Descripción: Fire Proofing Guidelines for Steel Structures
Using Ozone for Water Treatment - ASHRAE - 98Full description
Mollier Diagram for Water-Steam
SCAUG ArcGIS for Water Utilities
firewater pump spec
Full description
Descripción completa
demo
waterDescripción completa
Any Dramione fans here???
WaterFull description
Data models that can be produced by the ArcGIS Geographical Information System (GIS) for water utilities - water supply, wastewater disposal, and stormwater drainage.
Data models that can be produced by the ArcGIS Geographical Information System (GIS) for water utilities - water supply, wastewater disposal, and stormwater drainage.Full description
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
D
O
22.12.08
Company Comments Incorporated
SB
EO
AG
CCI
C
O
15.12.08
Issued for Company Comments
SB
EO
AG
ICC
B
08.11.08
Issued for Review
SB
EO
AG
IFR
A
25.10.08
Issued for Internal Review
SB
EO
AG
IIR
Date
Description
GAMA Rev.
Project Rev
No.
No.
Prepared Checked Approved By By By
Status
ORIGINATOR ORIGINATOR
Document Title:
ITP FOR WATER PROOFING (BUILDINGS) LINDEGINEERING AG Document No.
Contractor
Gama Qatar Co. W. L. L.
GAM
ITP
QAC
GTL
043
D
Org.
Doc. Type
Geogr. Area
Seq.
Code
Disc. Code
Rev. No
Project Document Number: T-4.318.705
No
LOC470 Vendor Code
Rev No: O
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-043
C2 ASU Construction Works
ITP FOR WATER PROOFING (Buildings) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 22.12.2008 Rev. D A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
1.0 1.1 2.0
Activity
Test Frequency
Method Statements / Procedures Preparation
Prior to start of activity
100%
2.2
Storage and handling of Water Proofing Materials.
100%
3.2
Responsible Party
Verifying Documents
S
X
C
Subcontractor Method Statements / Procedure
Project Requirements
QA/QC
-
I
R R
Manufacturers Technical data sheet, certificates
QC – Civil Inspector
GAM-QCR-QACGTL- 051
H
R R
Temperature between 600F to 800F & air free
Site Engineer
--------
I
S S
QC – Civil Inspector
---------
I
S
Site Engineer
GAM-QCR-QACGTL-166
I
W S
MATERIALS CERTIFICATES Verification of water Proofing Materials
T.4.234.582, DEP34.17.10.30 & As per project specification T.4.234.582, DEP34.17.10.30 & As per manufacturers manufacturers recommendation
INSPECTIONS Environmental Conditions a) Ambient temp. 1) Surface preparation prior to application of water proofing membrane.
T-4.318.705 Rev. O
100%
100%
T.4.234.582 & As per manufacturers manufacturers recommendation T.4.234.582 , DEP34.17.10.30- & Project Specification
Not less than 600F & Not more than 800F T.4.234.582Procedure for Building works
Page 4
S
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-043
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 22.12.2008 Rev. D A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
2) Application of , a) Slopped Screed (AERCEL) 3) Application of, a) Bonding Adhesive(SureSeal 90-8-30A ) b) Vapour Barriers c) Non-reinforced EPDM membrane (RUSS).
T.4.234.582 , DEP34.17.10.30- & Project Specification & ASTM D 4637
T.4.234.582Procedure for Building works & Manufacturer’s
recommendation
d) Sealant.
T- 4.318.705 Rev-O
Page 5
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-043
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 22.12.2008 Rev. D A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
Activity
Test Frequency
Reference Document
Acceptance Criteria
Responsible Party
Verifying Documents
Manufacturer’s
QC – Civil Inspector
GAM-QCR-QACGTL-165
Site Engineer & QC – Civil Inspector
GAM-QCR-QACGTL-165
S
X
C
I
W S
I
H W
In process inspection a) Seam Fastening Plates 3.3
b) Splicing Cement application(EP95)
a) Visual Inspection d) Adhesion check
T.4.234.582 , DEP34.17.10.30 & Manufacturer’s
recommendation
recommendation
c) Lap Sealant application
3.4
In process inspection of final finishing of water proofing membrane.
T- 4.318.705 Rev-O
a) Visual Inspection d) Adhesion check
Manufacturer’s
recommendation
Manufacturer’s
recommendation
Page 6
A
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-043
C2 ASU Construction Works
ITP FOR PAINTING (Building) S. GAMA QATAR
X. CONTRACTOR QC
C. COMPANY
Date: 22.12.2008 Rev. D A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS(Notification WITNESS (Notification Required but Presence not Mandatory) Item
3.5
3.6
Activity
Disposal of high risk wastes such as catalyst drums, chemical drums for first fill, sealant cans Leakage Test
Check & ensure in Hazard area ,flammable area any paint material
T.4.132.879 & Manufacturers Recommendations
No Leak
Responsible Party
Site Engineer
QC-Inspector (Civil)
Verifying Documents
S
X
Visual
I
R R
Visual
I
W W
Page 7
C
A
QSGTL PEARL PROJECT C2 ASU Constru ctio n Works FORM NO:
CONCRETE POUR CARD
GAM-QCR-QAC-GTL-009
Date :
Area Location & Type of Structure Drawing & Rev No; Quantity Reqd(m3);
Slump(mm): ITP NO:GAM-ITP-QAC-GT NO:GAM-ITP-QAC-GTL L -
Class of concrete;
Rev -
Slump Flow(mm); ITEMS TO BE CHECKED
Inspection
QC Status
Check for Ground Condition Check for filling and compaction Check Minimum blinding thickness as per drawing Coating of blind concrete Blinding concrete satisfactory and QC released for next activity Steel reinforcement fabrication satisfactory as per drawing Form work Erecting Satisfactory (Dimension,Cleanliness,oil (Dimension,Cleanliness,oil and Su ort Anchor Bolts (see Separate survey Report) Report) Embedded Items fixing Satisfactory (Elec/Mech)
All setting outs verified by the surveyor including Dimensions, Dimensions, Locating and Elevation. Blowing with air compressor is Satisfactory Pre pour Inspection Satisfactory
THE APPENDED SIGNATURE GIVES APPROVAL FOR THE PL ACEMENT OF CONCRETE DETAILED DETAILED A BOVE & QC HOLD RELEASED
ORGANISATION NAME SIGNATURE DATE
GAMA QATAR
LINDE
COMPANY
C2 ASU PEARL GTL PROJECT RAS LAFFAN INUSTRIAL CITY MAR (Material Acceptance Report) Project: QSGTL –PEARL GTL PROJECT
MAR No.:
Date:
Manufacturer: PO/Subcontract Number : Description of the Proposed Material: QTY:
No’s:
Note:
Civil
Involved Discipline:
□
Civil / Buildings □
□
Welding □
Instrumental □
Mech. / Piping □
Electrical □
Others
Mechanical
□
…………………..
Location & Usage of the Delivered Material:
Applicable Specifications & Technical Details:
Yes □
Proposed material complies with applicable project specification Attachments:
Inspection Report □ Release Note
Mill Certificates □
□
Data Sheets
No □ Others □
□
Comments:
Carried out By y B d e t p e c c A
GAMA REP. VENDOR REP. LINDE REP. QSGTL REP.
GAM-QCR-QAC-GTL-051
DATE
NAME
SIGNATURE
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY Water Proofing(Buildings) Works Check List Subcontract Ref.:
Report No.:
Item Description: Description:
Date:
Item Location/ Area:
ITP No.:
Subsystem:
Test Code No.:
GAM-ITP-QAC-GTL-
Ref. DWG / Docs: Used Measuring and test equipment ref. (if applicable):