The presentation: Monsanto coming to Europe is a failed mission. Not only that most GMOs are not allowed in Europe, most of the farmers don't even grow the one that are. An analysis of misu…Full description
heal
FYP presentationFull description
Wireless energy transfer is a very exciting technology which promises to radically change the way we perform any activity. In this report I like to explore the concept of transmitting power …Full description
FiCA presentation in MS Power PointFull description
oliverDescripción completa
Clarisse The Label Thesis Presentation by Clarisse Provido
OTIS GEN 2 COMFORT
Full description
Full description
Presentation Goodridge
Green Building Design Evaluation System
fair presentationFull description
Full description
The Shard: structural engineerin
Stålb lbyg yggn gnad adsd sdag agen en 20 2012 12
Height: 72
Storeys:
Sellar Prop on behalf of LB
Client: Architect:
Renzo Piano Building Work Adamson Assoc
Structural engineer:
WSP G
Services engineer: Project manager:
Turner + Town
Cost consultant:
Davis Lan
Main contractor: Piling:
Stent Founda
Steel:
Severfield
127,000 m2
1,367,000 sq
85,000 m2
915,000 sq
5,800 m2
62,000 sq
Hotel:
17,800 m2
192,000 sq
Offices:
55,200 m2
594,000 sq
5,600 m2
61,000 sq
54,000 m3
22 Olympic swimming poo
ross internal area: et internal area: Residential:
Retail olume of concrete: eight of steel: ifts: rea of façade: opulation ar parking spaces:
11,000 tons 44 56,000 m2
8 football pitch
8,000
Burnham-on-Crou
48
Spire Viewing Gallery Apartments Hotel Restaurants Offices
Offices L07 2,900 m L28 1,350m2
Restaurants L31 1,200m2
Hotel L37 1,000m2 L50 670m2
Apartments L53 600m2 L65 270m2
C of G – rectilinear tower C of G – Shard
shard 1
wing wall winter garden
mini backpack (to L20) backpack (to L shard 18
main core backpack core
Jubilee line
London Bridge
station arches Southwark Towers Guys hospital
Top of raft slab -13.4m
-9m
River terrace grav
London clay -30m/-35m
ecant pile wall female pile 960 dia
Lambeth group -45m/-51m TOE LEVEL Secant pile wall male pile
Main bearing piles
1000 dia
1500-1800 dia
Thanet sand -59m/-65m
Chalk
15 total stat ~ 900 monitoring ta
p down 1: secant piled wall
p down 2: bearing piles and plunge columns
p down 3: L00 slab; excavation to B2
p down 4: core slipform set up at B2
p down 5: core slipform started; excavation to B3
p down 6: first hold point – L00 and B2 slabs connected
Façade
p down 7: second hold point – full depth excavation
p down 8: B3 slab cast; core walls completed
Steel
Concrete
Steel
L09
L23
L45
63
Efficient use of materials GGBS in concrete (70% in B3 slab saved 700 tons of cement) Public transport hub Mixed use building Combined heat, cooling and power Façade and automatic blinds BREEAM – brown roof
Spire Viewing Gallery Apartments Hotel Restaurants Offices Backpack