DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
2 of 18
Company Proj. No.: EF/1852
TABLE OF CONTENTS ABBREVIATIONS
4
1.
PROJECT INTRODUCTION
4
1.1
PROJECT OVERVIEW
4
2.
INTRODUCTION AND SCOPE
4
2.1
INTRODUCTION
4
2.2
SCOPE
4
3.
DEFINITIONS
5
4.
REFERENCES
5
4.1
INDUSTRY CODES AND STANDARDS
5
4.2
OTHER COMPANY STANDARDS AND SPECIFICATIONS
6
4.3
LOCAL STANDARDS & STATUTORY REGULATIONS
7
4.4
ORDER OF PRECEDENCE
7
5.
DESCRIPTION
8
5.1
GENERAL NOTES FOR PIPE SUPPORTS
8
5.2
PIPE SPAN FOR CARBON STEEL PIPES
12
5.3
PIPE SPAN FOR STAINLESS STEEL PIPES
14
5.4
PIPE SPAN FOR CU-NI PIPES
15
5.5
RECOMMENDED GUIDE SPAN CHART
17
5.6
PRELIMINARY SPAN FOR RTRP PIPE
17
6.
ATTACHMENTS
18
ATTACHMENT– 1 MATERIAL SELECTION CHART - PRIMARY SUPPORTS
(04 SHEETS)
ATTACHMENT -2 SELECTION CHART – PRIMARY SUPPORTS
(09 SHEETS)
ATTACHMENT -3 SUPPORT DRAWINGS - PRIMARY SUPPORTS
(84 SHEETS)
ATTACHMENT -4 SUPPORT DRAWINGS - SECONDARY SUPPORTS
(53 SHEETS)
DOC. TITLE : PIPE SUPPORTS STANDARD Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
3 of 18
Company Proj. No.: EF/1852
ABBREVIATIONS: EPC FEED GA HAC HSE ISO KOC LP MBOPD MBWPD MMSCFD MR MSS MTO NPS O&M P&ID PDMS PMS PR SI TBE TQ QA QC AIV / FIV NB A/G NDE ITP EEMUA ASME ASTM BS
Engineering Procurement and Construction Front End Engineering and Design General Arrangement Hazardous area classification Health Safety & Environment Department International Organization for Standardization Kuwait Oil Company Low Pressure Thousand U.S Barrels of Oil Per Day Thousand U.S Barrels of Water Per Day Million Standard Cubic Feet Per Day Inquiry Requisition Manufacturers Standardization Society of the valve and fittings Industry Inc. Material Take-off Nominal Pipe Size Operation and Maintenance Piping & Instrumentation Diagram Plant Design & Management System Piping Material Specifications Purchase Requisition International System of units Technical Bid Evaluation Technical Query Quality Audit Quality control Acoustic induced vibration / flow induced vibration Nominal Bore (Pipe Size) Above Ground Nondestructive Examination Inspection and Testing Plan The Engineering Equipment And Materials Users' Association American Society of Mechanical Engineers American Society for Testing and Materials British Standards
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
1. 1.1
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
4 of 18
Company Proj. No.: EF/1852
PROJECT INTRODUCTION Project Overview Kuwait Oil Company (K.S.C), hereafter called COMPANY, have awarded the consortium of Petrofac International Ltd. (Petrofac) and Consolidated Contractors Group S.A.L(Offshore),thereafter called CONTRACTOR, the Works comprising all things to be done and services to be provided by CONTRACTOR including but not limited to the engineering design, procurement of Material, expediting, shipping, placement of Subcontracts,
project
management,
construction,
inspection,
testing,
pre-
commissioning, training of COMPANY personnel, commissioning, operation and maintenance
during
the
ramping
up
of
production
to
60
MBOPD
until
turnover, performance testing and all other works to complete the “Lower Fars Heavy Oil Development Program Phase-1 (60 MBOPD)” on a Lump Sum Turnkey (LSTK) basis, to provide COMPANY with complete, proven and operable facilities. Phase-1 facilities comprises of two well blocks which shall be designed to process a nominal 60,000 BOPD of heavy oil. The field shall be developed using thermal recovery process which shall employ Cyclic Steam Stimulation (CSS) followed by Steam Flood (SF). The broad scope involves development of Production Support Complex (PSC), Central Processing Facility (CPF), Well Blocks 02 and 03, Infield Satellite Station (ISS), Trunk And Steam Lines, Pipelines For Export Oil, Fuel Gas, Make Up And Disposal Water, Sub Stations, New Storage Tanks along with Loading And Filling Manifolds and New Crude Oil Control Centre (COCC) And Pumps In South Tank Farm (STF). 2. 2.1
INTRODUCTION AND SCOPE Introduction This specification defines the general design, construction criteria and the technical requirements for above ground Pipe Supports.
2.2
Scope This document covers the details of Engineering, Design, QA and QC of support fabrication, general requirements and accommodation for the selection and use of pipe supports for piping systems for the project. This specification may not be extended to the piping systems furnished within a manufacturer’s package assembly / skids.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
3.
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
5 of 18
Company Proj. No.: EF/1852
DEFINITIONS For the purpose of this document the following definitions shall apply: COMPANY means Kuwait Oil Company (K.S.C). CONTRACTOR / PURCHASER mean the person, firm or company identified as such in the Contract Agreement and includes its successors and permitted assignees. VENDOR means the party that manufactures and / or supplies equipment. SUB-VENDOR means the party supplying goods, equipment or material specified by the VENDOR.
4.
REFERENCES The engineering of the project shall be carried out on the basis of certain specifications and standards listed below.
4.1
Industry codes and standards International standards shall be used as referenced in the project specifications and KOC standards. Common international standards applicable to piping are listed below. The latest revisions of codes and standards prevailing on the effective date of bid submission, July 2014 shall be followed. The use of later revisions shall be agreed with Company. Standard No.
Description
ASME B31.1
Power Piping
ASME B31.3 (2012)
Process Piping
ASME B31.4
Pipeline Transportation Systems for Liquids & Slurries
ASME B31.8
Gas Transmission and Distribution Piping Systems
Annual Books of ASTM Standards
Iron and steel Products Steel Piping’s, Tubing’s and Fittings Ferrous Castings and Ferro alloys Steel plate, Sheet, Strip and Wire Steel-Bar, Forgings and Springs
DOC. TITLE : PIPE SUPPORTS STANDARD Contract No. : 15050901
DOC. No. :
REV.:B
15050901-000-00-PI-PSS-0001
BSI BS EN 10025
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
6 of 18
Company Proj. No.: EF/1852
Specification for Hot rolled Products of non-alloy Structural Steels and their technical delivery conditions
MSS-SP-58
Piping Hangers and Supports, Material Design, Manufacture, Selection, Application and Installation
ASTM A 36 4.2 A)
Standard Specification for Carbon Structural Steel
Other Company Standards and specifications KOC Standards KOC Engineering standards listed below will be complied with as relevant. Document No. KOC-G-007
Description KOC STANDARD FOR BASIS DESIGN DATA
KOC-P-001
KOC STANDARD FOR PAINTING AND COATING OF EXTERNAL METAL SURFACES
KOC-C-001
KOC STANDARD FOR BASIC CIVIL ENGINEERING DESIGN DATA
KOC-C-002
KOC RECOMMENDED PRACTICE FOR ENGINEERING DESIGN BASIS OF CIVIL AND STRUCTURAL WORK
KOC-C-007
KOC STANDARD FOR STRUCTURAL STEEL WORKMATERIALS, FABRICATION AND ERECTION
KOC-G-004
KOC STANDARD FOR PACKING MARKING AND DOCUMENTATION
KOC-Q-014
KOC STANDARD FOR PROJECT QA/QC REQUIREMENTS
B)
Project Specifications Project specifications cover the technical requirements specific to the project as required by the contract. Important project specifications for piping are: Document No.
Description
15050901-000-00-PI-BOD-0001
Specification for Piping Design
15050901-000-00-PI-BOD-0002
Piping Stress Analysis Design basis
15050901-000-00-PI-SPC-0002
Piping Material Specification
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
7 of 18
Company Proj. No.: EF/1852
15050901-000-00-CI-BOD-0001
Civil And Structural Design Basis
15050901-000-00-ST-SPC-0001
Specification For Structural Steel Fabrication & Erection Works
For more details on codes and standards being followed and applicability, please refer to the latest revision of Doc. No.: KOC-Q-O14 - KOC Standard for Project QA/QC Requirements C)
Other Company Standards Document No.
Description
11C8972-00-CI-CRT-0001
CIVIL DESIGN CRITERIA
11C8972-00-ST-CRT-0001
CIVIL STRUCTURAL SPECIFICATION STRUCTURAL DESIGN CRITERIA
11C8972-00-PE-SPC-0006
SPECIFICATION FOR PIPING FABRICATION AND ERECTION
KOC-G-004
KOC STANDARD FOR PACKING MARKING AND DOCUMENTATION
B
4.3
11C8972-00-PE-SPC-0008
SPECIFICATION FOR WELDING REQUIREMENT
11C8972-00-PE-SPC-0002
SPECIFICATION FOR PIPING DESIGN
11C8972-00-PE-SPC-0019
SPECIFICATION FOR PIPE SUPPORTS
Local Standards & Statutory Regulations Local Standards, government regulations and laws, as applicable to the location of the project and as stipulated in the contract, shall be followed.
4.4
Order of Precedence The supply of Equipment, materials, services, and documentation shall be in accordance with the State of Kuwait and local rules and regulations and specific project requirements. In case of conflict on technical requirements, the following order of precedence shall apply: •
Specification
•
Data Sheets
•
Drawings
In case of conflict or differences in requirements of the codes and standards, the most stringent of such codes and standards as defined by Contractor/Company shall apply.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
5. 5.1
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
8 of 18
Company Proj. No.: EF/1852
DESCRIPTION General notes for pipe supports 1)
All dimensions shown in this specification are in mm, except for pipe & bolt size, unless otherwise noted.
2)
Supports directly attached to parent pipe or arrangement close for guiding or restraining pipe in any direction are designated as primary supports. On the isometric drawing, primary support types shall be indicated with Support illustration support codes / tags.
3)
Primary Pipe Supports shall be indicated on the piping isometric drawings through ‘Support illustration Code’ as per actual support detail. It should be part of Pipe Support Group of Bill of Material in the isometric drawing. On the Issued for Construction isometric drawing, the primary pipe support should be part of Pipe Support Group Bill of Material. Primary supports that are attached to piping element (i.e. wear pad & encirclement pad) shall be welded at shop & Trunnion shall be welded at field prior to hydro testing. Field or Shop welding as per project requirement as indicated in pipe support sketch.
4)
Secondary Pipe Supports shall be indicated on the piping isometric drawings through ‘Support illustration Code’ as per actual support detail. It should be part of Pipe Support Group of Bill of Material in the isometric drawing. Additionally all standard secondary pipe supports shall be uniquely numbered as per Pipe Support Numbering Philosophy of the project. (Refer Doc. No. : 3D Modelling Cad Procedure : 15050901-000-00-PI-PRO-0001)
5)
All steel sections and plates necessary for the fabrication of the pipe supports shall be in accordance with BS sections or equivalent. The material for all sections shall be as indicated in pipe support drawings.
6)
Pipes 1-1/2” and smaller are field supported. Supports indicated in the 3D model (Three dimensional) /2D (Two dimensional) drawings are for guidance only.
7)
Pick up support types (PUVU1, PUVU2, PUHU3 and PUVU4) shall be limited to isolated cases only, where other options are ruled out. However for thin pipe header (i.e. 10S) this option shall be avoided. These supports shall be used rarely and only after consultation with Stress Engineer.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
8)
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
9 of 18
Company Proj. No.: EF/1852
Fasteners, Nuts & Washers required for Primary support shall be as per Primary Support Material Selection Chart (Attachment-1). All carbon steel and alloy steel bolting including washers and U-bolts used for supports shall be supplied in hot dip galvanized condition in accordance with BS EN ISO 1461.
9)
Unless otherwise specified all bolting for secondary pipe supports shall be in accordance with Project Civil/Structural requirements. (Refer Doc. No. : Specification for structural steel fabrication and erection works: 15050901-000-00-ST-0001)
10)
SS/Teflon pad shall be introduced, if required, to minimize contact friction between pipes and supporting structure as per piping stress analysis requirements. However, such supports shall be minimized.
11)
Surface preparation and painting requirements shall be as per project painting specification “KOC-P-001- KOC Standard for Painting & Coating of External Metal Surfaces”.
12)
Pipe and supports shall not rest directly on concrete. Metal surface / metal base plate shall be provided on top of concrete. For avoiding galvanic corrosion, Stainless steel bearing plates (SS 316/316L, Support illustration code “BP”) shall be provided on the supporting steel wherever SS/DSS/SDSS piping rests directly on the steel. For AS/Cu-Ni pipes bearing plates of equivalent parent pipe plate material shall be used. Bearing plates are not required when pipes are provided with wear pad. For clamped shoe supports using LTCS clamps on SS/DSS/SDSS/AS pipes, SS 316/316L foils to be used between pipes & clamps.
13)
If PWHT requirements, if any for piping supports, shall be as per ASME B31.3 (based on pipe wall thickness). Please refer note 12 of Attachment – 2 for detail. However, for pipes requiring all welds to be post weld heat treated (As per process requirement); supports shall be of clamp type except at locations of line stops. At such welded support locations, PWHT shall be carried out.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
14)
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
10 of 18
Company Proj. No.: EF/1852
Loads indicated in this standard are the maximum allowable service loads. For structural steel supports, the horizontal load capacity shall be considered to be 0.3 times and 0.15 times of vertical load capacity in the longitudinal and lateral pipe direction respectively.
15)
For structural supports, the maximum loads given are valid for particular dimensions (e.g. L, H) and shall be used as a guideline for selecting the supports. Dimensions and loads other than those mentioned may be used after verifying the same for structural integrity.
16)
Temporary supports required for hydro testing, maintenance will be identified and marked on isometric with suitable note (Temporary Support). This support must be taken out physically during operating condition of pipe line to that; it will be not arrest piping displacement. This identification of temporary supports will be limited to supports near spring supports and at removable spools only, if any.
17)
Structural sections indicated in the standard support details may be replaced by equivalent approved sections of comparable dimensions and strength.
18)
Structural sections indicated in the standard may be fabricated from plate in compliance with following : a)
Plate thickness shall be equal or more than that of standard structural sections.
b)
Strength of plate material shall be equal or more than that of standard structural sections.
c)
Details of welding (Fillet/Full penetration, and size of welds etc.) and NDE for welds shall be proposed by manufacturer, for Contractor’s approval, and shall be included in ITP/suitable Quality Control documents.
d)
Proper care shall be taken to avoid warping during welding. Manufacturer shall propose precautions to be taken and inspection criteria, for Contractor’s approval, and shall be included in ITP/suitable Quality Control documents.
19)
All fillet welds shall be 6 mm or pipe wall/plate thickness being welded, whichever is less, unless noted otherwise in the standard details.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
20)
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
11 of 18
Company Proj. No.: EF/1852
For supports on horizontal insulated pipe of size 1.5” & below, without slope, insulation at bottom half of pipe shall be cut 50 mm on either side of supporting member. For supports on vertical insulated pipe of size 1.5” & below, half pipe insulation towards supporting member shall be cut 50 mm on either side of supporting member.
21)
Unless otherwise specified in the isometrics, the gaps indicated in the support standard are to be maintained.
22)
For shoes on insulated lines, slots may be incorporated suitably in the shoe assembly to accommodate insulation straps/tracer lines to suit field requirements. Slot details provided/shown in shoe detail drawing are for references and may be omitted wherever not required.
23)
The bought out items shall be clearly marked with part no. wherever applicable.
24)
Supports which need to be assembled (Fabricated parts with Bought out items) shall be identified with part number for easy traceability.
25)
Supports for lines with acoustic insulation shall be isolated by providing vibration absorbing pad assemblies under the pipe supports. Guides and stops on these lines shall be provided with vibration absorbing pad assembly (APS, APG and APLS).
26)
Pipe for trunnion, reinforcement pad, if any shall be as per parent pipe specification and shall reflect on isometric as a part of piping MTO and to be included in piping bill of materials
27)
Details of Vessel Support Clips shall be internally issued to Mechanical group.
28)
Height of support (Primary or Secondary) to be used along with ‘PBC’ type support shall have 200 mm extra length to be adjusted at site to cater for sloping requirement of concrete paving.
29)
Small bore connection subjected to FIV/AIV shall be provided with two plane bracing (DBVD/DCBCD type supports).
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
12 of 18
Company Proj. No.: EF/1852
Apart from AIV/FIV recommendations, where ever stress engineer recommends based on the connection, orientation, length, attached valve / component weights, than that particular location shall be provided with bracing as per support standards. 30)
All supports shall be designed for design life of 25 years.
31)
Suitable Boundary conditions and support type shall be considered at interface point between metallic and RTRP pipe to arrest the displacement of metallic piping getting transferred to RTRP.
32)
Clamp shoe shall not be used for lines connected to reciprocating compressors and pumps. Preference to given for welded shoe.
5.2
Pipe Span for Carbon Steel Pipes The data below is applicable for: •
Carbon steel pipes (Sch. 80 (XS) or higher for sizes 0.5” to 2”, Sch. STD or higher for sizes 3” to 12”, Sch. 20 or higher for sizes 14” to 24” and Std. Sch. or higher for 26” to 48”). Maximum Allowable Bending Stress considered is 40 N/mm2 and allowable
•
deflection considered is 12.7 mm.
•
The weight of insulation and cladding is based on insulation thickness varying from 40 mm for pipe up to 2”, 50 mm for NB 3” to 4” pipe, 65mm for 8” to 10”, 75mm for NB 12” to 48” pipe and a density of 150 Kg/m3.
NOMINAL PIPE SIZE NB. (INCH)
MAXIMUM SPAN ‘ L’ (mm), (NOTES 1 to 5) VAPOUR SERVICE WATER SERVICE BARE INSULATED BARE INSULATED
0.50”
2900 (4200*)
2700 (3500*)
2900 (4200*)
2700 (3500*)
0.75” 1”
3400 (4900*)
3100 (4200*)
3300 (4800*)
3100 (4200*)
3800 (5600*)
3600 (5000*)
3800 (5500*)
3600 (4900*)
1.50” 2”
4700 (7000*)
4500 (6500*)
4600 (6900*)
4400 (6300*)
5300 (8000*)
5100 (7600*)
5200 (7800*)
5000 (7200*)
3” 4”
6500 (9800*)
6300 (9400*)
6300 (9300*)
6000 (8400*)
7500 (11200*)
7300 (10900*)
7000 (10300*)
6800 (9600*)
6”
9200 (13800*)
9000 (13500*)
8400 (12000*)
8100 (11200*)
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
NOMINAL PIPE SIZE NB. (INCH)
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
13 of 18
Company Proj. No.: EF/1852
MAXIMUM SPAN ‘ L’ (mm), (NOTES 1 to 5) VAPOUR SERVICE WATER SERVICE BARE INSULATED BARE INSULATED
8”
10600 (15800*)
10400 (15500*)
9500 (13400*)
9200 (12700*)
10” 12” 14” 16” 18” 20”
11800 (17700*)
11600 (17400*)
10500 (14700*)
10200 (14000*)
12900 (19300*)
12700 (19000*)
11200 (15500*)
11000 (14800*)
13500 (20200*)
13300 (20000*)
11300 (15100*)
11100 (14400*)
14400 (21600*)
14300 (21400*)
11900 (15500*)
11600 (14800*)
15300 (23000*)
15200 (22700*)
12400 (15800*)
12100 (15200*)
16200 (24200*)
16000 (24000*)
13200 (17100*)
13000 (16600*)
24”
17700 (26500*)
17600 (26300*)
14100 (17700*)
13900 (17200*)
26” 28” 30” 32” 34” 36” 40” 42”
18700 (28000*)
18500 (27700*)
14400 (17900*)
14200 (17400*)
19400 (29000*)
19200 (28700*)
14800 (18100*)
14400 (17700*)
20100 (30100*)
19900 (29800*)
14900 (18300*)
14600 (17900*)
21300 (31900*)
20600 (30800*)
15100 (18500*)
14700 (18100*)
21700 (32500*)
21200 (31700*)
15200 (18600*)
14900 (18200*)
22400 (33500*)
21800 (32700*)
15300 (18800*)
15000 (18400*)
22600 (33900*)
21800 (32700*)
15300 (18800*)
15000 (18400*)
24500 (36600*)
23600 (35300*)
15600 (19100*)
15300 (18800*)
24500 (36600*) 23600 (35300*) 15600 (19100*) 15300 (18800*) 48” *Marked pipe spans are calculated based on fixed beam method. These shall be
used for continuous run of pipes on pipe ways like racks/ sleepers. However for supports near to the pipe change in directions/ends, continuous span cannot be applied
NOTES: 1) Spans are based on straight pipe Other configuration shall be multiplied by a shape factor as per above sketch 2) Free draining pipes with a slope less than 1:1000 require an additional check of the span
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
14 of 18
Company Proj. No.: EF/1852
3) All inline items shall be placed close to Pipe Support location 4) Where the fluid has specific gravity greater than water, the spacing shall be reduced accordingly 5) Pipe spans shown in the above table are maximum permitted values as per the indicated basis. However the actual span shall be decided to ensure an optimum design 5.3
Pipe Span for Stainless Steel Pipes The data below is applicable for: •
Stainless Steel pipes/Duplex Stainless Steel pipes/Super Duplex Stainless Steel pipes (Sch 40S or higher for sizes up to 2”, Sch 10S or higher for sizes 3” to 30” Pipe).
•
Maximum Allowable Bending Stress considered is 40 N/mm2 and allowable deflection considered is 12.7 mm.
•
The weight of insulation and cladding is based on insulation thickness varying from 40 mm for pipe up to 2”, 50 mm for NB 3” to 4” pipe, 65mm for 8” to 10”, 75mm for NB 12” to 30” pipe and a density of 150 Kg/m3.
NOMINAL PIPE SIZE NB. (INCH)
MAXIMUM SPAN ‘ L’ (mm), (NOTES 1 to 5) VAPOUR SERVICE WATER SERVICE BARE INSULATED BARE INSULATED
0.50” 0.75”
3200 (4800*)
2700 (3600*)
3100 (4600*)
2600 (3500*)
3600 (5400*)
3100 (4300*)
3400 (5200*)
3000 (4100*)
1” 1.50”
4100 (6100*)
3600 (5200*)
3900 (5800*)
3500 (4900*)
4900 (7400*)
4500 (6700*)
4600 (6900*)
4300 (6100*)
2” 3” 4” 6”
5600 (8300*)
5200 (7700*)
5100 (7700*)
4800 (6800*)
6800 (10200*)
6200 (9200*)
5900 (8400*)
5500 (7400*)
7600 (11400*)
7100 (10700*)
6500 (8900*)
6200 (8100*)
9200 (13800*)
8600 (12900*)
7600 (10000*)
7200 (9100*)
8” 10” 12”
10600 (15800*)
10000 (14900*)
8400 (10900*)
8100 (10100*)
11800 (17700*)
11300 (16900*)
9300 (11700*)
9000 (11100*)
12900 (19300*)
12200 (18300*)
9900 (12400*)
9600 (11700*)
14”
13500 (20200*)
12900 (19300*)
10300 (12800*)
9900 (12100*)
16” 18”
14400 (21600*)
13800 (20700*)
10600 (13000*)
10100 (12400*)
15300 (22900*)
14700 (22000*)
10800 (13200*)
10400 (12700*)
20” 24”
16200 (24200*)
15600 (23400*)
11600 (14200*)
11100 (13700*)
17700 (26500*)
17300 (25800*)
12500 (15300*)
12100 (14800*)
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
REV.:B
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
15 of 18
Company Proj. No.: EF/1852
MAXIMUM SPAN ‘ L’ (mm), (NOTES 1 to 5) VAPOUR SERVICE WATER SERVICE BARE INSULATED BARE INSULATED
NOMINAL PIPE SIZE NB. (INCH) 26” 28” 30”
15050901-000-00-PI-PSS-0001
PAGE
19000 (28500*)
18200 (27200*)
13700 (16800*)
13300 (16300*)
19700 (29500*)
18900 (28200*)
13800 (16900*)
13500 (16500*)
20400 (30600*)
19500 (29200*)
13900 (17100*)
13600 (16700*)
*Marked pipe spans are calculated based on fixed beam method .These shall be used for continuous run of pipes on pipe ways like racks/ sleeper’s .However for supports near to the pipe change in directions/ends, continuous span cannot be applied.
NOTES: 1) Spans are based on straight pipe. Other configuration shall be multiplied by a shape factor as per above sketch. 2) Free draining pipes with a slope less than 1:1000 require an additional check of the span. 3) All inline items shall be placed close to Pipe Support location. 4) Where the fluid has specific gravity greater than water, the spacing shall be reduced accordingly. 5) Pipe spans shown in the above table are maximum permitted values as per the indicated basis. However the actual span shall be decided to ensure an optimum design. 5.4
Pipe Span for CU-NI Pipes The data below is applicable for: Cu-Ni pipes (Pipe sizes as per Table 1.2.1 of EEMUA-144) : 16 Bar and 20 bar Rating
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
•
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
16 of 18
Company Proj. No.: EF/1852
Maximum Allowable Bending Stress considered is 20 N/mm2 and allowable deflection considered is 12.7 mm.
NOMINAL PIPE SIZE NB (INCH)
MAXIMUM SPAN ‘ L’ (mm), (NOTES 1 to 5) WATER SERVICE- BARE
0.5”
2200 (2700*)
0.75”
2700 (3300*)
1”
3000 (3600*)
1.5”
3500 (4300*)
2”
3800 (4700*)
3”
4300 (5300*)
*Marked pipe spans are calculated based on fixed beam methods. These shall be used for continuous run of pipes on pipe ways like racks/ sleepers However for supports near to the pipe change in directions/ends, continuous span cannot be applied.
NOTES: 1)
Spans are based on straight pipe. Other configuration shall be multiplied by a shape factor as per above sketch.
2)
Free draining pipes with a slope less than 1:1000 require an additional check of the span.
3)
All inline items shall be placed close to Pipe Support location.
4)
Where the fluid has specific gravity greater than water, the spacing shall be reduced accordingly.
DOC. TITLE : PIPE SUPPORTS STANDARD DOC. No. :
Contract No. : 15050901
5)
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
17 of 18
Company Proj. No.: EF/1852
Pipe spans shown in the above table are maximum permitted values as per the indicated basis. However the actual span shall be decided to ensure an optimum design.
5.5
Recommended Guide Span Chart
VERTICAL PIPE
12000
SPACING (mm) ON LOOP ENDS(Refer Note) 6000
3"
15000
9000
8000
4"
18000
12000
9000
6"
18000
12000
9000
8" – 12"
18000
18000
12000
14" – 20"
24000
18000
12000
24" & Above
24000
18000
12000
PIPE SIZE (INCH)
HORIZONTAL PIPE
Up to 2"
8000
Note: The above table is for reference only. Actual selection of guide location shall ensure that high thermal load due to restriction on pipe movement is avoided. 5.6
Preliminary Span for RTRP Pipe The pipe span for A/G RTRP piping shall be as per RTRP Vendor recommendations. However, the below table can be used for preliminary design which needs to be confirm with RTRP Vendor. Size NB (Inch) 3” 4” 6” 8” 10” 12” 14” 16” 18” 20” 24” & above
Support Span as per ISO 14692 (mm) 2900 3100 3500 3700 4000 4200 4800 4800 4800 5500 6000
DOC. TITLE : PIPE SUPPORTS STANDARD Contract No. : 15050901
6.
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
18 of 18
Company Proj. No.: EF/1852
ATTACHMENTS ATTACHMENT - 1 MATERIAL SELECTION CHART - PRIMARY SUPPORTS (04 SHEETS) ATTACHMENT - 2 SELECTION CHART – PRIMARY SUPPORTS (09 SHEETS) ATTACHMENT - 3 SUPPORT DRAWINGS - PRIMARY SUPPORTS (84 SHEETS) ATTACHMENT - 4 SUPPORT DRAWINGS - SECONDARY SUPPORTS (53 SHEETS)
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 1 Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
ATTACHMENT– 1
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
1 of 4
Company Proj. No.: EF/1852
MATERIAL SELECTION CHART-PRIMARY SUPPORTS (04 Sheets)
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 1 DOC. No. :
Contract No. : 15050901
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
2 of 4
Company Proj. No.: EF/1852
ATTACHMENT–1: MATERIAL SELECTION CHART-PRIMARY SUPPORTS PRIMARY SUPPORT MATERIAL CODE
PIPE MATERIAL
CS CS/ CS -FBE LINED/ CS-GALV. / CS -Ni ALLOY CLAD
SS/DSS/SDSS
SS / DSS/SDSS (Up to - 460 C)
CN
Cu-Ni
WEAR PADS
SAME AS PIPE MATERIAL
SAME AS PIPE MATERIAL
SAME AS PIPE MATERIAL
PIPES FOR TRUNNION
SAME AS PIPE MATERIAL
SAME AS PIPE MATERIAL
SAME AS PIPE MATERIAL
BS EN 10025 S275 J0/J2
BS EN 10025 S355 NL/ML WITH SS 316/316L FOIL
BS EN 10025 S275 J0/J2 WITH NEOPRENE PAD
BS EN 10025 S275 J0/J2
BS EN 10025 S355 NL/ML (WITH WP ON PIPE IN CASE OF DIRECTLY WELDED TO PIPE)
BS EN 10025 S275 J0/J2 (WITH WP ON PIPE IN CASE OF DIRECTLY WELDED TO PIPE)
PIPE CLAMPS
STRUCTURAL MEMBER / PLATES FOR SHOES
PLATE / STRUCTURAL MEMBER FOR AXIAL STOP ON BARE LINE (DIRECTLY WELDED TO PIPE WALL)
BS EN 10025 S275 JR
BS EN 10025 S355 NL/ML (WITH WP ON PIPE )
BS EN 10025 S275 J0/J2 (WITH WP ON PIPE IN CASE OF DIRECTLY WELDED TO PIPE)
BEARING PLATE
Not Applicable
ASTM A 240 TP 316/316L
ASTM B 171 UNS C70600
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 1 DOC. No. :
Contract No. : 15050901
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
3 of 4
Company Proj. No.: EF/1852
ATTACHMENT–1: MATERIAL SELECTION CHART-PRIMARY SUPPORTS
PRIMARY SUPPORT MATERIAL CODE
CS
SS / DSS/SDSS
CN
CS/ CS -FBE LINED/ CS-GALV. / CS -Ni ALLOY CLAD
SS/DSS/SDSS (Up to - 460 C)
Cu-Ni
U- BOLTS & NUTS/FASTENERS FOR CLAMPS
A 193 GR.B7 / A 194 GR.2H (ELECTRO-ZINC PLATED IN ACCORDANCE TO ASTM B 633 )
A 193 Gr.B8 CL.1 & A 194 Gr.8
A 193 GR.B7/ A 194 GR.2H FOR NUTS/FASTNERS OF CLAMPS AND A 193 GR.B7/ A 194 GR.2H WITH NEOPRENE SLEEVE/SHEATH FOR U-BOLTS
STRUCTURAL MEMBER/PLATE FOR GUIDES AND STOPS ON SHOE
BS EN 10025 S275 JR OR ASTM A 36
BS EN 10025 S275 JR OR ASTM A 36
BS EN 10025 S275 JR OR ASTM A 36
BASE PLATE FOR TRUNNIONS
BS EN 10025 S275 JR
BS EN 10025 S355 NL/ML
BS EN 10025 S275 JR
BS EN 10025 S275 JR
BS EN 10025 S275 JR
PLATES FOR GUIDES ON BARE PIPE
BS EN 10025 S275 JR
BS EN 10025 S275 JR WITH SS 316/316L PLATE ON GUIDE
BS EN 10025 S275 JR WITH CU-NI PLATE ON GUIDE
WASHERS
BS EN 4320 GRADE E (ELECTRO-ZINC PLATED IN ACCORDANCE TO ASTM B 633 )
SS 316/316L
NEOPRENE COATED
PIPE MATERIAL
END PLATE FOR TRUNNIONS
BS EN 10025 S275 JR
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 1 Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
4 of 4
Company Proj. No.: EF/1852
Notes: Charpy Impact (V-Notch) test shall be carried out for Grade S275 J0/J2 at -290 C. The test 1
value shall not be less than 27J average for 3 specimens and not less than 20J for any specimen.
2
Acceptable Grades in lieu of BS EN 10025 S355 NL/ML are BS EN S355 J2G3/ BS EN 355 K2G3, with impact test as per S355 NL/ML. Charpy Impact (V-Notch) test shall be carried out for Grade S275 JR at 0°C for elements
3
more than 30mm. The test value shall not be less than 27J average for 3 specimens and not less than 20J for any specimen.
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
ATTACHMENT– 2
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
1 of 9
Company Proj. No.: EF/1852
SELECTION CHART –PRIMARY SUPPORTS (09 SHEETS)
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
2 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2 : SELECTION CHART - PRIMARY SUPPORTS : REST/ SHOES PIPE
REST SUPPORTS
SUPPORT TYPE
RESTHORIZONTAL LINE
RESTSLOPING LINE
RESTVERTICAL LINE
SUPPORT CODES
SIZE RANGE (INCH)
CS/CS- INTERNALLY CLADDED/LTCS PIPES
SS, DSS & SDSS
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
DIRECT REST
DIRECT REST (NOTE - 1)
BP
BP (NOTE - 1)
2
16
DIRECT REST (NOTE- 2)
S1 / S2 (NOTE – 2, 20)
BP/WP (NOTE - 2)
S2/WP+S1 (NOTE -3)
18
24
DIRECT REST (NOTE- 2)
S1 / S2 ( NOTE - 2,20)
BP/WP (NOTE - 2)
S2/WP+S1 (NOTE -3)
26
48
WP
(WP+S1)
WP
S2/WP+S1 (NOTE-3)
1.5
16
S3
S3
S3+WP / S4 ( NOTE- 3)
S3+WP /S4 ( NOTE - 3)
18
48
S3 (NOTE - 2) / S4 (NOTE-16,20)
S3 (NOTE - 2) / S4 (NOTE-16,20)
S3+WP / S4 ( NOTE – 2, 3)
S3+WP / S4 ( NOTE – 2, 3)
0.5
2
UBF
S1+SLS1
UBF+BP
WP+S1/S2 +SLS1 (NOTE - 2,4)
3
48
NOTE - 5
NOTE - 5
NOTE - 5
NOTE - 5
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
3 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2 : SELECTION CHART - PRIMARY SUPPORTS : REST/ SHOES PIPE
SUPPORT CODES
SIZE RANGE (INCH)
REST SUPPORTS
RESTHORIZONTAL LINE
RESTSLOPING LINE
GI
CS- EPOXY/FBE LINED
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
DIRECT REST
DIRECT REST ( Note- 1)
BP (CU-NI LINES)
S2 (CU-NI LINES)
2
16
DIRECT REST
S2
DIRECT REST ( Note- 2)
S2
18
24
-
-
S2
S2
26
34
-
-
S2
S2
36
48
-
-
S2
S2
1.5
16
S4
S4
S4
S4
18
24
-
-
S4
S4
26
48
-
-
S4
S4
0.5
2
UBF
UBF
UBF (CU-NI LINES)
UBF (CU-NI LINES)
3
48
NOTE-5
NOTE-5
NOTE-5
NOTE-5
RESTVERTICAL LINE
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
4 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2 SELECTION CHART - PRIMARY SUPPORTS : GUIDES PIPE
SUPPORT CODES
SIZE RANGE (INCH)
CS/ CS- INTERNALLY CLADDED/LTCS PIPES
SS , DSS & SDSS
SUPPORT TYPE
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
G1/UBG
G1/UBG
G5/UBG+BP
G5/UBG+BP
2
16
G1/G2
SG1/SG3
G5/G6
SG1/SG3
18
24
G1/G2
SG1/SG3
G5/G6
SG1/SG3
24
34
G3
SG1/SG3
G7
SG1/SG3
36
48
SG1 / SG3/SG3A
SG1 / SG3/SG3A
0.5
1.5
UBG
UBG
UBG
UBG
2
4
UBG
SG2
UBG
SG2
6
24
G4/FCG (NOTE -6)
SG2
G8/FCG ( NOTE-6)
SG2
26
34
FCG (NOTE 6)
SG2
FCG (NOTE 6)
SG2
36
48
SG2/SG2A
SG2/SG2A
GUIDESLOPING LINE
1.5
62
SG1 / SG3/SG3A
SG1/ SG3/SG3A
SG1 / SG3/SG3A
SG1 / SG3/SG3A
GUIDE+ HOLD DOWNSLOPING LINE
1.5
48
SG2/SG2A
SG2/SG2A
SG2/SG2A
SG2/SG2A
0.5
1.5
UBG
UBG
UBG
UBG
2
4
UBG
SG1/SG2 (NOTE-7)
UBG
SG1/SG2 (NOTE-7)
6
24
G1/G2
SG1/SG2 /SG3 (Note-7)
G5/G6
SG1/SG2 /SG3 (Note-7)
24
34
G3
SG1/SG2 / SG3 (Note-7)
G7
SG1/SG2 /SG3 (Note-7)
36
48
SG1/SG2 /SG2A /SG3/SG3A (Note-7)
SG1/SG2 /SG2A /SG3/SG3A (Note-7)
GUIDE SUPPORTS
GUIDEHOROZONTAL LINE
GUIDE+ HOLD DOWNHORIZONTAL LINE
GUIDE VERTICAL LINE
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
5 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2
SELECTION CHART - PRIMARY SUPPORTS : GUIDES PIPE
SUPPORT TYPE
GUIDEHOROZONTAL LINE
GUIDE SUPPORTS
GUIDE+ HOLD DOWNHORIZONTAL LINE
GUIDE- SLOPING LINE GUIDE+ HOLD DOWNSLOPING LINE
GUIDE VERTICAL LINE
SUPPORT CODES
SIZE RANGE (INCH)
GI
CS-EPOXY/FBE LINED
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
G1/UBG
G1/UBG
G1/UBG
G1/UBG
2
16
G1/G2
SG1/SG3
G1/G2
SG1/SG3
18
24
-
-
G1/G2
SG1/SG3
26
34
-
-
G3
SG1/SG3
36
48
-
-
SG1/SG3
SG1/SG3
0.5
1.5
UBG
UBG
UBG
UBG
2
4
UBG
SG2
UBG
SG2
6
24
SG2
G4/FCG (NOTE-6)
SG2
26
34
- FCG (NOTE-6)
SG2-
36
48
SG2
SG2
1.5
48
SG1/SG3
SG1/SG3
SG1/SG3
SG1/SG3
1.5
48
SG2
SG2
SG2
SG2
0.5
1.5
UBG
UBG
UBG
UBG
2
4
UBG
S G1/SG2 ( NOTE-7
UBG
SG1/SG2 (NOTE-7)
6
24
G1/G2
SG1/SG2/SG3 ( NOTE-7)
G1/G2
SG1/SG2/SG 3 (NOTE-7)
26
34
-
- G3
SG1/SG2/SG3(NOTE-7)
36
48
-
SG1/SG2/ SG3 ( NOTE-7)
SG1/SG2/SG3 ( NOTE-7)
UBG/FCG
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
6 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2 SELECTION CHART – PRIMARY SUPPORTS : LINE STOPS / AXIAL STOPS PIPE
LINE STOPS
SUPPORT TYPE
LINE STOPHORIZONTAL LINE
LINE STOPSLOPING LINE
SUPPORT CODES
SIZE RANGE (INCH)
CS/ CS- INTERNALLY CLADDED /LTCS PIPES
SS , DSS & SDSS
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
UBF/LS1
UBF/LS1
UBF
UBF
2
4
LS1
SLS1
WP+LS1 (NOTE-2,8)
SLS1
6
16
LS1 (NOTE-2)
SLS1/SLS2
WP+LS1 (NOTE-2,8)
18
24
LS1 (NOTE-2)
SLS1/SLS2
26
34
LS1 (NOTE-2)
SLS1/SLS2
36
48
SLS1/SLS2/ SLS2A
1.5
48
SLS1/ SLS2/SLS2A
SLS1/SLS2/ SLS2A
SLS1/ SLS2/SLS2A
WP+LS1 (NOTE-2,8)
SLS1/SLS2
SLS1/SLS2
WP+LS1 (NOTE-2,8)
SLS1/SLS2
SLS1/SLS2/ SLS2A
SLS1/SLS2/ SLS2A
SLS1/ SLS2/SLS2A
SLS1/ SLS2/SLS2A
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
7 of 9
Company Proj. No.: EF/1852
ATTACHMENT-2 : SELECTION CHART - PRIMARY SUPPORTS : LINE STOPS / AXIAL STOPS PIPE
LINE STOPS
SUPPORT TYPE
LINE STOPHORIZONTAL LINE
LINE STOPSLOPING LINE
SUPPORT CODES
SIZE RANGE (INCH)
GI
CS-EPOXY/FBE LINED
FROM
TO
UN INSULATED
HOT INSULATED
UN INSULATED
HOT INSULATED
0.5
1.5
UBF
UBF
UBF
UBF
2
4
UBF
SLS1 ( NOTE-18)
UBF
SLS1(NOTE-19)
6
16
LS1 (NOTE-9)
SLS1/SLS2 (NOTE-18)
LS1 (NOTE-9)
SLS1/SLS2 ( NOTE-19)
18
24
LS1 (NOTE-9)
SLS1/SLS2 ( NOTE-19)
26
34
-
-
LS1 (NOTE-9)
SLS1/SLS2 ( NOTE-19)
36
48
-
-
SLS1/SLS2 (NOTE-19)
SLS1/SLS2 ( NOTE-19)
1.5
48
SLS1/ SLS2/ SLS2A
SLS1/ SLS2/ SLS2A
SLS1/ SLS2/ SLS2A
SLS1/ SLS2/ SLS2A
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 DOC. No. :
Contract No. : 15050901
NOTES:
1
2
3 4 5 6 7 8 9 10 11
12
13
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
8 of 9
Company Proj. No.: EF/1852
ATTACHMENT 2: SUPPORT SELECTION PRIMARY SUPPORTS
For supports on horizontal insulated pipe of size 1.5” & below, without slope, insulation at bottom half of pipe shall be cut 50mm on either side of supporting member. For supports on vertical insulated pipe of size 1.5” & below, half pipe insulation towards supporting member shall be cut 50mm on either side of supporting member. a) Wear Pad is to be provided for : • All CS Pipe material - bare pipe sizes 18” NB and above with wall thickness schedule STD and below. • All SS Pipe material - bare pipe sizes 16” NB and above with wall thickness schedule 10S and below. b) For other pipe sizes Wear Pad requirement shall be checked by Stress Engineer based on available contact length of supporting member. For these Lines first preference shall be clamped type shoes instead of welded shoes. For lines requiring clamped shoes, at axial stop locations, a combination of welded shoe and wear pad (if required) shall be used. However for lines subjected under AIV study or at downstream of PSV, the support at Axial stop location shall have encirclement pad. For rest support on vertical leg of pipe, use Trunnion/ UBF /suitable combination of available primary support as per pipe material. For 2 Phase flow lines, FCG type supports to be used based on feasibility checked by Stress Engineer. On vertical line, SG2 guide shall at as four directional guide For axial stops on bare SS lines, axial stop members shall be SS (same as parent pipe) or a combination of "WP + Axial stop" shall be used. For line stops on bare Nickel alloy lines line stop members shall be combination of “WP + line stop”. Availability of flange pair within 500mm from axial stop location to be verified and ensured. S5 Type shoes shall be used for SS lines when temperature is below -46º C. For vertical line above 4", trunnions are to be used for rest supports and selection shall be in accordance with pipe support standard. If PWHT requirements are as per B31.3 (based on pipe wall thickness), then lugs or other pipe supporting elements welded to pipe doesn’t require PWHT as long as thickness through the weld in any plane is less than twice the minimum material thickness requiring heat treatment. However for pipes requiring all welds to be performed PWHT (As per process requirement), support shall be of clamp type except at axial stops location. At such welded support locations, PWHT shall be carried out. PWHT requirement shall be reviewed as per project requirement to minimize use of clamps.
14
RTRP lines shall be supported as per RTRP vendor recommendation.
15
Line size 24" & above, the clamp shoe shall not be provided where lateral movement is expected i.e. for first two support from elbow at long length's turning point, and near/at expansion loop.
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 2 Contract No. : 15050901
16 17
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
9 of 9
Company Proj. No.: EF/1852
Lines subjected to Acoustic Induced Vibration (AIV) shall be supported with clamp type arrangement if recommended by AIV study., However at axial stop location for such lines welded support to be used with full encirclement pad (EP) Use of trunnion shall be minimized.
21
For shear lugs site welded on pipe at line stop locations for clamp type shoes, local galvanizing coat shall be done after welding. Use of welded supports shall be avoided for CS– Galvanized lines. For lines prefabricated and then galvanized, in cases where welded pipe supports directly attached to parent pipe are mandatory, welding of such supports shall be carried out prior to galvanizing. For galvanized lines in size ranges which are directly procured in pre-galvanized form, no welded supports shall be used. Use of welded supports shall be avoided for CS-FBE/EPOXY Lined pipes. In cases where welded pipe supports directly attached to parent pipe such as wear pads, lifting lugs, welded shoes, welded shoes with wear pad and trunnion are mandatory, welding of such supports shall be carried out prior to FBE/EPOXY coating. For locations where welded type shoes with line stops are unavoidable, it is to be ensured that break up flanges is available within 500-1000 mm from the location of line stops to perform repair of coating if required at site. For CS/LTCS Pipes with internal cladding (Ni-Alloy), preference shall be clamp type shoes instead of welded shoes to minimize welding. For line stop locations and higher guide load locations, welded shoes shall be used. For Secondary Supports with field weld, @ 100mm extra length to be provided for any Site adjustment.
22
Do not use guide “G3” or “G7” along with line stop tag “LS1” for 26” and above pipe size, as this arrangement cannot installed together.
18
19
20
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 3 Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
ATTACHMENT– 3
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
1 of 84
Company Proj. No.: EF/1852
SUPPORT DRAWINGS-PRIMARY SUPPORTS (84 SHEETS)
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 3 DOC. No. :
Contract No. : 15050901
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
2 of 84
Company Proj. No.: EF/1852
REVISION HISTORY
SUPPLY TYPE
REV.:B
15050901-000-00-PI-PSS-0001
ATTACHMENT-3 PRIMARY SUPPORTS INDEX
SL. NO.
TITLE
SUPPORT CODE
SHT. NO. REV 0
REV 1
REV 2
1
INDEX SHEET
-
2-5
-
-
-
B-
2
SYNOPTICS TABLE
-
6 - 14
-
-
-
-
REST SUPPORTS
-
3
WEAR PAD
WP
15
-
-
-
F
4
ENCIRCLEMENT PAD
EP
16
-
-
-
F
5
BEARING PLATE
BP
17
-
-
-
F
6
PIPE SHOE (1.5” – 16”)
S1
18
-
-
-
F
7
PIPE SHOE (18” – 24”)
S1
19
-
-
-
F
8
PIPE SHOE (26” – 48”)
S1
20
-
-
-
F
9
CLAMPED PIPE SHOE (1.5” – 48”)
S2
21
-
-
-
B+F
10
PIPE SHOE FOR SLOPING LINES (1.5” – 48”)
S3
22
-
-
-
F
11
CLAMPED PIPE SHOE FOR SLOPING LINES (1.5” – 48”)
S4
23
-
-
-
B+F
12
TRUNNION BASE SUPPORT (2” – 48”)
BS1/BS1P
24-25
-
-
-
F
13
SINGLE TRUNNION (WITH OR WITHOUT PAD)
ST1/ ST1P
26
-
-
-
F
14
TRUNNION ON ELBOW FOR BARE PIPE
DLD/DLU
27
-
-
-
F
15
TRUNNION ON ELBOW (WITH SHOE OPTION)
SDLD/ SDLU
28
-
-
-
F
16
DOUBLE TRUNNION ON VERTICAL LINES (WITH / WITHOUT PAD) - 2” TO 48”
DT1/ DT1P
29
-
-
-
F
17
TRUNION ON ELBOW FOR BARE PIPE
DLH
30
-
-
-
F
18
TRUNION ON ELBOW WITH SHOE
SDLH
31
-
-
-
F
19
ADJUSTABLE BASE PIPE SUPPORT (ON PIPE)
BS10/ BS10P
32
-
-
-
B+F
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 3 DOC. No. :
Contract No. : 15050901
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
3 of 84
Company Proj. No.: EF/1852
REVISION HISTORY
SUPPLY TYPE
REV.:B
15050901-000-00-PI-PSS-0001
ATTACHMENT-3 PRIMARY SUPPORTS INDEX
TITLE
SUPPORT CODE
SHT. NO. REV 0
REV 1
REV 2
GUIDE SUPPORTS 20
GUIDE, ON BARE PIPE (0.75”–24”) FOR CS/CS-LINED/CLADED/GALV/LTCS.
G1
33
-
-
-
F
21
GUIDE ON BARE PIPE (HIGH TRANSVERSE FORCE) (4”–24”) FOR CS/CS-LINED/CLADED/GALV/LTCS.
G2
34
-
-
-
F
22
GUIDE, ON BARE PIPE – (24” TO 48”) FOR CS/CS-LINED/CLADED/LTCS.
G3
35
-
-
-
F
23
HOLD DOWN FOR BARE PIPE (2”–24”) FOR CS/CS-LINED/CLADED/LTCS.
G4
36
-
-
-
F
24
GUIDE, ON BARE PIPE (2”–24”) FOR SS/DSS/SDSS/NI-ALLOY/CU-NI
G5
37
-
-
-
F
25
GUIDE, ON BARE PIPE –HIGH TRANSVERSE FORCE) - (4”–24”) FOR SS/DSS/SDSS/NI-ALLOY/CU-NI
G6
38
-
-
-
F
26
GUIDE, ON BARE PIPE - (24”–48”) FOR SS/DSS/SDSS/NI-ALLOY/CU-NI
G7
39
-
-
-
F
27
HOLD DOWN FOR BARE PIPE (2”–24”) FOR SS/DSS/SDSS/NI-ALLOY/CU-NI
G8
40
-
-
-
F
28
GUIDE ON PIPE SHOE(1.5”–62”)
SG1
41
-
-
-
F
29
HOLD DOWN GUIDE ON PIPE SHOE (1.5”–48”)
SG2
42
-
-
-
F
30
HOLD DOWN GUIDE ON PIPE SHOE FOR HIGH TRANSVERSE LOADS (8”–48”)
SG2A
43
-
-
-
F
31
GUIDE FOR BASE SUPPORT (2”–48”)
BSG1
44
-
-
-
F
32
GUIDE – ‘U’ BOLT ON BARE PIPE (0.5”–6”)
UBG
45
-
-
-
B
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 3 DOC. No. :
Contract No. : 15050901
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
4 of 84
Company Proj. No.: EF/1852
REVISION HISTORY
SUPPLY TYPE
REV.:B
15050901-000-00-PI-PSS-0001
ATTACHMENT-3 PRIMARY SUPPORTS INDEX TITLE
SUPPORT CODE
SHT. NO. REV 0
REV 1
REV 2
AXIAL STOPS33
LINE STOP ON BARE PIPE ( 0.75” –24”) FOR CS /SS
LS1
46
-
-
-
F
34
LINE STOP ON BARE PIPE ( 26” –48”)
LS1
47
-
-
-
F
35
LINE STOP ON PIPE SHOE (2”–24”)
SLS1
48
-
-
-
F
36
LINE STOP ON PIPE SHOE FOR HIGH AXIAL LOADS (6” –48”)
SLS2
49
-
-
-
F
37
U-BOLT TO GRIP
UBF
50
-
-
-
B
38
LINE STOP FOR BASE SUPPORT (2”–48”)
BSLS1
51
-
-
-
F
SPECIAL TYPE OF PRIMARY SUPPORTS 39
TEFLON PAD SLIDE PLATE ASSEMBLY (FOR SHOE)
TF1
52-53
-
-
-
B
40
TEFLON PAD SLIDE PLATE ASSEMBLY (FOR TRUNNION)
TF2
54
-
-
-
B
41
LOW FRICTION PAD SLIDE PLATE ASSEMBLY (FOR SHOE)
LF1
55
-
-
-
B
42
LOW FRICTION PAD SLIDE PLATE ASSEMBLY (FOR TRUNNION)
LF2
56
-
-
-
B
43
FLANGE HOLDER FOR 150#
FH1
57
-
-
-
F
44
FLANGE HOLDER FOR 300#
FH2
58
-
-
-
F
45
FIRE HYDRANT BASE SUPPORT
BS9
59
-
-
-
F
46
STANDARD ROD HANGER
RH
60-61
-
-
-
B
47
SPRING HANGER
SH
62-63
-
-
-
B
48
RIGID STRUT
RS
64-65
-
-
-
B
49
FLAT CLAMP -GUIDE
FCG
66
-
-
-
B
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 3 DOC. No. :
Contract No. : 15050901
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
5 of 84
Company Proj. No.: EF/1852
REVISION HISTORY
SUPPLY TYPE
REV.:B
15050901-000-00-PI-PSS-0001
ATTACHMENT-3 PRIMARY SUPPORTS INDEX TITLE
SUPPORT CODE
SHT. NO. REV 0
REV 1
REV 2
50
SMALL BORE BRANCH SUPPORT -VENT AND DRAIN
BVD
67-69
-
-
-
B+F
51
BRACING FOR ORIFICE INSTRUMENT CONNECTION
BIC1
70-72
-
-
-
B+F
52
BRACINGS FOR PRESSURE INSTRUMENT CONNENTION (FIELD SUPPORT)
BIC2
73-74
-
-
-
B+F
53
TWO PLANE BRACING FOR SMALL BORE PIPE CONNECTION
DCBVD
75-77
-
-
-
B+F
54
TWO PLANE BRACING-FOR SMALL BORE PIPE CONNECTION
DBVD
78
-
-
-
F
55
LIFTING LUG FOR PIPES
LL
79-80
-
-
-
F
56
PIPE SHOE WITH ACOUSTIC PAD
APS
81
-
-
-
B
57
GUIDE WITH ACOUSTIC PAD
APG
82
-
-
-
B
58
AXIAL STOP WITH ACOUSTIC PAD
APLS
83
-
-
-
B
59
PIPE SHOE WITH TEFLON & ACOUSTIC PAD
APST
84
-
-
-
B
LEGEND
:
B – BOUGHT OUT ITEM
F – FABRICATED ITEM
REMARKS
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 4 Contract No. : 15050901
DOC. No. :
15050901-000-00-PI-PSS-0001
REV.:B
ATTACHMENT– 4
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
1 of 53
Company Proj. No.: EF/1852
SUPPORT DRAWINGS-SECONDARY SUPPORTS (53 SHEETS)
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 4 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
2 of 53
Company Proj. No.: EF/1852
ATTACHMENT-4 SECONDARY SUPPORTS INDEX SL. NO.
TITLE
SUPPORT CODE
SHT. NO.
SUPPLY TYPE
REVISION HISTORY REV 0
REV 1
REV 2
B
1
INDEX SHEET
-
2-5
-
-
-
-
2
SYNOPTIC TABLE
-
6-10
-
-
-
-
3
CANTILEVER SUPPORT-1
CL1
11
-
-
-
F
4
CANTILEVER SUPPORT-2
CL2
12
-
-
-
F
5
CANTILEVER SUPPORT-3
CL3
13
-
-
-
F
6
STANCHION POST-1 (WITHOUT SIDE PROJECTION)
SP1
14
-
-
-
F
7
STANCHION POST-2 (WITHOUT SIDE PROJECTION)
SP2
15
-
-
-
F
8
SUSPENDED BRACKET (WITHOUT SIDE PROJECTION)
SB1
16
-
-
-
F
9
SUSPENDED BRACKET (WITH ONE SIDE PROJECTION)
SB2
17
-
-
-
F
10
SUSPENDED BRACKET (WITH BOTH SIDE PROJECTION)
SB3
18
-
-
-
F
11
ANGLE POST (WITH ONE SIDE PROJECTION)
AP1
19
-
-
-
F
12
FRAME TYPE SUPPORT
SF1
20
-
-
-
F
13
‘J’ TYPE SUPPORT
SF2
21
-
-
-
F
14
U-TYPE SUPPORT
SF3
22
-
-
-
F
15
MINOR TEE POST
MT1
23
-
-
-
F
16
TEE POST -1
TP1
24
-
-
-
F
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 4 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
3 of 53
Company Proj. No.: EF/1852
ATTACHMENT-4 SECONDARY SUPPORTS INDEX SL. NO.
TITLE
SUPPORT CODE
SHT. NO.
SUPPLY TYPE
REVISION HISTORY REV 0
REV 1
REV 2
17
TEE POST -2
TP2
25
-
-
-
F
18
TEE POST -3
TP3
26
-
-
-
F
19
GOAL POST-1
GP1
27
-
-
-
F
20
GOAL POST-2
GP2
28
-
-
-
F
21
GOAL POST-3
GP3
29
-
-
-
F
22
GOAL POST-4
GP4
30
-
-
-
F
23
HORIZONTAL FRAME TYPE SUPPORTS (FOR SMALL BORE VERTICAL LINES)
HSF
31
-
-
-
F
24
TIE BEAM SUPPORT
TB1
32
-
-
-
F
25
ANCHORED BASE PLATE ON CONCRETE
PBC
33-34
-
-
-
B+F
26
STANDARD BASE PLATE ON STEEL
PBS
35
-
-
-
F
27
GUIDE FRAME FOR PIPE GUIDE
GF
36
-
-
-
F
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 4 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
4 of 53
Company Proj. No.: EF/1852
ATTACHMENT-4 SECONDARY SUPPORTS INDEX SL. NO.
TITLE
SUPPORT CODE
SHT. NO.
REVISION HISTORY
SUPPLY TYPE
REV 0
REV 1
REV 2
VESSEL CLIP SUPPORT28
VESSEL PIPE SUPPORT -RESTINGFRAME TYPE
VPS1
37
-
-
-
B+F
29
VESSEL PIPE SUPPORT- REST+GUIDE
VPS2
38
-
-
-
B+F
VPS3
39
-
-
-
B+F
VPS4
40
-
-
-
B+F
30 31
VESSEL PIPE SUPPORT- RESTING FRAME TYPE- (FOR INSULATED AND UNINSULATED PIPES) VESSEL PIPE SUPPORT- REST FRAME FOR GROUP OF PIPES
32
VESSEL PIPE SUPPORT- REST FRAME FOR GROUP OF PIPES
VPS4A
41
-
-
-
B+F
33
VESSEL PIPE SUPPORT- REST FRAME FOR GROUP OF PIPES
VPS4B
42
-
-
-
B+F
34
VESSEL PIPE SUPPORT – REST
VPS5
43
-
-
-
B+F
VPS6
44
-
-
-
B+F
VPS7
45
-
-
-
B+F
VPG1
46
-
-
-
B+F
VPG2
47
-
-
-
B+F
35 36 37 38
VESSEL PIPE SUPPORT- REST & REST+GUIDE VESSEL PIPE SUPPORT- RESTING FRAME TYPE (FOR INSULATED AND UNINSULATED PIPES) VESSEL PIPE SUPPORT – RESTING/GUIDE-SINGLE BRACKET WITH U-BOLT VESSEL PIPE SUPPORT –SINGLE BRACKET FOR SHOE GUIDE
39
VESSEL PIPE SUPPORT –GUIDE BRACKETED FRAME TYPE
VPG3
48
-
-
-
B+F
40
VESSEL PIPE SUPPORT-GUIDE FRAME TYPE
VPG4
49
-
-
-
B+F
REMARKS
DOC. TITLE : PIPE SUPPORTS STANDARD ATTACHMENT - 4 DOC. No. :
Contract No. : 15050901
REV.:B
15050901-000-00-PI-PSS-0001
PAGE
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE -1(60MBOPD)
5 of 53
Company Proj. No.: EF/1852
ATTACHMENT-4 SECONDARY SUPPORTS INDEX SL. NO.
TITLE
SUPPORT CODE
SHT. NO.
REVISION HISTORY
SUPPLY TYPE
REV 0
REV 1
REV 2
PICK UP SUPPORTS 41
PICK UP SUPPORT FROM VERTICAL BARE PIPE
PUVU1
50
-
-
-
F
42
PICK UP SUPPORT FROM VERTICAL BARE PIPE
PUVU2
51
-
-
-
F
43
PICK UP SUPPORT FROM HORIZONTAL BARE PIPE
PUHU3
52
-
-
-
F
44
PICK UP SUPPORT FROM PIPE SHOE
PUHU4
53
-
-
-
F
LEGEND :
B – BOUGHT OUT ITEM F – FABRICATED ITEM
REMARKS
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER
CONTRACTOR DETAILS :
Petrofac DOCUMENT TITLE :-
PROJECT TITLE :-
LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
DRAWING NUMBER