Solving challenges.™
Modelado Integrado de Planes de Desarrollo y Estrategia de Producción en ambientes de Alto Riesgo
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
What is Uncertainty?
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Integrated Decision Process – Key Elements The ultimate purpose of decision analysis is to help decision makers make better decisions. ▌ Seamlessly integrate between the projects’ technical analyses and their economic evaluation.
▌ Careful integration of geological, engineering, economics, and fiscal modeling - all in the
context of the firm’s strategic objectives. ▌ Applicatio Application n of portfolio management management concepts concepts towards the business decisions.
▌ Integrate business strategy and capital allocation to improve overall performance.
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Solving challenges.™
Landmark Customer Value Proposition:
ac e “End t o e n d s u i t e o f s o l u t i o n s b a s e d o n a s i n g l e s u b s u r f ac r e p r e s en en t a t i o n , f o r m o r e a c c u r a t e a n d f a s t e r r e s e r v o i r d e c i s i o n s , d e l i v e r ed ed o n a s i n g l e en en t e r p r i s e p l a t f o r m ”
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
E&P Cash Flow Lifecycle
Production Challenges:
Development Challenges:
• • •
Exploration Challenges:
• • •
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Basin Knowledgement; Increase Reserves; Minimize Risks;
Optimal Production Strategy; Fast Pay-Out; Operation efficiency
• • •
Maximize Recovery; Extend Economic life; Efficiency;
Landmark E&P Lifecycle Management Ecosystem DS Platform & Ecosystem
Production History Matching Integration, Automation, Optimization, Risk & Uncertainty Analysis
Field Development Plan Petroleum System Migration modeling
Real Time Centers Decision
Well, Completion Planning & Simulation
Geophysical data Processing & Interpretation
Reservoir Flow Simulation
From Time to Depth: Velocity Model
Economic Analysis Cash Flow Model Loop
Geological Interpretation and Modeling
Migration History Matching
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Drilling, Postdrill Review, & Monitoring
Volumetric Uncertainty Analysis
Production Monitoring & Optimization
Expand Portfolio
Petroleum migration and reservoir filling
Rock and fluid alteration
Dynamic migration simulation
Migration history match
Expand portfolio – Minimal Volume – Geologic Risk – Chance of Success – Portfolio optimization
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
DS Geoscience: From Geophysical into Geological world All-in-one integration and multi-user collaboration tools
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Reservoir Modeling Workflow Exploratory Data Analysis
Structural Framework
Stratigraphic Model
Facies Model Facies Model
History Matching Analysis
OpenWorks
History Prediction
Upscaling - Simulation GridProbe, PowerGrid, Nexus
Post Processing & Uncertainty
P10 P50 P90 © 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Petrophysical Model P10 P50 P90
Integration & Operational Efficiency
DecisionSpace® Drilling & Completion
Real Time Service Company
Planning & Engineering
High Science Geomechanics
Well path
Casing
Drilling
*WITS/WITSML DrillWorks Collaboration
LWD Mud logging
Audit & Control Max Activity
DS Insite
Zeta
Insite © 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Risks
EDT DecisionSpace
Detect & Predict
s d r a o b h s a D
Completion
Reports & Analytics
Data Analyzer
Governance & Compliance
OpenWells Barrier Assurance
OpenWorks Pressworks EDM
BDIEP
Information & Integration Foundation 3º Party
Nexus - Next generation simulators
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Traditional Decision Process – Economic analysis
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Palantir & Landmark Solutions
Founded in 2002
Products:
–
Production and economic
PalantirCASH, PalantirPLAN, PalantirRESOURCE, PalantirRESERVES, PalantirFINANCIALS, PalantirDATAFLOW
120 employees with locations in Aberdeen, Bangalore, Calgary, Houston, London, Perth, Singapore The largest independent provider of integrated economics and planning solutions 40 clients, which include: Occidental, Nexen, Maersk, Apache, Vitol, Tullow Oil, GDF Suez Website: http://www.palantirsolutions.com/
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Portfolio planning and optimization
Decision Management: Learn & Efficiency
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Landmark Reservoir Surveillance
Collaborative Workflows
• • • •
Key Performance Monitoring Reservoir Visualization & Analysis Production losses Report & Action Distributions
Over 100 successful projects!
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Experience: 100+ Implemented Workflows Reservoir Visualization & Analysis Artificial Lift Smart Production Surveillance KPI Monitoring
Production Optimization Production Losses Well Performance Evaluation Well Test Validation Facility Monitoring
Production Allocation Reporting & Distribution Oil Hauling & Tank Management History Matching Water Flooding Optimization Well Model Update
Integrated Asset Modeling Field Development Planning Virtual Metering
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Landmark E&P Lifecycle Management Ecosystem DS Platform & Ecosystem
Production History Matching Integration, Automation, Optimization, Risk & Uncertainty Analysis
Field Development Plan Petroleum System Migration modeling
Real Time Centers Decision
Well, Completion Planning & Simulation
Geophysical data Processing & Interpretation
Reservoir Flow Simulation
From Time to Depth: Velocity Model
Economic Analysis Cash Flow Model Loop
Geological Interpretation and Modeling
Migration History Matching
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Drilling, Postdrill Review, & Monitoring
Volumetric Uncertainty Analysis
Production Monitoring & Optimization
Landmark Reservoir Management Provide a robust software workflow for optimizing the lifecycle of an asset
Determine facility effects on reservoir deliverability
Examine model sensitivities and capture development risk
Improve speed of decision-making through automation and analysis
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Traditional Decision Process – Dynamic Simulators
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
How Nexus is like other reservoir simulators
Black oil and compositional fluid types
Single and dual porosity rock models
Fully implicit and IMPES timestepping
Multiple
grid input formats (DS Earth Modeling VDB, RESCUE, …)
Radial and Cartesian local grid refinements which can be activated and deactivated during the run
Polymer flooding with shear thinning/thickening
Non-Darcy flow in wells and in the simulator grid
– –
Velocity-dependent gas flow
Knudsen diffusion
Single and multi-component adsorption/desorption
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Traditional Decision Process – Facilities Simulators
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Unified, fully coupled surface and subsurface modeling
Simultaneous solution of reservoir and network Fully-implicit coupling for surface Easy creation of pipelines and gathering centers
Various two-phase flow correlations available for network modeling, as well as tabular hydraulics methods Flexible well management scripting: procedures which inform Nexus how to operate the field based upon current results
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Intuitive visualization of the surface network
Nexus SurfNet provides insight into network
–
View the entire network, or any subset from perfs to sales point
– Analyze network bottlenecks – Create high-quality charts and documents
Create network framework for use as Nexus input
–
User can build and save the structure of the network
–
Network can then be imported into the SimDataStudio model builder
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Nexus multi-reservoir runs: from one reservoir to many
Nexus multi-reservoir workflow retains the integrity of individual models
– Build each reservoir model individually – Perform history match – Add private surface network to each model – Perform initial predictions – Build multi-reservoir model with shared network, including each of the individual reservoir models
without modification
–
Run multi-reservoir predictions
Production use in cases with 10+ reservoirs sharing a network
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Complex well modeling
Wells are treated as multi-segmented
– Accurate hydraulics –
Stable computation
Realistic completions and well configurations
–
Multi-lateral and other branched wells with proper fluid mixing
–
Configure simple wells, cased wells, tubing/annulus strings
–
Modeled wellbores can contain ICDs, ICVs, and ESPs
Users can accurately represent and simulate complex completions
New link to NETool: build completion in NETool, export matching Nexus input
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Modeling of Complex Completion and ICDs What Netool Does
A Steady-State Near Wellbore and Completion Hydraulics Simulator Designed to model in detail production section of the well with a simplified modeling of reservoir inflow Address potential production problems Troubleshoot poorly performing wells
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Gas/Water Coning Control
Dual porosity and beyond: multiple porosity types
Nexus models multiple porosities sharing the same physical location Can be used to model hydraulic and natural fractured systems, and vuggy carbonates
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Nexus Shale Reservoir Simulation
Unstructured Grid
Undefined gridding capability
Multi-component porosity and permeability capabilities
– Natural fractures – Matrix perm – Kerogen perm – Micro fracture perm © 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Nexus - Performance
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Nexus Performance
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Parallel scalability builds on already good performance
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Field Development Plan & Production Strategy
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Better Decision Making, Better Results TRADITIONAL APPROACH
Cannot evaluate total asset until late in the process
Not Collaborative, operating in silos
Only possible to evaluate 2 or 3 scenarios
Often results in sub-optimal Decisions
Current workflows Serial/linear in nature little opportunity to make input/data changes throughout the workflow –
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Better Decision Making, Better Results TRADITIONAL APPROACH
Cannot evaluate total asset until late in the process
Not Collaborative, operating in silos
Only possible to evaluate 2 or 3 scenarios
Often results in sub-optimal Decisions
Current workflows Serial/linear in nature little opportunity to make input/data changes throughout the workflow –
NEW APPROACH •
•
•
•
•
Iterative and flexible process Robust framework to evaluate total asset early in the process
New workflow
Framework enables many scenarios to be evaluated rapidly
Multiple domain Risk and scenario analysis Optimization technology
Achieve optimal decisions based on business objectives Traceable and Repeatable workflow
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Multiple domain risk and scenario analysis STATE UNCERTAINTIES
OBJECTIVE
• • • • •
Maximize recovery/NPV at a risk tolerance
•
DECISIONS & CONSTRAINTS
) Case 7 M M Case 2 $ ( V P N 1000
800
Scenario 1
Case 6
600
200
• •
0
100
200
300
•
Ad hoc (case study) Uncertainty Stochastic simulation Optimization Neural Network Experimental design •
•
0
400
Iteration / Case
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
•
•
400
IRR, $$, OIL
•
Wells Ownership Facilities Strategy Scheduling Investment Sizing
PROCESS Scenario 2
Risk
•
•
Hurdle rate y t i l i b a b o r P
•
Volume Productivity Compartmentalization Properties Costs Rig availability
500
• •
What Decision Management System does…. DMS combines Simulation tools…with...Optimization & Uncertainty technology in an
Open and Adaptable framework.
Optimization
• • • •
Forward Modeling
(SPE paper 84239)
Well Planning Optimization
(SPE paper 96986)
Facilities Planning
(SPE paper 95528)
Assisted History Matching
(SPE paper 101933)
Uncertainty Analysis
Optimization with Uncertainty
•
(SPE paper 79703)
Portfolio Optimization
Input parameters Optimizer, Uncert Driver
Simulator 1
DMS Responses
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
(SPE paper 90177)
Simulator 2
Decision Management System – Optimization Minimize
f x
x sin x
Objective vs iteration 350 250 150 50 -50 0 -150 -250 -350
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
1000
2000
3000
4000
Decision Management System – Optimization
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Decision Management System – Uncertainty Analysis
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Decision Management System – Stochastic simulation
80000000
60000000
) $ ( V P N n a e M
40000000
20000000
0
-200000...
-400000...
-600000...
2 00 0 00 00
2 50 0 00 00
3 0 00 0 00 0
3 50 0 00 00
4 00 0 00 00
_ I
4 5 00 0 00 0
NPV variance ($)
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
5 00 0 00 00
5 50 0 00 00
6 0 00 0 00 0
6 50 00 0 . .
DMS - Technology Convergence ▌ Technical Software • •
Eclipse, PETEX Spreadsheet, Nexus
• •
Monte Carlo, Experimental design Latin hypercube, Proxy models
• •
Maximize & Minimize Objective Function
•
Subsurface + Surface + Economics
▌ Uncertainty Analysis ▌ Optimization Techniques ▌ Integrated Solution ▌ Process Automation ▌ High Performance Computing
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Landmark Reservoir Management Solutions
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Success Sotry
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Nexus Evaluation: San Alberto Field Bolivia Improve Reservoir Modelling and Save Time 2015 CASE STUDY
• • • •
Improve simulation time performance Input for pipes, separators, chokes and valves Multi-porosity modelling Full asset modeling in a single package
• • • •
Migrates Eclipse model into Nexus Migrates GAP model into Nexus Nexus Tightly coupled subsurface and surface Parallel Scalability San Alberto Scalability 16.00
14.00
• • •
12.00
6x times faster than Eclipse Integrated modelling in a single package 4x times faster than Eclipse running coupled surfacesubsurface modelling as a single platform
O10.00 I T A R D 8.00 E E P S 6.00
4.00
2.00
0.00 0
2
4
6
8
10
#PROCESSORS
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
12
14
16
18
DMS Evaluation: San Alberto Field Bolivia Increase Gas Production through Optimized Wells positioning 2014 CASE STUDY
• • • •
Minimizes Gas production uncertainties Improve Total Gas production Decrease Total Water production Improve scenarios evaluation
• • • •
Decision Management System - DMS Risk & Uncertainty analysis Optimal Wells positioning and rates Integrated & Automated evaluation process
•
31% gas production increase from offset wells through optimized positions and rates Total water production decreased by 6% Hundred scenarios evaluated in 5 days
• •
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
Who to Contact, Where to get more information Kellerman Novaes Regional Business Tech. Lead – Latin America
[email protected]
Phone: +54 11 4329 2308 Cell: +54 9 11 58726852
www.halliburton.com/
Twitter
© 2015 HALLIBURTON. ALL RIGHTS RESERVED.
FaceBook
LinkedIn
YouTube
Google+
Oilpro
Blog
RSS Feeds