Small and medium sized LNG for power plantFull description
Iluminación para cine. Manual
Iluminación para cine. Manual
Full description
A comprehensive guide to jazz arrangement and writingFull description
lightingFull description
BCOFull description
BS
wmsFull description
A Case Study on Lighting for Museums and GalleriesFull description
Full description
Descrição: Para estudiantes de cine y audiovisual
Export impact for goods - Model contracts for small firms Legal guidance for doing international business (Sách song ngữ) PHÒNG THƯƠNG MẠI VÀ CÔNG NGHIỆP VIỆT NAM - TRUNG TÂM WTO Trung tâm…Full description
Export impact for goods - Model contracts for small firms Legal guidance for doing international business (Sách song ngữ) PHÒNG THƯƠNG MẠI VÀ CÔNG NGHIỆP VIỆT NAM - TRUNG TÂM WTO Trung tâm Thươn...
Descripción: Macrame
Published in 1956, contains photos diagrams and practical ideas for operating small minesFull description
Macrame
Pearl GTL Project LINDE ENGINEERING
Shell Project No: HP-3000-QAT
Contractor Project No:
Project Document Number: T.4.318.621
Project Rev.: O
5887
Page 1 of 15
SUPPLIER/VENDOR DOCUMENTATION Purchase Order Number:
2MH127
Equipment Description:
N/A
Vendor/Supplier Name:
GAMA QATAR CO. W. L. L.
Document Title:
ITP FOR LIGHTING AND SMALL POWER (BUILDING)
Vendor/Supplier Doc Number:
GAM-ITP-QAC-GTL-049
Tag/Item Number(s):
SEE NEXT PAGE
Unit: SEE NEXT PAGE
Vendor/Supplier Code:
LOC470
Vendor/Supplier Revision: C
PCWBS: SEE NEXT PAGE Vendor/Supplier Checked By
Vendor/Supplier Prepared By
Vendor/Supplier Approved By
Initials / Signature
Initials / Signature
SM
KB
Initials / Signature
Vend/Supp Revision Date
AG
19.02.2009
Status of Submission (tick applicable box before submission) Final: Certified: As-Built:
For Review/Info: X
Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.
PURCHASER AREA BELOW Contractor Contract Number:
PI – 092
Contractor Name:
Contractor Doc. No: GAMAC-0100-E-PC 1342
Review Code and Status
Code 1
No Comments. ACCEPTED. Work May Proceed.
Code 2
Comments As Noted. Incorporate Comments, Revise and Resubmit. Work May Proceed.
Code 3
REJECTED. Incorporate Comments, Revise and Resubmit. Work May NOT Proceed.
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
C
19.02.09
Issued For Company Comments
SM
KB
AG
ICC
B
19.02.09
Issued For Review
SM
KB
AG
IFR
A
19.02.09
Issued For Internal Review
SM
KB
AG
IIR
Date
Description
GAMA Rev. No.
Project Rev No.
Prepared Checked Approved By By By ORIGINATOR
Status
Document Title:
ITP FOR LIGHTING AND SMALL POWER (Building) LINDEGINEERING AG Document No.
Contractor
Gama Qatar Co. W. L. L.
LOC470 GAM
ITP
QAC
GTL
049
C
Org. Code
Doc. Type
Disc. Code
Geogr. Area
Seq. No
Rev. No
Project Document Number: T-4.318.621
Vendor Code
Rev No: O
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL- 049
C2 ASU Construction Works
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009
Rev. C
A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
Manufacturer’s Technical data sheet, certificates, visual damage.
T-4.318.619
Manufacturer’s Technical data sheet, certificates, visual damage.
Site Engineer
GAM-QCR-QACGTL-079
R
R
I
R R
I
R R
GAM-QCR-QAC2.2
Small tools and equipment inspection
T.4.318.621 Rev. O
100%
Site Engineer
GTL-174 GAM-QCR-QACGTL-175 GAM-QCR-QACGTL-176
Page 4
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-049
C2 ASU Construction Works
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009 Rev. C A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
ITP FOR LIGHTING AND SMALL POWER (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 19.02.2009 Rev. C A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory) Item
4.0
4.1
4.2
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
T-4.318.616
DEP33.64.10.10 & As per project specification
Site Engineer
DEP33.64.10.10 & As per project specification
Site Engineer
DEP33.64.10.10 & As per project specification
Site Engineer
S
X
C
H
I
H
I
H
I
BUILDINGS LIGHTINGS
Lighting Fixture Installation
100 %
Junction box, switches & outlet installation
100 %
Testing of Cables
100 %
T-4.318.617
T-4.318.616 T-4.318.617
T-4.318.616 4.3
Verifying Documents
T-4.318.617
T.4.318.621 Rev-O
GAM-QCR-QACGTL-181
GAM-QCR-QACGTL-178
GAM-QCR-QACGTL-182
Page 6
A
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY