory operating at full capacity would be suffici ent in meeting the needs for reconstruction in the Cazas of Marjeyoun, Hasbaya, and Bint Jbeil. Price- wise, the trend has been going upward, especially with the increase in the costs of raw materials including sand, aggregates, etc… In fact, the costs of aggregates and sand have increased substantially since the forced shut down of a number of illegal quarries in Lebanon.
In addition, the price of cement is quite high because of the duopoly in the cement sector (only 2 companies operate in this sector). More recently, the increased demand created by the reconstruction activities following the July 2006 war has led to cement price hikes by 20% to 25%. The high costs of raw materials are reflected in the selling price. Generally, demand is seasonal, where winter is considered a low season.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
4
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
3.1 Perceived Needs The large scale of destruction has left many towns and villages in the districts of Marjeyoun, Hasbaya and Bint Jbeil in ruins. The following table shows the scale of destruction by selected villages and the surfaces of houses and residences to be rebuilt as well as the amounts of concrete needed for reconstruction. In October 2006, the area to be constructed in the Khiyam region was estimated at 300,000 m2. Up to November 2007, 80% of the ruins have been rebuilt with 60,000 m2 remaining.
Approximate Area to be constructed in m2 Town District Marjeyoun El-Khiyam 60,000 Kfar Kila 6,000 Houla 25,000 Meis el Jabal 20,000 Jdeidat 5,000 Debine 35,000 Blat 4,500 Kantara 4,500 Taybee 45,000 Deirmimas 3,000 208,000 Bint Jbeil Bint Jbeil 400,000 34,000 Ayatrou n Aynata 105,000 Maroun el Ra 47,000 22,000 Blida Baraachite 38,000 Ain Ebel 7,500 Rmeich 3,700 Kouneen 28,000 Tebnine 15,700 Shakra 2,700 703,600 Hasbaya Kfarshouba 25,000 Kfaraman 3,000 Rashaya Fokh 1,500 Hibariyeh 2,000 31,500 Total in need 943,100
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
Estimated Concrete needed in m3 20,000 5,700 24,200 19,000 4,700 34,200 4,200 4,370 42,700 2,800 161,870 370,000 32,750 102,000 45,200 21,300 36,700 7,200 3,500 26,900 15,000 2,500 663,050 24,200 2,800 1,400 1,920 30,320 855,240
5
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
Moreover, the towns of the three mentioned districts have regular and continuous needs arising from population growth. Data on building permits allocated by the Office of Urbanization below is a clear indication.
Bint Jbeil Bldg Permits Surface in m2 2000 N/A 2001 N/A 2002 550 2003 390 2004 388 2005 430
Marjeyoun & Hasbaya Bldg Permits Surface in m3 N/A 122 52,000 N/A 271 110,000 220,000 339 135,000 156,000 234 95,000 212,406 232 93,000 177,000 240 94,679
Furthermore, unforeseen needs may arise due to the large number of UNIFIL troops that are residing in the South region specifically Bint Jbeil, Marjeyoun, and Hasbaya.
3.2 Main competition There are around 22 concrete hollow block factories in Marjeyoun and Hasbaya cazas; 15 factories are in Marjeyoun and 7 small factories are in Hasbaya. These factories will not pose a threat to the concrete hollow block plant on condition that the plant will offer high quality blocks at same prices.
3.3 Target market The factory will be able to accommodate the construction needs of the South region and specifically Marjeyoun, Bint Jbeil, Hasbaya, and other nearby areas.
3.4 SWOT Analysis STRENGTHS It will be a unique technically advanced Ø factory due to the presence of small traditional factories in the region. It will facilitate construction needs by Ø providing the most basic and needed construction element; concrete hollow block. The factory will have a strategic location in Ø Marjeyoun where there are wide and urgent reconstruction activities. OPPORTUNITIES The construction market is a very active Ø sector and there is a constant demand for construction materials especially in the South. The reconstruction efforts following the July Ø 2006 war are leading to an increase in demand for construction materials. Unforeseen construction needs in addition to Ø the existing urgent construction needs due to the war destruction may arise due to the large number of UNIFIL troops that are residing in the South region specifically Bint Jbeil, Marjeyoun, and Hasbaya.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
WEAKNESSES Generally, demand is seasonal, where Ø winter is considered a low season.
THREATS Environmental threats include the Ø economic recession in the country and the region’s closeness to Israel and the fear of another wa r. Ø The increase in the cost of labor following the war and the political instabilities. Fluctuations in the prices of raw Ø materials and cements.
6
LBN/B7-4100/IB/99/0225/JC20/0105
4
AFC
Consultants
International
Marketing Plan
The marketing objectives of the concrete hollow block plant consist in capitalizing on its competitive advantages. Ø Ø Ø
High quality products. Competitive and attracting prices due to lower transportation costs to neighboring construction sites. Existence of a solid demand for reconstruction efforts specifically post the July 2006 war.
4.1 Marketing Strategy The concrete hollow block factory will base its marketing strategy on the following: ·
·
An informative pamphlet could be developed displaying the factory’s product. This pamphlet will be distributed to all contractors and consultants working on pr ojects in the South. The concrete hollow block plant manager/owners should develop direct contacts with families looking for rehabilitating their properties in Marjeyoun, Bint Jbeil, Hasbaya, and other nearby areas.
4.2 Pricing The prices of the concrete ho llow blocks will essentially be determined by market conditions. For the study, we assumed the following average pricing structure based on current market prices.
Pricing Block Length 10 cm 15 cm 20 cm
Price ($) 0.23 0.35 0.46
The factory will apply differentiated pricing and discounts according to the quantity of blocks purchased and to the client loyalty.
4.3 Sales Channel The concrete hollow block plant will establish strategic alliances with consultants, contractors and other professionals and businesses in the construction sector in the South. Promotion of the concrete hollow block products will be done mainly through direct contacts by the owner. The targeted regions will mainly cover Marjeyoun caza and neighboring cazas such as Hasbaya and Bint Jbeil.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
7
LBN/B7-4100/IB/99/0225/JC20/0105
5
AFC
Consultants
International
Financial Plan
This section details the calculations, assumptions and methodology used as a basis for the projections of the expected financial performance of the concrete hollow block plant.
5.1 Major assumptions The projections are based on conservative assumptions as well as market performance. They take into consideration the economic situation in the caza.
The following table shows the sales growth assumptions:
Sales growth
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 10% 5% 5% 3% 2% 0% 0%
The sales growth assumptions are based on plant capacity that starts with 80% of its capacity in the first year and then gradually increases to reach its full capacity by year 7.
The following table summarizes the income statement assumptions. The cost of sales and operating charges are mainly based on market levels. Income Statement Assumptions Cost of materials Average sales price USD Blocks production capacity Maintenance & Repairs Fuel Annual increase in general expenses Increase in salaries Increase in rental expenses Income Tax Rate
64% 0.35 3,500 0.5% 1.7% 4% 2% 5% 2%
of sales per block per day on sales on sales annually annually every 3 years
The plant capacity is assumed to be at 3,500 blocks per day; work days are around 300 days per year. The sales price per block varies depending on the size of the block as displayed in the below table.
Length
Price ($)
10 cm 15 cm 20 cm
0.23 0.35 0.46
Therefore, average sales price accounts for the average of the block sizes that the plant will offer. General expenses are assumed to increase by 4% annually. Salaries are assumed to increase by 2% annually. The income tax rate is estimated at 2% (individual establishment).
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
8
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
Accounts receivable are estimated at 2 months of sales. Inventories are estimated at 2 months of cost of materials. The accounts payable are based on 1 month of cost of materials. Balance Sheet Assumptions Acc ounts rec eiva ble
2 2 1 5%
Inventories Acc ounts pay abl e Expenses payable
months of sales months of COGS months of COGS of general expenses
The depreciation rates are based on International accounting standards as shown in the below table.
Depreciation rates Plant machinery Fixtures & furniture Vehicles computer & office eqpt Establishment Costs
5 .2
10% 10% 12% 20% 33%
Projected income statement Concrete Hollow Block Plant Income Statement
Sales Total Revenues Cost of sales
Cost of sales-materials Wages-production Fuel Rent Maintenance & repairs-equipment Depreciation machines & vehicles
Total cost of sales Gross margin Gross profit margin% GENERAL & ADMINISTRATIVE EXPENSES
Electricity charges Telephone charges Salaries & Social Security Charges-Ad Depreciation expenses Other expenses Total General & Admini st rat ive Exp Earnings Before Tax Tax expenses Net Income Net profit Margin
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
294,000 294,000
323,400 323,400
339,570 339,570
356,549 356,549
367,245 367,245
374,590 374,590
374,590 374,590
188,160 40,800 4,998 5,000 1,470 4,350 244,778 49,222
206,976 41,616 5,498 5,000 1,617 4,350 265,057 58,343
217,325 42,448 5,773 5,000 1,698 4,350 276,594 62,976
228,191 43,297 6,061 5,250 1,783 4,350 288,932 67,616
235,037 44,163 6,243 5,250 1,836 4,350 296,879 70,366
239,738 45,046 6,368 5,250 1,873 4,350 302,625 71,965
239,738 45,947 6,368 5,513 1,873 4,350 303,788 70,801
19%
19%
17% 600 1,200 24,000 3,666 1,000 30,466 18,756 375 18,381
6%
18%
19%
19%
19%
624 1,248 24,480 3,666 1,040 31,058 27,285 546 26,739
649 1,298 24,970 3,668 1,082 31,666 31,310 626 30,684
675 1,350 25,469 3,200 1,125 31,819 35,797 716 35,082
702 1,404 25,978 3,200 1,170 32,454 37,912 758 37,153
730 1,460 26,498 2,600 1,217 32,505 39,460 789 38,671
759 1,518 27,028 2,600 1,265 33,171 37,631 753 36,878
8%
9%
10%
10%
10%
10%
The projected income statement shows an increase in net profit margins that reach 10% in the 7th year of operations. These levels are expected to be reached through a gradual increase in sales. The increase in volume of sales is expected to allow higher net earnings, which are projecte d to reach $36,878 by year 7.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
9
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
5.3 Projected balance sheet The projected balance sheet shows the assets and liabilities of the company based on the feasibility assumptions.
Concrete Hollow Block Plant Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Cash & banks Accounts receivable Inventory Total current assets Plant machinery Fixtures & furniture Vehicles Computer & Office Equipment Establishment expenses Accumulated depreciation Net fixed assets
BALANCE SHEET
20,265 49,000 31,360 100,625 31,500 12,000 20,000 3,000 2,000
24,558 53,900 34,496 112,954 31,500 12,000 20,000 3,000 2,000
32,159 56,595 36,221 124,974 31,500 12,000 20,000 3,000 2,000
38,568 59,425 38,032 136,024 31,500 12,000 20,000 4,000 2,000
47,555 61,207 39,173 147,935 31,500 12,000 20,000 4,000 2,000
56,833 62,432 39,956 159,221 31,500 12,000 20,000 4,000 2,000
66,562 62,432 39,956 168,950 31,500 12,000 20,000 5,000 2,000
16,032
24,050
31,600
39,150
46,100
60,484
52,468
44,450
37,900
30,350
23,400
17,450
TOTAL ASSETS
161,109
165,422
169,424
173,924
178,285
182,621
186,400
15,680 3,630
17,248 3,700
18,110 3,772
19,016 3,858
19,586 3,933
19,978 4,010
19,978 4,102
19,310
20,948
21,883
22,874
23,520
23,988
24,080
19,310 123,419 18,381
20,948 123,419 21,055
21,883 123,419 24,123
22,874 123,419 27,631
23,520 123,419 31,347
23,988 123,419 35,214
24,080 123,419 38,902
141,799 161,109
144,473 165,422
147,542 169,424
151,050 173,924
154,765 178,285
158,632 182,621
162,320 186,400
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
8,016
53,050
LIABILITIES & OWNERS EQUITY
Liabilities Accounts payable Expenses Payable Current Liabilities Total liabilities Invested capital Owner's equity Total owners' equity TOTAL LIAB.& OWNERS EQUITY
Owner's equity Begin. Owner's equity Net income Owners' Withdrawals Ending owner's equity
18,381
18,381 26,739 24,066
21,055 30,684 27,616
24,123 35,082 31,573
27,631 37,153 33,438
31,347 38,671 34,804
35,214 36,878 33,190
18,381
21,055
24,123
27,631
31,347
35,214
38,902
The owners can start withdrawing cash in year 2.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
10
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
5.4 Projected cash flows Concrete Hollow Block Plant STATEMENT OF CASH FLOWS
Net income
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
18,381
26,739
30,684
35,082
37,153
38,671
36,878
8,016 (49,000) (31,360) 15,680 3,630
8,016 (4,900) (3,136) 1,568 70
8,018 (2,695) (1,725) 862 72
7,550 (2,830) (1,811) 906 86
7,550 (1,783) (1,141) 570 75
6,950 (1,224) (783) 392 77
6,950 91
Adjustments to reconcile net income to cash provided by operating activities
Depreciation Changes in receivables Changes in inventories Changes in accounts payables Changes in general expenses To t al A d j u s t m en ts
(53,034)
Cash provided by operating activities
(34,653)
28,358
1,618
35,217
4,533
Investment in fixed assets Net cash used in investing activities
(68,500) (68,500)
-
-
Cash flow from financing activities Capital Owners' Withdrawals Cash provided by financing activities
123,419 123,419
3,901
38,982
5,272
5,411
42,425
44,082
-
-
7,041
43,920
Cash Flow from Investing Activities Capital expenditures
Cash at beginning of year Changes in cash Cash at end of year
20,265 20,265
(1,000) (1,000)
(1,000) (1,000)
(24,066) (24,066)
(27,616) (27,616)
(31,573) (31,573)
(33,438) (33,438)
(34,804) (34,804)
(33,190) (33,190)
20,265 4,292 24,558
24,558 7,601 32,159
32,159 6,409 38,568
38,568 8,987 47,555
47,555 9,278 56,833
56,833 9,729 66,562
The projected statement of cash flows shows the initial net investment in fixed assets and the capital expenditures of the projected years. The cash flow statement also shows the net invested capital by the owners. The statement shows the owners’ withdrawals that start in year 2.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
11
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
5.5 Projected ratio analysis Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Ratio Analysis Liquidity Ratios Current Ratio 5.21 5.39 5.71 5.95 6.29 6.64 7.02 Quick Ratio 3.59 3.75 4.06 4.28 4.62 4.97 5.36 Working Capital 81,315 92,005 103,092 113,150 124,415 135,232 144,870 Profitability Ratios Gross Profit Margin 17% 18% 19% 19% 19% 19% 19% Net Profit Margin 6% 8% 9% 10% 10% 10% 10% Financial Strength Total Debt to Owners' Equity 14% 14% 15% 15% 15% 15% 15% Management Effectiveness Return on Assets=ROA 11% 16% 18% 20% 21% 21% 20% Return on Equity=ROE 13% 19% 21% 23% 24% 24% 23% Return on Investment = ROI 30% 51% 69% 93% 122% 165% 211% Sales / Business Days (360) 817 898 943 990 1,020 1,041 1,041 Asset Management (Efficiency) Total Assets Turnover: Sales/tot assets 182% 196% 200% 205% 206% 205% 201% Total Debt to Total Assets 12% 13% 13% 13% 13% 13% 13% Working Capital Cycle Days Sales Outstanding 60 60 60 60 60 60 60 Days of Inventory 60 60 60 60 60 60 60 Days of payables 30 30 30 30 30 30 30 Working Capital Turnover=Sales/Working Capit 3.6 3.5 3.3 3.2 3.0 2.8 2.6
The current ratio, which is computed by dividing current assets by current liabilities, witnesses a major increase over the years led by higher levels of inventories. The quick ratio, which is the same as the current ratio except that it excludes inventories increases rapidly over the years as accounts receivable increase. The current and quick ratios demonstrate the capability of the company to quickly meet its short term liabilities. The return on average assets, which is computed by dividing net profits by total assets, shows how much profit the company is able to achieve from the use of its assets. This ratio fluctuates around an average of 18%.
The total assets turnover shows how well the management is making use of its assets. The assets turnover is computed by dividing sales over total assets. It is expected to increase with the growth in sales to reach 201% in year 7. The gross profit margin improves over the years with the growth in sales. The operating margins and the net profit margins improve as well. The return on average equity shows healthy levels fueled by the growth in profitability. Also the return on investment shows increasingly high levels that reach 211% in year 7. The internal rate of return is 22.6% and the payback period, which is the period necessary to pay back the investment, is 5 years 4 months.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
12
LBN/B7-4100/IB/99/0225/JC20/0105
AFC
Consultants
International
5.6 Break-even analysis Concrete Hollow Block Plant
Break-even Analysis
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Total Revenues Total Variable Costs Total Fixed Costs
294,000 194,628 80,616
323,400 214,091 82,024
339,570 224,795 83,464
356,549 236,035 84,716
367,245 243,116 86,217
374,590 247,978 87,151
374,590 247,978 88,981
Break-even Revenues
238,509
242,675
246,936
250,639
255,080
257,843
263,257
The above table shows the break even revenues required in each year to cover operating expenses. Revenues exceeding these levels start producing net income. Thus, in year 1, revenues of $ 238,509 are needed to break even.
5.7 Sensitivity Analysis A worst-case scenario is taken by assuming a slower sales growth that even does not reach full capacity by year 7. In this case, the concrete hollow block factory will have an average profitability of $26,246 annually. The internal rate of return is 19%. The payback period is 6 years and 1 month. A best-case scenario is developed considering faster sales growth to reach target where the plant will start operating at full capacity since year 3. This scenario gives an average profitability of $33,706 annually. The internal rate of return is 23% and the payback period is 5 years and 1 month.
Sensitivity Analysis Average yearly sales
Average Net Income Average Net profit margin Internal rate of return Payback period in years
Worst-case 329,940
26,246 8%
Most-likely 347,135
Best-case 352,464
31,941 9%
33,706 9%
19% 23% 6 years 1 month 5 years 4 month
23% 5 years 1 month
These results show that the project is feasible, especially if it is well -managed providing quality at affordable prices and if the marketing and distribution activities are well developed.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
13
LBN/B7-4100/IB/99/0225/JC20/0105
6
AFC
Consultants
International
Conclusion and Recommendations
The market for construction materials has been growing over the years. Currently, a major opportunity appeared for faster growth following the war of July 2006 and the reconstruction efforts. In order to achieve good results, there are some essential success factors, which include: ·
·
·
7
A key s uccess ingredient in this sector and especially in the region is the ability to produce concrete hollow blocks of high quality at same prices. The ability to deliver on time good quality products coupled with good servicing is also an important factor for success. The plant should capitalize on its major advantages of proximity to all the cazas in the South where most of the reconstruction activities are taking place.
Economic Impact Evaluation
The concrete hollow block plant in itself will create 15 jobs in Marjeyoun. A hollow concrete block factory operating at full capacity would be sufficient in meeting the needs for reconstruction in the Cazas of Marjeyoun, Hasbaya, and Bint Jbeil where most of the urgent reconstruction activities are. The concrete hollow block is expected to have a positive effect on the whole socio - economic environment of the caza.
Marjeyoun - Feasibility Study – Concrete Hollow Block Factory V.2
14